Skip to the record
Beware of cheap imitations.

Original source · versioned page text

MCU14/0056 - Attachment H -Economic Needs Assessment

of 140

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                          Corner Myall Street & Ferrells Road Cooroy, QLD 4563
                                                                Earthworks Code



Earthworks Code
Specific Outcomes                                  Acceptable Solutions/Probable Solutions                  Compliance


Dams                                               S11.1 Where the site is in the Rural Zone—               Not applicable
O11 Dam location and construction does not         a) the land has a slope of less than 25% (1:4); and
impact upon neighbouring properties in terms       b) the earthworks including cut and fill batters and
of—                                                retaining walls are setback a minimum of 50m from
a) hydrology;                                      the property boundary; and
b) alteration of existing overland flowpaths and   c) the size of the lot is greater than 5 Hectares; AND
patterns;                                          .
c) landslide or failure of dam wall; and
                                                   S11.2 Where the site is in the Rural Settlement Zone     Not applicable
d) effluent disposal areas.
                                                   or the Rural Zone where the lot is less than 5
                                                   Hectares—
                                                   a) the land has a slope of less than 1:6; and
                                                   b) the earthworks including cut and fill batters and
                                                   retaining walls are setback a minimum of 20m from
                                                   the property boundary; and
                                                   c) involving less than 500m3 of material; AND
                                                   S11.3 For all other zones—                               Not applicable
                                                   No solution provided
Log in to download the original file

MCU14_0056 - Attachment H -Economic Needs Assessment.pdf · 12.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.