Original source · versioned page text
MCU14/0056 - Attachment H -Economic Needs Assessment
Very large file: it may take a few minutes
The original of this document is very large (12.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Corner Myall Street & Ferrells Road Cooroy, QLD 4563
Water Supply & Sewerage Reticulation Code
Water Supply & Sewerage Reticulation Code
Water Supply & Sewerage Reticulation Code
Specific Outcomes Acceptable Solutions/Probable Solutions Compliance
Table 14-62 Water supply
14.164 Design and construction (water)
O1 Water supply infrastructure— S1.1 Water supply infrastructure is designed in accordance The proposed development works will
a) meets the needs of the users; with PSP6 – Engineering Design Standards — Water and comply with this requirement, with
b) is designed to be compatible with existing Sewerage and As Constructed data submitted in the proposed internal water supply
infrastructure; and accordance with PSP6 – Engineering Design Standards — being constructed in accordance with
c) is designed using materials that are suitable for Water and Sewerage. AS3500.
the use, durable, easy to maintain and cost Water reticulation will be designed
effective, taking into account the whole of life and constructed in accordance with
cycle cost and Council’s maintenance inventory. SEQ D & C Code and PSP6 Engineering
Design Standards – Water and
Sewerage.
O2 Water supply infrastructure is constructed— S2.1 Water supply infrastructure is constructed in The proposed development works will
a) in accordance with appropriate engineering accordance with PSP6 – Engineering Design Standards — comply with this requirement.
standards; and Water and Sewerage; AND
b) to minimise adverse environmental impacts.
S2.2 Erosion and sediment control measures are designed The proposed development will
and implemented in accordance with the Institution of incorporate erosion and sediment
Engineers Australia (Queensland Division) Soil Erosion and control measures as shown on the
Sediment Control - Guidelines for Queensland Construction preliminary civil engineering design
Sites. drawings.
O3 Water supply infrastructure is proven to be No solution provided. The proposed development works will
suitable for its use prior to Council accepting the comply with this requirement, with
dedicated asset. the proposed internal water supply
being constructed in accordance with
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.