Original source · versioned page text
MCU14/0056 - Attachment H -Economic Needs Assessment
Very large file: it may take a few minutes
The original of this document is very large (12.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Corner Myall Street & Ferrells Road Cooroy, QLD 4563
Water Supply & Sewerage Reticulation Code
Water Supply & Sewerage Reticulation Code
Specific Outcomes Acceptable Solutions/Probable Solutions Compliance
AS3500.
Water reticulation will be designed
and constructed in accordance with
SEQ D & C Code and PSP6 Engineering
Design Standards – Water and
Sewerage.
O4 Water supply infrastructure is provided with No solution provided. The proposed development works will
all supporting technical documentation comply with this requirement.
O5 Where buildings or other structures are in S5.1 The footing of any building or structure is located clear Not applicable, as no buildings are
proximity to State or Council’s water supply of the zone of influence but no closer than 1.5m (measured proposed adjacent to existing
infrastructure, provision is made to protect the horizontally) from infrastructure including sewers, water infrastructure.
infrastructure from physical damage and to allow mains and stormwater structures; AND
ongoing maintenance by Council.
S5.2 A registered easement in favour of Council is created Not applicable, as no buildings are
over all underground infrastructure located in private proposed adjacent to existing
property; AND infrastructure.
S5.3 The width of the easement is the greater of 3m or the Not applicable, as no buildings are
width of the zone of influence; AND proposed adjacent to existing
infrastructure.
S5.4 The easement is centred over the centreline of the Not applicable, as no buildings are
infrastructure. proposed adjacent to existing
infrastructure.
O6 Alignment of water supply infrastructure S6.1 Infrastructure is designed and constructed on the The proposed development works will
allows for easy access for the ongoing preferred alignments in accordance with PSP6 Engineering comply with this requirement.
maintenance by Council. Design Standards – Water and Sewerage.
O7 Any alterations or repairs to infrastructure as S7.1 Any alterations or repair to infrastructure as a result of The proposed development works will
a result of the development are made at no cost the development are completed at the developer’s comply with this requirement.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.