Decision Notice - Approved by Delegation of Authority MCU24/0069 & OPW24/0070 (AS PUBLISHED)

of 15

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

2405-40843 SRA

Attachment 1—Referral agency conditions

(Under section 56(1)(b)(i) of the Planning Act 2076 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)

 

 

No. | Conditions Condition timing
Operational Works - Prescribed Tidal Works (pontoon and gangway)

10.17.3.1.1 — Operational work that is tidal works or work in a coastal management district— The chief
executive administering the Planning Act 2016 nominates the Director-General of the Department of
Environment, Science and Innovation to be the enforcement authority for the development to which this
development approval relates for the administration and enforcement of any matter relating to the
following conditions:

 

 

 

 

 

1. The pontoon must be carried out generally in accordance with the For the duration of
following plans: works and to be
(a) Layout Plan, date 28/06/2023, Drawing number TJS-04808-02, maintained
Revision A
(b) Elevation, date 28/06/2023, Drawing number TJS-04808-03,
Revision A
2. The works to which this approval relates are to be for a private purpose | At all times
only.
3. Any operator and contractor involved in the works to which this During construction
approval relates must:

(a) be provided a copy of these referral agency conditions

(b) install all measures, plant and equipment necessary to ensure
compliance with the conditions of this approval

(c) maintain such measures, plant and equipment in a proper and
efficient condition

(4) operate such measures, plant and equipment in a proper and
efficient manner.

4. For the pontoon works only use materials which are free from During construction
contaminants as defined under section 11 of the Environmental
Protection Act 1994.

5. Should the works become damaged as a result of erosion, flooding or | At all times
storm tide inundation, the registered landowner(s) of the subject land
shail be responsible for the removal of all debris at their own expense.

Operational Works - Prescribed Tidal Works (pontoon and gangway)

10.17.3.2.1 — Operational work that is tidal works or work in a coastal management district in tidal waters

(maritime safety) — The chief executive administering the Planning Act 2016 nominates the Director-

General of the Department of Transport and Main Roads to be the enforcement authority for the

development to which this development approval relates for the administration and enforcement of any

matter relating to the following conditions:

6. The development must be carried out generally in accordance with the | At all times

following plans:

(a) Layout Plan, date 28/06/2023, Drawing number TJS-04808-02,
Revision A

(b) Elevation, date 28/06/2023, Drawing number TJS-04808-03,
Revision A

 

 

 

 

 

 

 

 

 

 

 

 

State Assessment and Referral Agency Page 3 of 7

 

 

Document Set ID: 23098815 Page 9 of 15

Version: 2, Version Date: 10/07/2024

Used in these records

About this file

File size
673 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Approved by Delegation of Authority MCU24_0069 & OPW24_0070 (AS PUBLISHED).pdf · 673 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.