Original source · versioned page text
water quality code
Performance Outcomes Acceptable Outcomes
AO11.5
Floodplain management is designed in accordance with the
Framework for the Integration of Flood and Stormwater
Management into Open Space published by Healthy Waterways
Water by Design (version current at the time of development
application) Able to Comply
PO12 AO12.1
Development protects instream ecology by maintaining pre Where runoff from or within the site passes through or drains to
development low flow discharge regimes and maintaining fish natural channels, waterways or wetlands, development protects in
passages. steam ecology by maintaining predevelopment low flow
discharge regimes in accordance with the frequent flow
management objectives in PSP6 Engineering Design Standards
Roads, drainage and earthworks
Able to Comply
AO12.2
Instream structures such as roads, bridges, culverts, and other
stormwater infrastructure do not cause barriers to fish passage
and facilitate the movement of terrestrial and aquatic fauna along
waterway corridors.
Not Applicable - related to new infrastructure
AO12.3
Benthic substrate retains a continuous grade with the direction
of flow consistent with the natural bed profile. Able to Comply
PO13 AO13.1
Development is designed and constructed to maintain surface The location and form of stormwater discharge points do not alter
and ground water balances that sustain the environmental values the predevelopment hydrology of receiving surface water or
of water dependent ecosystems, including downstream aquatic, groundwater. Able to Comply - minimal changes onsite only
riparian, wetland and terrestrial ecosystems. affecting the onsite small swales to convey water
AO13.2 to creek (legal point of discharge).
Developments located on groundwater recharge or discharge
areas are designed and managed in accordance with a
groundwater recharge and discharge management plan prepared
by a suitably experienced and qualified groundwater hydrologist.
The groundwater recharge or discharge must demonstrate that
the development does not affect groundwater balances beyond
the property boundaries.
Not Applicable
Editor's Note— PSP6 Engineering Design Standards Roads,
drainage and earthworks provides guidance on prepare a
groundwater recharge and discharge plan.
Construction and establishment of stormwater management systems Table 9.4.8.3 Criteria for
assessment (part)
Performance Outcomes Acceptable Outcomes
Construction and establishment of stormwater management
systems
PO14 AO14.1
Construction methods provide for appropriate controls to avoid An erosion and sediment control plan prepared in accordance
entry and transport of litter, sediment, and associated with the International Erosion Control Association Best Practice
Books demonstrates that the capture and release of stormwater
prescribed water contaminants into receiving waters.
achieves the design objectives listed in Table A: Construction
phase – stormwater management design objectives of the State
Editor's note— Water contaminants are prescribed in the Planning Policy (Appendix 2).
Environmental Protection Act 1994. Able to Comply
NOOSA PLAN 2020 AMENDED AT 25 SEPTEMBER 2020 Page 5 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.