Council archive · source document
Decision Notice - Approved by Delegation of Authority MCU24/0069 & OPW24/0070 (AS PUBLISHED)
2405-40843 SRA Attachment 1—Referral agency conditions (Under section 56(1)(b)(i) of the Planning Act 2076 the following conditions must be attached to any development approval relating to this application) (Copies of the documents referenced below are found at Attachment 5) No. | Conditions Condition timing Operational Works - Prescribed Tidal Works (pontoon and gangway) 10.17.3.1.1 — Operational work that is tidal works or work in a coastal management district— The chief executive administering the Planning Act 2016 nominates the Director-General of the Department of Environment, Science and Innovation to be the enforcement authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following conditions: 1. The pontoon must be carried out generally in accordance with the For the duration of following plans: works and to be (a) Layout Plan, date 28/06/2023, Drawing number TJS-04808-02, maintained Revision A (b) Elevation, date 28/06/2023, Drawing number TJS-04808-03, Revision A 2. The works to which this approval relates are to be for a private purpose | At all times only. 3. Any operator and contractor involved in the works to which this During construction approval relates must: (a) be provided a copy of these referral agency conditions (b) install all measures, plant and equipment necessary to ensure compliance with the conditions of this approval (c) maintain such measures, plant and equipment in a proper and efficient condition (4) operate such measures, plant and equipment in a proper and efficient manner. 4. For the pontoon works only use materials which are free from During construction contaminants as defined under section 11 of the Environmental Protection Act 1994. 5. Should the works become damaged as a result of erosion, flooding or | At all times storm tide inundation, the registered landowner(s) of the subject land shail be responsible for the removal of all debris at their own expense. Operational Works - Prescribed Tidal Works (pontoon and gangway) 10.17.3.2.1 — Operational work that is tidal works or work in a coastal management district in tidal waters (maritime safety) — The chief executive administering the Planning Act 2016 nominates the Director- General of the Department of Transport and Main Roads to be the enforcement authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following conditions: 6. The development must be carried out generally in accordance with the | At all times following plans: (a) Layout Plan, date 28/06/2023, Drawing number TJS-04808-02, Revision A (b) Elevation, date 28/06/2023, Drawing number TJS-04808-03, Revision A State Assessment and Referral Agency Page 3 of 7 Document Set ID: 23098815 Page 9 of 15 Version: 2, Version Date: 10/07/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority MCU24/0069 & OPW24/0070 (AS PUBLISHED)Related documentApplication case desk ↗
About this file
- File size
- 673 KB (small file)
- File type
No other editions are linked here.