REPS M2915 - Negotiated Decision Representations_200522
.
Comment
To avoid delays at plan sealing, we seek confirmation that the amendments to the stormwater management system
required by this condition achieve a lawful point of discharge to Council’s satisfaction.
Condition 46
46. Amended plans and associated reports must be submitted to Council prior to any further development applications
being made and must include the following to the reasonable satisfaction of the Manager, Development Assessment:
a. A revised Landscaping Plan relative to plan numbered, 1622_L01-01_03 & 1622_L03- 01_03, is to be provided for
approval detailing:
i. The existing vegetation between the proposed fence along the road boundary
of Lot 22 P9315 and the kerbside must be assessed by a qualified person* and retained, and protected where
possible.
ii. Where mature trees are to be removed, reasonable grounds must be given by
the qualified person*, and substituted with additional Baeckea virgata or Banksia integrifolia with a minimum pot
size of 100L or greater.
Comment
In light of the Arborist assessment (Refer to Appendix E) and updated landscape plan (Refer to Appendix D) it is
considered that we have addressed Condition 46. As such, we request that Council approve the Arborist report and
amended landscape plans, and delete Condition 46, which is no longer relevant.
46. Amended plans and associated reports must be submitted to Council prior to any further
development applications being made and must include the following to the reasonable
satisfaction of the Manager, Development Assessment:
a. A revised Landscaping Plan relative to plan numbered, 1622_L01-01_03 & 1622_L03- 01_03, is to be
provided for approval detailing:
i. The existing vegetation between the proposed fence along the road boundary
of Lot 22 P9315 and the kerbside must be assessed by a qualified person* and retained, and protected
where possible.
ii. Where mature trees are to be removed, reasonable grounds must be given by
the qualified person*, and substituted with additional Baeckea virgata or Banksia integrifolia with a
minimum pot size of 100L or greater.Deleted
Condition 47 – Currency Period
47. The Currency Period for this development approval lapses if the development has not substantially started by 29 March
2028, unless an application to extend the currency period is approved by Council.
Comment
The currency period for the Operational work aspects of the development aligns with the default period under the
Planning Act 2017 and is not a sunset clause for a staged development. As such, it should be included in Section 3 of the
Decision Notice, not as a Condition of approval. Please delete the Condition.
47. The Currency Period for this development approval lapses if the development has not substantially started by
29 March 2028, unless an application to extend the currency period is approved by Council. Deleted (refer to
Section 3)
JFP Ref: M2915 Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.