NOOSA COUNCIL IDAS Development Application Decision Notice                                                  8 of 10



                                      Local Laws, Policies & State
                                      Regulation Requirements
                                      INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


     THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
                             CONDITIONS OF APPROVAL

1.      The following steps shall be undertaken prior to commencement of any construction:-

        1.1.   The Principal Contractor shall give Council's Inspector seven (7) days' notice of intention to
               commence works.

        1.2.   The Principal Contractor or any of his subcontractors shall not undertake any works unless each
               contractor has public liability insurance in the sum of $10,000,000 and copies of current public
               liability insurance policies are submitted to Council’s inspector.

        1.3.   The Principal Contractor shall nominate a site representative and give a telephone number that
               can reach the site representative at any time during a 24-hour day.

        1.4.   The site representative shall arrange to meet on-site with Council's Inspector to obtain Council's
               requirements for construction of access.

        1.5.   All signage, including that for safety during construction, shall be in accordance with the Manual of
               Uniform Traffic Control Devices and Department of Transport (Main Roads Division) Roadworks
               Signing Guide.

2.      Prior to the issue of a Development Permit for Operational Works, the applicant shall comply with the
        requirements of the Building and Construction Industry (Portable Long Service Leave) Act 1991. In this
        regard, a statutory declaration outlining the cost of building and construction works, as defined in s73.(1)
        of the Act, shall be submitted in conjunction with an application for Operational Works. If payment of the
        levy is required, the approved forms as outlined in s77.(1), must also be sighted by the assessment
        manager.

3.      The development should be undertaken and operated in a manner that causes no detrimental effect upon
        the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
        hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions in accordance
        with the nuisance provisions of the Environmental Protection Regulation 1998 or Council’s Local Law No.
        12 – Control of Nuisances.

4.      In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement,
        concrete, builder’s waste or rubbish should not be permitted to enter or be placed where it could
        reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot
        fines apply for such offences.




NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@cc01df72\@[email protected]

Used in these records

About this file

File size
43 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00001490.001 [As Published].pdf · 43 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.