Original source · versioned page text
MCU14/0056 - Attachment H -Economic Needs Assessment
Very large file: it may take a few minutes
The original of this document is very large (12.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Corner Myall Street & Ferrells Road Cooroy, QLD 4563
Transport, Roads and Drainage Code
Transport, Roads and Drainage Code
Transport, Roads and Drainage Code
Specific Outcomes Acceptable Solutions/Probable Solutions Compliance
14.145 Strategic Transport Network
O1 Traffic generation from the development is S1.1 Where the development leads to the need to increase Refer to Traffic Engineering Report
considered in a localised and a Shire wide context transport infrastructure in the Shire, the development prepared by others. Typical.
to ensure that— contributes to the transport network in accordance with
the requirements of the applicable infrastructure charging
a) the transport network has the capacity to instrument and the Priority Infrastructure Plan in Part 15;
safely and efficiently accommodate projected and where developments requires infrastructure not
movements; and/or included in the priority infrastructure plan, the
b) the development includes measures to development upgrades the infrastructure at no cost to
upgrade the transport network to meet the Council.
imposed demands. Advisory note
Council may for some development require the preparation
of a Transport Impact Assessment Report. Planning Scheme
Policy PSP1 details matters to be addressed in the Report.
S2.1 Road planning and development design facilitates as Refer to Traffic Engineering Report
O2 The street network has high street many pedestrian and cycle movements as possible and prepared by others. Typical.
connectivity, both within the development and to provides for future connectivity and integration with
the surrounding local area. adjoining sites; AND
S2.2 Arterial and sub-arterial roads are designed so they
can operate with high volumes of traffic during peak times;
AND
S2.3 Collector and local streets are provided to support
short trips for local traffic moving in and between
neighbourhoods. Local traffic is channelled towards
collector streets to ensure that traffic volumes on local
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.