Original source · versioned page text
PM Submission - John Cochrane - MCU21/0110
“Adamson Town Planning, specialising in providing higher order town planning advice”
4. Water Supply:
a) We believe the existing facility is connected to reticulated water and this will be
sufficient for the proposed hotel, hydraulic engineering consultants should ensure
there is capacity to meet potential needs should a structural and/or vegetation fire
threaten the structures.
b) Sufficient hydrant standpipes or inground hydrants are to be located within and
around the facility to ensure compliance with relevant guidelines and standards.
c) It is noted that the golf course also has extensive irrigation separate to reticulated
supply, sourced from a local lake, and this could be channelled into an auxiliary
supply for bushfire purposes.
5. Future planning
a) A Bushfire Management Plan will be required due to the facilities proximity to
identified bushfire hazard areas.
b) An emergency response plan which will include an evacuation plan should also be
considered to provide a set of responses should a vegetation fire involve adjacent
vegetation and visitors and staff need to be located to ensure they are safe until the
fire is brought under control by the relevant authorities.9
It is noted that during the public information process, some of the existing residents raised a
concern about the risk from bushfire from within the Noosa Springs estate itself; however, this
issue is beyond what can be reasonably considered under this development application.
Having regard to the advice provided by the bushfire expert (above and in Appendix E), the
following comments are made about the most relevant overall outcomes under the Bushfire
Hazard Overlay Code:
a) the proposed development is located within an area at risk from bushfire hazard but is
compatible with the nature of the hazard (OO(a));
b) subject to the implementation of the recommendations made by the bushfire expert the
risk to people, property and the natural environment from bushfire hazard is minimised
(OO(b));
c) the development will not result in a material increase in the extent and severity of bushfire
hazard (OO(c));
d) the bushfire risk mitigation treatments can be accommodated in a manner that minimises
impacts on the natural environment and ecological processes (OO(d));
e) the development supports and does not unduly burden disaster management response
or recovery capacity and capabilities (OO(e)); and
f) the development will not result in the release of hazardous materials as a result of a
bushfire hazard event (OO(g)).
The proposed development meets the above overall outcomes. Further, the proposed
development meets the purpose of the Bushfire Hazard Overlay Code in that the development
avoids and or mitigates the potential adverse impacts of bushfire on people, property, economic
activity, and the environment.
9 Bushfire Hazard Assessment, Recommendations, page 15
Noosa Springs Boutique Hotel – GH Australia Pty Ltd Page 46
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (PM Submission - John Cochrane - MCU21_0110.msg)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.