Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

MCU14/0056 - Attachment H -Economic Needs Assessment

of 140

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                             Corner Myall Street & Ferrells Road Cooroy, QLD 4563
                                                            Transport, Roads and Drainage Code


Transport, Roads and Drainage Code
Specific Outcomes                                 Acceptable Solutions/Probable Solutions                        Compliance
                                                  S2.12 Street block lengths are not more than 240 m long,
                                                  and predominantly around 150-180 m long. Street block
                                                  lengths are generally shorter closer to town and
                                                  neighbourhood centres; AND
                                                  S2.13 Direct, safe and attractive pedestrian and cycle
                                                  routes are provided within and through the development
                                                  and connect to bus stops.
                                                  S3.1 Higher density development is concentrated along          Refer to Traffic Engineering Report
O3 Development is designed –                      public transport Routes; AND                                   prepared by others. Typical.
a) To encourage travel by community transport,
                                                  S3.2 There is provision for bus routes through development
walking and cycling rather than by private car;
                                                  sites; AND
and
b) To maximise accessibility via existing and     S3.3 Bus routes are located to maximise patronage
planned community transport facilities            catchment and to consider personal safety, lighting and
                                                  traffic management; AND


                                                  S3.4 At least 90 percent of all residents are located within
                                                  400 metres of an existing or planned bus route; AND




                                                  S3.5 Pedestrian and cycle movement is provided within
                                                  local streets to and through development; AND



                                                  S3.6 Attractive and safe pedestrian and cycle connections
                                                  are provided with shade trees, graded walking and cycle
Log in to download the original file

MCU14_0056 - Attachment H -Economic Needs Assessment.pdf · 12.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.