Council archive · source document
A6107 Complete Set · OPW18/0155
Attached to the e-mail Operational Works Application OPW18/0155 - Proposed Plans Stages 4A & 4B (Email 3 of 4).msg.
Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
x
Sy
SKS
6
sere
60
SO
SO
SO
<
KO
Se
Se
XO
S
SSS
x
x
SSS
SSO
S
x
<S
<>
i
>
oS
os
EARTHWORKS PAD
LEVEL RL14.9 (NOM)
ZF 7
Pe TEMPORARY SITE
CONSTRUCTION
ENTRY/EXIT
REFER DETAIL PESC04
SEDIMENT BASIN ‘2’.
REFER DETAIL
ALL STAGE-8 SURFACE RUNOFF
TO BE DIVERTED-TOQ SEDIMENT
BASIN '2'. (BASIN CONSTRUCTED
AS PART OF STAGE 4A WORKS)
PROPOSED SEDIMENT BASIN AREAS
150mm COMPACTED GRAVEL
HARDSTAND CBR15
ea 150mm CBR15 TEMPORARY PAVEMENT
BIDIM A14 GEOFABRIC PINNED TO
TEMP. BATTERS AS INDICATED
(AS DIRECTED)
° 8.90 PROPOSED EARTHWORKS LEVEL
=m mm mm me mm mm =©PROPOSED SHEET PILING
PROPOSED TOP OF BATTER
PROPOSED TOE OF BATTER
PROPOSED SWALE
FINISHED SURFACE CONTOUR
EXISTING SURFACE CONTOUR
——__ EXISTING ELECTRICAL RETICULATION
— — —T— — — _ EXISTING TELSTRA RETICULATION
— — —D— — — _ EXISTING STORMWATER DRAINAGE
— — —W— — — _ EXISTING WATER RETICULATION
— — —S— — — _ EXISTING SEWER RETICULATION
—X——X— _ PROPOSED SILT FENCE (INCLUDING 2.0m
WINGS AT 5.0m CENTRES)
ROCK DAM @ 30m CTS.
REFER DETAIL DRG ES02
ALL WORKS TO BE CARRIED OUT IN STRICT
ACCORDANCE WITH APPROVED SETTLERS
COVE NOOSA RESIDENTIAL HIGH DENSITY
ENVIRONMENTAL MANAGEMENT PLAN (EMP‘)
DATED 21 JULY 2005 BY WBM OCEANICS.
“ ALL BATTER GRADIENTS
ee TO BE CONFIRMED BY
Z GEOTECHNICAL
ee ENGINEER'S REPORT
PROPOSED SWALE TO DIVERT SURFACE —_
RUNOFF TO SEDIMENT BASIN '2'. REFER
DETAIL
TEMPORARY 6m WIDE
CONSTRUCTION ACCESS
HABITAT PROTECTION FENCE TO BE
ERECTED PRIOR TO COMMENCEMENT
OF CLEARING WORKS PROVIDE SIGNAGE.
‘AT 50m SPACINGS " ECOLOGICAL
RESTORATION AREA - NO ACCESS
0 4 8 12 16 20m
SCALE 1:200 A1, 1:400 A3
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION” AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION PURPOSES. Design: PBL PROJECT: DRAWING TITLE:
Checked
ENGINEERING : DESIGN : MANAGEMENT mail: [email protected]
Web; hitp:/www alta.net.au for CAPE BOUVARD DEVELOPMENTS
DIRECTOR APPROVAL Datum _AHD
Drawn. Brah 101 ply Itd Va Alta Projects EROSION AND SEDIMENT CONTROL PLAN
Date: wav ABN 91811354 511 see | PROPOSED RESIDENTIAL DEVELOPMENT STAGES 4A & 4B | stace ap
. Tal (07) 8475 4128 Fax (07) 6479 1607 | at SERENITY CLOSE, NOOSA DRAWING No: 96407/18/PESCO3 “ven | tot
© This plan is Copyright. Other than for the purposes of and subject to the conditions prescribed wander the
Copyright Act, no part of it may in any form or by any means (electronic, mechanical, micro copying, photo
copsing, recording or otherwise) be reproduced, stored in a retrieval system or transmitted without the prior
vliten permission of ALTA Projects, All intellectual property remains within ALTA Projects. al enquiries should
REV | DATE DESCRIPTION By | CHKD RPEQ- 4784 ‘1 SHEET SIZE FILENAME :26107-18-PESCO3 STG4B.dug - DATE : 221618 - 3:27am - XREF's:@6107-X-BASE; a6107-X-SURVEY; 36107-X-ARCH landscape; a6107-X-ARCH; H-Approved-SH:JE-Checked-SH Council Ref: Te digected to ALTA Projects, pep i: "
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
A6107 COMPLETE SET.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.