KERB & CHANNEL
EROSION & SEDIMENT CONTROL MANAGEMENT PLAN
Objective / Target
Comply with all statutory regulations and maintain the during earthworks
construction. Comply with the Major Erosion and Sediment Control Plan
by ALTA PROJECTS to control erosion and sediment flows.
Refer Best Practice Erosion and
Sediment Control Manual - Section
5 checklist
Management Strategy
Site foreman to identify and check direction of stormwater flows as
shown on plan. Provide barriers and other measures shown on plan and
within council guidelines to prevent stormwater flows over
embankments and minimise sediments into gully pits.
Utilise B.P.& S.C. Manual
Inspection Form Section 7
Task / Actions
Implement and maintain control measures identified on the Erosion and
Sediment Control Plans.
Utilise Section 7 - B.P.& S.C.
Manual checklist
Performance Indicators
Site foreman to check for erosion and sediment flows at the base of
embankments after rain. Check that all sediment fences and check
dams are working correctly during rain events.
Utilise Section 7 - B.P.& S.C.
Manual checklist
Frequency / Deadline
Inspection of all control structures shall be undertaken prior to expected
rainfall events and at least twice weekly. All minor structures such as
windrows, sediment fences etc, shall be inspected at the completion of
each day.
Refer drawing ESC01 for
frequency
Responsible Person /
The implementation of the Major Erosion and Sediment Control Plan is
Refer Erosion and Sediment
Organisation the responsibility of the Principal Contractor. Control Plan Section 6.0
Principal contractor to provide a monthly copy of record sheets .
Reporting / Review identifying test results for water quality testing. Site workman to advise Refer Erosion and Sediment
foreman if they notice any barrier needing repair.
Control Plan Section 6.0
Corrective Actions
Should inspection reveal deficiencies, the Contractor shall report issues
to Supervising Engineer.
NCR form to be utilised refer
Section 7 - B.P.& S.C. Manual
NOTE: A SAFE STORAGE LOCATION FOR FUELS AND OILS SHALL BE PROVIDED IN ACCORDANCE WITH AS1940 “THE STORAGE
AND HANDLING OF COMBUSTIBLE LIQUIDS”. THIS AREA SHALL BE BUNDED IN COMPLIANCE WITH THE STANDARD AND RELEVANT
REQUIREMENTS OF AUTHORITIES
TYPICAL LIP-IN-LINE
GULLY PIT
PROVIDE GEOTEXTILE
FABRIC WRAP OVER GRATE
SILT FENCE BY SEDIMENT FENCE ,__LENGTH AS REQUIRED
GEOFABRICS BY GEOFABRICS | 8 2
Pe
NSL NSL NSL.
200 MIN | 200 MIN
SECTION POSTS AT 3m CENTRES WITH WIRE J
MESH BACKING or 2m WITHOUT. ALL
POSTS DRIVEN 600mm INTO GROUND.
PERIMETER SILT FENCE
SCALE 1:50
SEDIMENT FENCES SHALL BE CONSTRUCTED WITH RETURNS AT
INTERVALS IN ACCORDANCE WITH "IECA BEST PRACTICE EROSION
CONTROL MANUAL" AND MAXIMUM 20m SPACINGS FOR FENCES.
ALONG CONTOURS AND 10m FOR ON-GRADE.
"BIDIM A34" BY GEOFABRICS OR APROVED
GRATED INLET
PIT IN ROADWAY
ELEVATION
EQUIVALENT. INSTALLED AS SHOWN
PLAN
ALLOTMENT PIT PROTECTION DETAIL
SCALE 1:20
Construction Site
=
ad
Geotextile fabric,
Bidum U34 or wea
Cattle grid 3.0m NOM width
set 300mm above ground
NOTE:
Contractor to provide a wash
down facilty in conjunction
with the proposed cattle grid.
W
1.5m 4.5m
3MAX =
BIDIM A14 GEOFABRIC
1 1
TYPICAL SWALE DETAIL
NTS
ENTIRE VERGE TO
BE TURFED
TURF VERGE DETAIL
SCALE: 1:50
ROCK CHECK DAMS SHALL BE LOCATED IN ALL CUT OFF DRAINS IN
ACCORDANCE WITH IEAC STANDARD DRAWING RCD -01
FORM U-SHAPED CREST TO
ENSURE OVER TOPPING AT
600mm , CENTRE OF DAM
150mm wn
_ 2
DIRECTION OF FLOW ! 0.3m-0.5m
150mm ROCK SPALLS EMBED 200mm
CRUSHED ROCK ee, GEOTEXTLE INTO GROUND
GEOTEXTILE TUBE
PROVIDE SAND FILLED 1008 ROCK CHECK DAM
SLOTTED AG DRAIN, CONSTRUCTION EXIT SCALE 1:50
WRAPPED IN GEOFABRIC, or OTT
4 APPROVED EQUIVALENT,
TO FRONT OF CHAMBER
INLET PIT PROTECTION DETAIL (IP)
SCALE 1:20
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION’ AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION PURPOSES. J Design: PBL PROJECT: EROSION AND SEDIMENT CONTROL DETAILS
Drawn:
Date: PROPOSED RESIDENTIAL DEVELOPMENT STAGES 4A & 4B
Checked
DIRECTOR APPROVAL
REV
DATE
DESCRIPTION
Datum _AHD
PAL Brah 101 pty Itd t/a Alta Projects
A.B.N. 91 611 354 511
MAY 2016 , 26 Memorial Avenue, Cotton Tree
{ PO Box 559, Cotton Tree, QLD, 4558
a Tel (07) 5475 4125 Fax (07) 5479 1607
ENGINEERING : DESIGN : MANAGEMENT Email: [email protected]
Web: hitp:/www.alta.net.au
at SERENITY CLOSE, NOOSA
for CAPE BOUVARD DEVELOPMENTS
sy | cHKD RPEQ- 4784
A‘ SHEET SIZE
FILENAME :96107-18-PESCO4 - DETAILS PLAN.Gug -DATE : 221/18-3:289m - XREF': HAosroved-SH; H-Chected SH
Council Ref:
DRAWING N Revision Sheet
Jo: '
A6107/18/PESC04 1 of
© This plan is Copyright. Other then for the purposes of end subject to fhe conditions prescribed under Ae
Copyright Act, ao part of it may in any form or by any means (electronic, anechanieal, mycro copying, photo
copsing, recording or otherwise) be reproduced, stored in a retrieval system or transmitted without the prior
wnitten permission of ALTA Projects. all intellectual property remains within ALTA Projects, all enquiries should
be directed to ALTA Projects.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
A6107 COMPLETE SET.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.