Decision Notice - Approved by Delegation of Authority MCU24/0069 & OPW24/0070 (AS PUBLISHED)
2405-40843 SRA
(a) Light’mark all vessels, structures, plant and equipment
associated with:
i. the works, in accordance with the following specifications:
A. any anchors deployed must be marked with
yellow buoys and fitted with FL yellow lights
ii. operations, in accordance with the following specifications:
A. any anchors deployed must be marked with
yellow buoys and fitted with FL yellow lights.
(b) Lighting provided must not obscure, disguise or otherwise interfere
with the safe navigation of other vessels, including the
effectiveness of navigational lighting.
For the duration of
works and for operation
to be maintained at all
times
The construction, operation and maintenance of pontoon and any
ship berthed, moored or attached to the structure, must not:
{a) encroach into, pass over or under a navigation corridor or
(b) be located in a high risk maritime zone or
(c) impede the safe navigation of other ships or boats or
(d) restrict safe access to or from neighbouring structures.
For the duration of
works, and at all times
9 Remove and dispose of any debris or similar obstruction encountered | For the duration of
whilst undertaking the work at an appropriately licensed facility. works
10. | All piles and/or structures to be demolished, both above and below the | Prior to the completion
waterline must be completely extracted/removed. of the works
‘State Assessment and Referral Agency Page 4 of 7
Document Set ID: 23098815
Version: 2, Version Date: 10/07/2024
Page 10 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority MCU24/0069 & OPW24/0070 (AS PUBLISHED)Related documentApplication case desk ↗
About this file
- File size
- 673 KB (small file)
- File type
No other editions are linked here.