Skip to the record
The gold standard in government transparency.

Original source · versioned page text

MCU14/0056 - Attachment H -Economic Needs Assessment

of 140

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                                                                                           ENG
                                               Engineering Report & Stormwater Management Plan
                                       Date:          16/06/2014     Document No.:     14012-ENG-01.Docx

                                        By:              AvT          Revision No.:              B


 7. Water Reticulation

A new domestic water supply is proposed to service the new proposed multi-use
development. A new property connection will be provided to the site from Myall Street.
Associated water connections will be installed on Myall Street. Proposed fire hydrants are
located along the central internal road to service the new proposed buildings and Tourist Park.
For more details refer to the engineering plans in Appendix B.

Roof water harvesting tanks are proposed for this development as part of the stormwater
quality treatment train and to reduce the water demand on the reticulated town water supply
system.

The collected water is intended to be used for non-potable uses such as toilet flushing and
landscape irrigation. In the event that the roof water harvesting tank is empty after long
periods of drought, the reticulated town water supply system will be used. The reticulated
town water supply system will be protected from potential backflow with the use of a
backflow prevention device that complies with AS/NZS3500.

To reduce the water demand on the roof water harvesting tank and the reticulated town
water supply system it is intended that all fixtures will be water efficient appliances.

The Internal water supply design for this proposed development will be by others.


 8. Electrical and Telecommunication

The electrical supply and communications supply for this proposed development will be by
others.


 9. Acoustic Assessment

The acoustic requirements and design for this proposed development will be by others.




A PO Box 26, Carina Q 4152                                                                22 | P a g e
E [email protected]
W www.vtce.com.au
Log in to download the original file

MCU14_0056 - Attachment H -Economic Needs Assessment.pdf · 12.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.