Original source · versioned page text
MCU14/0056 - Attachment H -Economic Needs Assessment
Very large file: it may take a few minutes
The original of this document is very large (12.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
DESCRIPTION Design Parameter Notes
Developable Area 5.064ha
Service Station = 1460m2 = 15EP 1.00 EP/100m2 GFA
Self-Storage = 100m2 = 1EP 1.00 EP/100m2 GFA (Office Only)
Tourist Park = 37du = 89EP 2.40 EP/du (Units)
EP
Tourist Park = 320m2 = 4EP 1.00 EP/100m2 GFA (Office)
Future = 5800m2 = 58EP 100 EP/ha
TOTAL = 167EP
= 200L/EP/day
ADWF = 200 x 167 Noosa PIP DSS Table 3.2
= 33400L/day
= 5 x ADWF SEQ WS & S D&C Code - Design
PWWF = 5 x 33400
Criteria - Table 10
= 167000L/day
C2 x ADWF
= (4.7 x (EP)-0.105) x ADWF SEQ WS & S D&C Code - Design
PDWF
= (4.7 x (167)-0.105) x 33400 Criteria - Table 10
= 91720L/day
Table 6.1: Preliminary Sewer Pump Station Design
Abbreviations:
ADWF Average Dry Weather Flow OPS Operating Storage
DSS Desired Standard of Service PIP Priority Infrastructure Plan
du Dwelling Unit PS Pump Station
ET Equivalent Tenements PWWF Peak Wet Weather Flow
EP Equivalent Populations PDWF Peak Dry Weather Flow
GFA Gross Floor Area Q Pump Rate
N Number of Starts per Hour
After discussions with Noosa Council Engineers, vT Consulting Engineers were advised that as
the sewer and water supply are to be taken over by Unitywater as of 1st July 2014, the
proposed sewer design should meet Unitywater standards and requirements. Unitywater
advised that the water supply and sewer demand factors used in the table above are to be
taken from the Maroochy Plan (2000) Table 2 (a) which Unitywater has advised is suitable for
the design of the pump station.
For more details of the sewer reticulation refer to the engineering plans in Appendix B.
Internal house drainage design for this proposed development will be by others.
A PO Box 26, Carina Q 4152 21 | P a g e
E [email protected]
W www.vtce.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.