Decision Notice - 010.2007.00001490.001 [As Published] · 152007.1490
NOOSA COUNCIL IDAS Development Application Decision Notice 8 of 10
Local Laws, Policies & State
Regulation Requirements
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
CONDITIONS OF APPROVAL
1. The following steps shall be undertaken prior to commencement of any construction:-
1.1. The Principal Contractor shall give Council's Inspector seven (7) days' notice of intention to
commence works.
1.2. The Principal Contractor or any of his subcontractors shall not undertake any works unless each
contractor has public liability insurance in the sum of $10,000,000 and copies of current public
liability insurance policies are submitted to Council’s inspector.
1.3. The Principal Contractor shall nominate a site representative and give a telephone number that
can reach the site representative at any time during a 24-hour day.
1.4. The site representative shall arrange to meet on-site with Council's Inspector to obtain Council's
requirements for construction of access.
1.5. All signage, including that for safety during construction, shall be in accordance with the Manual of
Uniform Traffic Control Devices and Department of Transport (Main Roads Division) Roadworks
Signing Guide.
2. Prior to the issue of a Development Permit for Operational Works, the applicant shall comply with the
requirements of the Building and Construction Industry (Portable Long Service Leave) Act 1991. In this
regard, a statutory declaration outlining the cost of building and construction works, as defined in s73.(1)
of the Act, shall be submitted in conjunction with an application for Operational Works. If payment of the
levy is required, the approved forms as outlined in s77.(1), must also be sighted by the assessment
manager.
3. The development should be undertaken and operated in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions in accordance
with the nuisance provisions of the Environmental Protection Regulation 1998 or Council’s Local Law No.
12 – Control of Nuisances.
4. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement,
concrete, builder’s waste or rubbish should not be permitted to enter or be placed where it could
reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot
fines apply for such offences.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@cc01df72\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00001490.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 43 KB (small file)
- File type
No other editions are linked here.