Council archive · source document
07/2184 - Preliminary Building Work Assessable Against the Planning Scheme [As Published] · 172007.2184
INTEGRATED PLANNING ACT 1997 . , Part A, Version 2.4, 29 May 2006
aN SAE Coocne selection
mon details ©
a.
an?
Qh get ?
E.COUREKL
oss USE
Ox hued
i Any in al
fetion of all eouleabiegutstions on Part A Is mandatory for all appfications. Part A must be accompanied by the completed 1DAS Assessment Checklist if
nd ange other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.qid.gov.au.
may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1,
‘Description ofland 1, Street address: (notudinghouse number, street name, suburbvlocafily name & postcode) (if applicable)
All land tha of the application, must be =
{identified ‘anc rece tenors lard not lus 4a mates Leif LALA ia Pag 4-373 ]
:Evonmentay Rava fey (ERA) 2. a of water body or watercourse, within which the development is proposed: (if applicable) :
Advice for completing Q2 - 02 applies if .
development is proposed within a water body or
watecourse, 3. Lot on plan description (eg. Lot 123 on RP 4567) / GPS coordinates:
Advice for completing Q3 - Most land can be
@ srsosiiees |, er be Hest.us |
Ho paesenlil menisrthough ite 14 The above description is for: (ck appfcabia box) ‘
Howaver, ifthe land on which the development is ((i) the land on which the development is proposed; or
Hissaen toe taaeee nn aalbarest ell Ci) the land adjoining the water body or watercourse, within which the development is
watercourse} provide —° Proposed; or .
On ae Seveison othe LO (ili) the water body or watercourse.
® botany ‘on Mnton Bay. 5. r / tenancy — 6. ro / level: 1 7. C area of land: (m? “
Advice for completing Q7 - Q7 does pot apply if the
development is within a water body or watercourse. -
Sree er comtei Be pore eit res 8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc.) if applicable)
Note: Areas below high water mark within :
, focal governments klaidcline 5 under the | Me eck} |
Local Government Act 1993. ‘ 9. Port authority for the strategic port land or strategic port land tidal area on which the
Advice for completing Q9 - Q9 applies if i 1. fe P ,
Praia otto a erategi development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
port land tidal area. For more details refer to Guide 11 [| |
‘Proposal details 10. Existing use of the land: (eg. vacant, single house, shop etc.)
pniiticiamemmmeamer | [Sgn seoee , |
in ment apy
@ 11. Proposed use of the land: (eg. 6 unit apartment building, 30 lot residential subdivision, ERA for aquaculture in
‘ ponds with a total area of 7 ha for which wastes are released into waters etc).
: Other applicable parts of Form 1 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part I, etc)
(Part A must ghways be accompanied by other | SPCR cD |
completed parts of Form 1, For information about Zz
jon a pat of Farm {may api eer Gui
“Applicant details 13. Applicant's name: 15, Contact person:
who is making the application, The ==
| pploan ned pate he onne olan. [Hon Geo | lan meson |
| When slaning and lodging this application 14. Contact number: 16. Facsimile number/e-mail address:
fomaton roel scorer The asesarent loa 7 632 BZA ] [ |
referral & the Chief Executive 5
ft sinha ah oyel tern 17. Postal address, D4! SoS
es an cg be pein. eam [46 Sox €S5 Been 4-573 _]
rmust be shown. 18. Signature: 47,” _Z” 19. Date:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 37 pages
Page 2
INTEGRATED PLANNING ACT 1997
- Land owner's consent (f applicable)
| ection 3.2.1(3) ofthe IPA prescribes that an
{ @pplication must contain, or be supported by, the
y writen consent of the land owners, if the application
+ involves:
2{) a material change of use;
°@)_ reconfiguration of a bot;
{F) work on land below high-water mark & not within a
canal as defined under the Coastal Protection and
Management Act 1995;0r
rc) ‘work on rail corridor land defined under the
1” Transport infrastructure Act 1994.
Section 3.8.1{2)(a) of the IPA provides that
; landowner's consent ls not required for a mobile or
, bemporary ERA .
‘ For more information refer to Guide 1,
Part A, Version 2.4, 29 May 2006
20. Land owner's consent to the making of this application: a
Name . ignature Date
” Deer. Mbt . Mom: vesececeneeee Lysto:04
i
"Resource entitlement (f applicable)
. Section 3.2,1(5) of the IPA requires evidence of
* resource entitlement be given for applications that
involve a prescribed State resource.
+ Section 3.2.1(10)(a)(i) of the IPA prescribes that an
garnet be taken to be properly made
* without evidence of the resource entitlement.
1 & 22
Refer to schadute 10 of the integrated Planning
Regutation 1998 that prescribes the nature of evidence
required by the State in support of the fodging of this
development application.
Advice for completing 023
The information in (i) - (v) is mandatory if evidence is
required under Q22 (il) or {i) above,
"The official stamp of the Department of Natural
Resources, Mines and Water is mandatory where the
application involves any water or riverine quarry
material under the Water Act 2000.
Section 3,2.1(5A) allows the resource manager to limit
the time the evidence may be used. Q23 (vi) must be
21. Does this application involve a State resource prescribed under a regulation (other than involving
quarry material on State coastal land under the Coastal Protection and Management Act 1995)?
LINO - goto 024 (2 YES - goto a2
22. This application is accompanied by evidence: (tick appticable box)
C1 (i) of the allocation of, or entitlement to, the resource - attach evidence and go to 023(v)
CD (ii) ‘the chief executive of the department administering the resource is satisfied the
development is consistent with an allocation of, or entitlement to, the resource - go
to Q23
(CA (iii) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or @
entitlement to, the resource - go to Q23
23. Evidence of the resource entitlement:
() Resource entitlement / authority details (vil) Official stamp of the department
administering the resource (if
applicable)
(ii) Name of “ere officer
tod ft the evldenoe is tine tinted, (iii) Position of — officer
(iv) Signature of delegated officer
(vy) Date
(vi) pen date of evidence a
Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application? : ©
! This checklist does pot apply Hf the application requires C1 Yes : (INO - the assessment manager may refuse to accept this application on the
the completion of Parts A and B of the Form only. It :
“esto oompltd fr al oer eppicaions grounds that the application has not been properly made ; .
“Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:
| Sapnent tn proposal & scab he aonerent Plan / Drawing / Report Number Title Date
+ Manager, referral agencies and any person viewing a
* the application during public scrutiny or public (i)
- Notification to understand the scope ofthe proposal ff reno r reeset een r er errecceeseccndecsnccccccesccccceecencnnceee cnn taweseamece ere
_ and any potential impact. (ii)
(iii)
(iv)
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager's)
[rem OS | pepenen
lrefie for [ee 7) L mens. | 7 /Z, ie |
To.
Notification of Engagement of Private Certifier ‘ontonettomal?”
Date ofengagement / / Accreditation Number. ___ Name: Signature:
Council, | have been engaged as the private certifier for the building work referred to in this application.
Page 3
INTEGRATED PLANNING ACT 1997
Part E, Version 2.1, 18 June 2007
Form 1 Development Application
Operational &/or building work
assessable against a local government’s planning scheme
t=
@2
<=
Qt
Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work assessable
against a local government's planning scheme (including detailed engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual
design plans for engineering & buikding work when the application does not involve assessment of a material change of use of premises at the same time).
Nature of the works 1. The application is seeking approval of (tick one (1) or both if applicable):
The types of work that are assessable against, Building work assessable against a planning scheme - provide details of the aspects of building
a planning scheme are determined by the work (e.9. building height greater than 8.5m; building work on high landslip risk area)
* scheme for a particular focal goverment and
will vary across the State. | ‘ : |
To determine the types of work that are (2 Operational work assessable against a planning scheme - provide details of the nature of the
assessable under a particular planning operational work (e.g. roadworks; landscaping; drainage works: stormwater; water infrastructure; sewerage
scheme, contact the relevant local infrastructure; earthworks; clearing vegetation; signage)
govemment. =
The information in Q2 is necessary for [
statistical and planning purposes. 2. _ Is the application for operational work involving the creation of new lots?
CINo (YES - specify number of new lots to be created below
3, Does the proposal involve the construction of a canal that is associated with reconfiguring a lot?
LI No OYes .
Nature of the application 4. This application is for: (tick one (1) or both if applicable)
A development permit authorises Preliminary approval - provide details of the type of work eg. roadwork, stormwater, water and sewerage
development to occur, while a preliminary infrastructure, etc *
approval is a step in the approval process -
and does not authorise development to occur. | Atic- athiew a anelchrnrrn he heowre.
O Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure, etc
5. Are the works subsequent to a previous development permit or preliminary approval?
J No (1 YES - provide details of all previous approvals
List of approval reference/s Date approved Date approval lapses
/ / / {
Portable Long Service Leave levy (if |6. ls payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
applicable) . | (1 YES - complete a7
Prior to issuing a development permit for the
works, the assessment manager is required O NO - Q7, 8&9 do not apply
by law to “sight” an approved form, issued by .
Qleave, which signifies that the PLSLlevy |7. Has the PLSL levy been paid?
has been paid. . (YES - compiete 08
For further information refer to
http Awww. gleave.qld.gov.au Oo NO - the applicable levy must be paid before a development permit can be given for the works
8. How much was paid?
9. Whatis the receipt number of the payment?
| _]
Page 4
INTEGRATED PLANNING ACT 1997 Part E, Version 2.1, 18 June 2007 PLEASE NOTE This application cannot be accepted unless accompanied by Part A of Form 1. The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information requested by Part A and any other relevant part of Form 1. OFFICE USE ONLY (applicable fo assessment manager} REFERENCE DATE RECEIVED NUMBERIS (i) Is a PLS levy applicable in this instance? (No [YES - complete afi) (ii) Has the approved form (issued by QLeave and which signifies that the PLSL levy has been paid) been sighted by the assessment tnanager / private certifier at the time of lodgement of this application? CINo (11 YES - provide receipt detaits
Page 5
ws
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
} AN Form 1 Development Application
IDAS Assessment
— Checklist
(Formerly the “Referrals Checklist”)
IMPORTANT NOTE FOR ALL APPLICANTS:
1.
10.
11.
This checklist was formerly referred to as the “Referrals Checklist”. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function. :
Under the IPA and IDAS framework, an application may require assessment by the local Councit and/or certain Queenstand State entities (e.g. Environmental Protection
Agency, Dept of Natural Resources and Water, Queensland Heritage Councit etc.).
This checklist is provided to assist applicants to determine when an application fequires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager for the application.
Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
{tis the responsibility of the applicant to accurately complete this checklist.
Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.
Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.
‘The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination”.
To assist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qid.gov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.
Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www, ipa.qid.gov.au.
Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.
os
reo an ome eS ° :
Note: ‘The following state assessment triggers apply.to development other than for building work assessable against the Building Regulation 2006,. .
SECTION 1 - STATE ASSESSMENT (completion mandatory)" ”
Environmentally relevant activity 1. The application involves: (tick applicable box/es)
For more information refer to Guide 4. C1 (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
nivess you answered "none ofthe ove f01, has not been made - complete Part G of Form 1
!e application requires assessment by the Ss ~~ - . .
administering authority’, C1 (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
Itan entity, other than the administering Made - complete Part G of Form 1
authority, is the assessment manager for the Pi) none of the above
application, the administering authority is a
Concurrence agency for the application in relation
to this matter.
Note: An application involving ERA 19 and/or 20
wil also require completion of Part K; of Form t
for approval where an allocation under the Water!
Act 2000 is required.
Continued overieaf
PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).
| “DATE RECEIVED REFERENCE NUMBERIS
OFFICE USE ONLY (applicable to assessment manager)
1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.
2 For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?”
3 Tha ‘administering authority’ may be either the Environmental Protection Agency, the relevant local government (for a devolved ERA) or the Queensland Department of Primary Industries and
Fisheries (for a delegated ERA).
Page 1
Page 6
INTEGRATED PLANNING ACT 1997
State-controlled road matters
For more information refer to Guide 3.
Unless you answered “none of the above" to Q2,
the appkcation tiggers referral to the Department
of Main Roads (DMR) as a referral agency.
In certain circumstances DMR will be an advice
agency, while in other cxcumstances DMR will
be a concurrence agency.
Schedule 2 of the JP Regulation will assist you to
determine where DMR is an advice or
concurrence agency for the application.
2.
IDAS Assessment Checklist, Version 20, 2 Apri 2007
The application involves: (tick applicable box/es)
[J development on land contiguous" to a State controlled road and for -
CL (a) material change of use assessable against the planning scheme;
(CO (b) reconfiguring a fot unless -
the total number of lots is not increased; and
e the total number of lots abutting the State-controlled road is not increased;
(J (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above}-
* associated with access to a State-controlled road; or
« for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road. ,
U0 (i) development on land not contiguous to a State-controlled road and -
D(a) material change of use —
+ assessable against the local government's pianning scheme: and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
(J (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP P regulation
"and exceeding the thresholds set by that schedule;
(J (c) operational work (not associated with a material change of use assessable against
planning scheme or reconfiguring a lot mentioned in (b) above)-
« assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
[1 (iii) none of the above
Clearing vegetation
For more information refer to Guide 12.
Unless you answered “none of the above” to Q3,
the application requires assessment by the
Department of Natural Resources and Water
(NRW).
If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in retation
to this matter.
H you ticked Q3(i) or (ii), your application requires
feferral to NRW for assessment regardless of
whether vegetation clearing is proposed or not.
The application-involves: (tick applicable box/es}
C1) material change of use -
(a) assessable against the planning scheme;
{b) on alot containing -
« acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
« if there is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
reconfiguring a lot —
(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) - where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and .
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 4
operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form?
[iv) none of the above.
O tii
Diy
Strategic port land
For more information refer to Guide 11.
i you ticked (i) - the relevant Port Authority is the
assessment manager for the application.
If you ticked (i) Queensland Transport is a
concurrence agency for lhe application.
The application involves:
(1 {i) development on strategic port land as defined in the Transport infrastructure Act 1994 (Tl
Act) - complete Part ! of Form 1
C1 (ii) a material change of use that is inconsistent with the land use plan approved under the
Ti Act for the strategic port land - complete Part | of Form 1
[A (iii) none of the above
4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of | the State-controlled road; or that is part of a future State-
convolled road.
Page 2
Page 7
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
Acid sulfate soils 5. The application involves development on land situated in an identifieds local government area
For more information refer to Guide 10. and where the surface of the land is: (tick applicable box)
Unless you answered "none of the above" to 5, [J (i) below 20m AHDS and the development will involve the excavation of 1000m3 or more of
the application requires assessment by it edi t bel
Department of Natural Resources and Water Soil or sediment at or below Sm AHD, or
(NRW). O Gil) ator below 5m AHD and the development will involve filling the site with 100m? or more
if an agency other than NRW Is the assessment of materia!
Manager for the application, NRW is an advice 7
agency for the application in relation to this LA iii) none of the above
matter.
Major hazard facilities or possible 6. Does the application involve a material change of use for a major hazard facility or possible
major hazard facilities major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
For more information refer to Guide 17. [no
If you answered “YES” to Q6, the application
requires assessment by the Department of [1 YES - complete Part L of Form 1
Emergency Services (DES).
If an agency other than DES is the assessment
manager for the appiication, DES is a
concurrence agency for the application in
relation to this matter. .
Water related development under the }7, The application involves:
Water Act 2000
For more information about items (a) - (f), refer
to Guide 15. For more information about item
(9), refer to Guide 14 Does my application
invove assessment of a referable dam?
Unless you answered “none of the above" to Q7,
the application requires assessment by the
Deparment of Natural Resources and Water
(NRW),
if an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.
C1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
Ki
(tick applicable box/es)
(1) (a) in a watercourse, lake or spring, (eg. a pump, gravity diversion, stream re-direction, weir or
dam) - complete Part Kz, Ks, Ks, Ks, or Ka of Form 1 whichever is applicable;
Ks of Form 1;
for an artesian bore anywhere in the State, no matter what the use - complete Part
for a subartesian bore, in declared subartesian area’, or in a certain area covered
by a water resource plan, for use for purposes other than stock and/or domestic
use - complete Part K; of Form 7;
Ol)
for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part K; of Form 1;
Oe)
Da
OG)
— complete Part Ke of Form 1;
complete Part K:oof Form 1
for taking overland flow water in certain areas covered by a water resource plan
for interfering with overland flow water in a drainage and embankment area -
for constructing a referable dam? or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; or
none of the above.
Removal of quarry material from a 8.
watercourse
For more information refer to Guide 16.
If you answered “YES” to Q8, the application
requires assessment by the Department of
Natural Resources and Water (NRW).
{fan agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.
Note: Part G of Form 1 is required to be
completed as the activity of removing quarry
material from a watercourse is also an
Environmentally Relevant Activity (ERA).
Does the application involve development for the removal of quarry material from’ a watercourse?
requiring an allocation notice under the Water Act 2000?
[tno
(1 YES - complete Parts Kr and G of Form 1
5 The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.
Austrian Height Datum {AHD).
Referable dam is defined under the Water Act 2000.
Watercourse is defined in sch 10 of the IPA.
COND
The declared ground water areas are listed in Guide 13 Development i
» page 3
Page 8
INTEGRATED PLANNING ACT 1997 Operational work that is tidal work or work in coastal management district For more information refer to Guide 8. For more information about prescribed tidal work in local goverment tidal areas refer to Guide 24. Unless you answered “none of the above” to Q9, the application requires assessment by the Environmental Protection Agency (EPA). If an agency other than EPA is the assessment manager for the application, EPA is a concurrence agency for the application in felation to this matter. Local government is the assessment manager for alt prescribed tidal work. . IDAS Assessment Checklist, Version 20, 2 April 2007 9. The application involves operational work that is: ( tick the applicable box/es) CJ (i) _ tidal work" as defined under the Coastal Protection and Management Act 1995 (the Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; OF LJ (ji) tidal work that is prescribed tidal work"' other than in a canal’? -complete Part P of Form 1; oF (1 (iii) carried out within a coastal management district under the Coastal Act and for - complete Part M of Form 1 if any box/es (a) to (j) below are ticked. (1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie. other than those works in tidal water} where the development has been determined not to be assessable against the Water Act 2000 ; constructing a canal12 intended to be connected to tidal waters; constructing an artificial waterway; ‘ reclaiming land under tidal water; disposing of dredge spoil or other solid waste material in tidal water; interfering with quarry material on State coastal land above high-water mark; draining or allowing drainage or flow of water or other matter across State coastal land above high-water mark; (J (h)_ removing or interfering with coastal dunes on land, other than State coastal land, that is in an erosion prone area and above high-water mark; C1 (i). constructing a bank or bund wall to establish a ponded pasture on land, other than State coastal land, above high-water mark; or [Aiv) none of the above. Ob) Dic) C1) Oe) Of Ol) Operational work below high water mark . For more information refer to Guide 18, For mare information about prescribed tidal work in local government tidal areas refer to Guide 24. Unless you answered “none of the above” to Q10, the application triggers referral to Queensland Transport (QT) (Maritime Safety Qld) as a concurrence agency. Local government is the assessment manager for all prescribed tidal work, 10. The application involves operational work that is: ( tick the applicable box/es) C (() -tidal work! as defined under the Coastal Protection and Management Act 1995 (the Coastal Act) that is not prescribed tidal work ~ complete Part M of Form 1; or LD (ii) tidal work that is prescribed tidal work"4 - complete Part P of Form 1; oF (71 (ili) carried out within-a coastal management district! under the Coastal Act and for - (1 (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part M of Form 1; (1 (b) reclaiming land under tidal water - complete Part M of Form 1; or [1 (c) constructing a canal12, if the canal is associated with reconfiguring a lot - complete Part M of Form 1, [ATv) none of the above. Coastal management For more information refer to Guide 18. Unless you answered “none of the above” to Q11, the application requires assessment by the Environmental Protection Agency (EPA). If an agency other than EPA is the assessment manager for the application, EPA is a concurrence agency for the application in relation to this matter. 11. The application involves: (tick the applicable box/es) CJ (i) a material change of use assessable under a planning scheme involving operational work carried out completely or partly in a coastal management district" Di iii) a material change of use assessable under a planning scheme involving building work, carried out completely or partly in a coastal management district that is — « the construction of a new premises with a GFA'S of at least 1000m? « the enlargement of the GFA of existing premises by more than 1000m? reconfiguring a fot assessable under schedule 8 of the !PA where the land is situated completely or partly in a coastal management district reconfiguring a lot’ assessable under schedule 8 of the IPA and in connection with the construction of a canal12 - complete Part M of Form 1 none of the above Oy Ow) (4) 10 Tidal work is defined in sch 10 of the IPA. 11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a locat government tidal area. 12 Canal means canal as defined under the Coastal Protection and Management Act 1995 13 Tidat work is defined in sch 10 of the IPA. 14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area. 15 Coastal management district is defined in sch 10 of the (PA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a coastal management district under section 47(2) of that Act. 16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed. 17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must ba accompanied by the application for the operational works to construct the artificial waterway. Page 4
Page 9
“ INTEGRATED PLANNING ACT 1997 Development within the limits of a port For more information refer to Guide 18. For information ahout prescribed tidal work refer to Guide 24. you answered "YES’ to Qt2, the application triggers referral to the Port Authority. The Port Authority is a cancurrence agency if the development is — . * within 200m of a shipping channel or an entry and exit shipping corridor for the port © within 1000m of a swing basin, a commercial shipping wharf, a mooring, anchorage or spoil grounds; - . * within 1000m of a planned port facifity identified in a land use plan approved under the Transport Infrastructure Act 1994. in all other situation the Port Authority is an advice agency. IDAS Assessment Checklist, Version 20, 2 April 2007 12. Does the application involve development below high water mark’ and within the limits of a port under the Transport Infrastructure Act 1994? Gro Dl yes- complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work Service as an advice agency. Marinas For more information refer to Guide 18, For information about whether a marina is prescribed tidal work refer to Guide 24. The local govemment is the assessment manager for all prescribed tidal wark, if you answered "YES" to Q13, the application triggers referral to Queensland Fire and Rescue Tidal works in strategic post tand‘tidal areas . For more information refer to Guide 18. Unless you answered “NO” to Q14, the relevant Port Authority is the assessment manager for the application and the Environmental Protection Agency (EPA) and Queensland Transport (QT) are concurrence agencies for the application. Heritage For further information refer. to Guide 19. Ifyou answered “YES” to Q15, the application triggers referral to the Queensland Heritage Council as concurrence agency for the application. Unless you answered “none of the above” to Q15(b), the application involves referral to the Environmental Protection Agency as an advice agency for the application 13. Does the application involve operational work that is tidal work for a marina’ with more than 6 vessel berths? [NO LI YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work 14. Does the application involve tidal works within a strategic port land tidal area20? [ENO , (11 YES - complete Part M of Form 1 15. Does the application involve development in a heritage registered place as defined under the Queensland Heritage Act 1992? Zane) (71 YES - complete Part C of Form 1 15(b) The application involves: (tick applicable boxes) LJ (i) a material change of use assessable against the planning scheme and the lot shares a common boundary with a protected area or registered place under the Queensland Heritage Act 1992; reconfiguring a lot if the lot shares a common boundary with a protected area or registered place under the Queensland Heritage Act 1992; none of the above. iii) mii Declared catchment areas For more information, including a list of the declared catchment areas within Queensland, tefer to Guide 13. Untess you answered “none of the above” to Q16, the application requires assessment by the Department of Natural Resources and Water (NRW). if an agency other than NRW is the assessment Manager for the application, NRW is a concurrence agency for the application in relation to this matter. 16. The application is in an area declared to be a catchment area under the Water Act 2000 and involves: (tick the applicable box/es) DQ) reconfiguring a tot if any lot resulting from the reconfiguration is less than 16 hectares; Ci (i) development assessable against the planning scheme involving the establishment or expansion of a waste water disposal system, other than a disposal system for carrying out an environmentally relevant activity under the Environmental Protection Act 1994: Aili) none of the above 18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide. 19 Marina is defined in the Transport Operations (Maritime Poltution) Regulation 1995. 20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land. Page 5
Page 10
INTEGRATED PLANNING ACT 1997
Contaminated land
Applications involving material change of use
and or reconfiguring a lot may trigger this
referral.
For more information refer to Guide 5.
Unless you answered “none of the above” to
Q17, the application requires assessment by the
Environmental Protection Agency (EPA). If an
agency other than EPA is the assessment
manager for the application, EPA will be a
concurrence agency for the application in
relation to this matter.
17.
IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves: (tick the applicable box/es)
(Q (i) reconfiguring a fot for which all of part of the premises are —
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
« item 5, including the exemption otherwise provided for by paragraph (d);
« item 6, including the exemption otherwise provided for by paragraph (e); or
« item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
(b) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
CI (ii) a material change of use -
{a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
{b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
[eMiii) none of the above
Electricity infrastructure
For more information refer to schedule 2of the IP
Regulation.
Unless you answered “none of the above” to
Q18, the application triggers referral to the
agency to which the easementis granted i in
fayout of as advice agency.
18.
The application involves: (tick the eppiicable boxes)
(() reconfiguring a fot where any part of the lot is —
* subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or
« Situated within 100m of a substation site;
a material change of use, assessable against a planning scheme and not associate MD
with reconfiguring a lot if -
« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and
any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if-
« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
the work is located wholly or parily within 10m of a substation site;
[-¥(v) none of the above.
Oi)
O iii
OW)
Land designated for community
infrastructure
Applications involving development on fand
designated for community infrastructure may
tigger this referral.
For more information refer to schedule 2 of the
(P Regulation.
if you answered “YES" to 019, the application
fequires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose.
If an agency other than the designator is the «
assessmerit manager for the application, the
designating agency will be a concumence
agency for the application in retation to this
matter.
designated for community infrastructure?
{i} intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development -
{a) for the designated purpose; or
(b} carried out by, or on behalf of, the designator.
[-1No
(Yes
Does the application involve development assessable against the planning scheme and on land @
Page 6
Page 11
INTEGRATED PLANNING ACT 1997
SEQ Regional Plan
For more information refer to schedule 2 of the
IP Requiation.
Refer to Chapter 2, part 5A and schedule 10 of
the Integrated Ptanning Act 1997, and schedule
2 of the Regulatory Provisions for relevant
definitions.
Unless you answered “none of the above" to
20, the application requires assessment by the
Office of Urban Management (OUM).
IDAS Assessment Checklist, Version 20, 2 April 2007
20. The application involves (tick applicable boxes) -
0 @ a-material change of use of premises —
, (a) in a Major Development Area in the Urban Footprint for -
0 @) an urban activity -
C1 in an area included in a structure plan where the IPA, section 3.1.6
applies;
(1 inan area not included in a structure plan where -
« the IPA, section 3.1.6 applies to the application for the material change
of use; or
« the premises exceeds 10,000m2; or
+ the gross floor area (GFA) on the premises will exceed 10,000m2; or
+ impact assessment is required under the relevant planning scheme
C1 (ii) intensive animal husbandry, or
[2 (ii) residential development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Area for -
O) (i) anurban activity and not specified im section 2.4(2); or
OU (ii) residential development involving a rural residential purpose and not
: specified in section 2.6(2}
{c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
(d) in the Investigation Area for -
1 (an urban activity and not specified in section 2. 10(2);
OO (i) residential development involving a rural residential purpose and not
specified in section 2.12(2); or .
C (ili) intensive animal husbandry
C1 (ii) reconfiguring a fot-
On land in a Major Developnient Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).
[1 (iii) none of the above
Fisheries matters
For more information refer to schedule 2ot of the IP
Regulation.
Unless you answered “none of the above” to
Q21, the application requires assessment by the
Department of Primary Industries and Fisheries
{DPIF).
If an agency other than OPI8F is the assessment
manager for the application, DPI8F is a
concurrence agency for the application in
elation to items {i) — {iv) and an advicé agency
in relation to item (v).
21. The application involves: (tick the applicable box/es)
CI) anassessable material change of use for aquaculture - complete Part O; of Form 1;
Li (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 1;
Li (iii) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1;
LC (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
(J (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;
Ef (vi) none of the above.
Page7
Page 12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Integration of land use and public 22. The application involves: (tick the applicable box/es)—
transport . . . .
For more information refer to Guide 23, schedule LD (i) a material change of use assessable against the planning scheme for a purpose
8A of the IPA, & schedule 2 of the IP Requiation. mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
Unless you answered “none of the above’, the schedule.
application triggers referral to OT as a 7 .
concurrence agency. D1 (ii) reconfiguring a tot—
L1 (a) _ onland that is completely or partly within a @ public transport corridor, and the
total number of lots increases;
[1 (b) _ ontand that is completely or partly within a future public transport corridor or
an airport's public safety area;
[1 (©). on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m2 or greater;
LJ (a) . for a residential purpose within the 25 ANEF contour for an airport;
(1 (e) fora residential purpose resulting in 100 or more allotments.
(iti) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—
[1 (a) _ is completely or partly within a public transport corridor or a future public
transport corridor;
[ (b) will result in work that encroaches into an airport's operational airspace.
[4 (iv) none of the above. e ,
Railway safety and efficiency 23. The application involves: (tick the applicable box/es)—
For more information refer to Guide 23, schedute (1 (i) a material change of use assessable against the planning scheme for a purpose
8A of the IPA & schedule 2 of the IP Regulation.
BA of the IPA 8 schedule 2 of the mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
Unless you answered “none of the above”, the
application triggers referral to QT as a schedule.
concurrence agency. CO (ii) reconfiguring a lot—
(1 (a) ontand that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
[J (b) on tand that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;
(1c) __ on tand that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
(1d) __ ontand that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
(J (e) on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
OO(f) for aresidential purpose resulting in 100 or more allotments.
C (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a tot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m3, on land that—
(1 (a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
(1 (b) is completely or partly within future railway land, or a railway tunnel easement;
(©) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
{1 (iv) none of the above.
Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to
For more information refer to schedule 2of the IP Brisbane strategic pipeline, and involves: (tick the applicable box/es)—
Requtation.
Unless you answered “none of the above’, the
application triggers referral to the halder of
LA (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
pipeline licence No 1 issued under the Petroleum easement.
Act 1923, currently Santos QNT Pty Ltd, for ii) reconfiguring a lot
advice. LI (i) 9 g
(1(iti) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
iv) none of the above,
Page 8
Page 13
INTEGRATED PLANNING ACT 1997 Koata habitat area For more information, refer to Guide 26 and schedule 2 of the IP Regulation. Untess you answered “none of the above’, the appfication requires referral to the Environmental Protection Agency as a concurrence agency. : IDAS Assessment Checklist, Version 20, 2 April 2007 25. The application involves: (tick the applicable box/es}— (i) a material change of use of premises in a koala conservation area or koala sustainability area made assessable under a planning scheme, that is not for a domestic activity and will result in - C1 (a) clearing of native vegetation over an area greater than 2500m?; (1 (b) anew building and any reasonably associated structure with a total footprint greater than 1000m?; LJ (c)_ an extension to an existing building and any reasonably associated structure if the extension has a total footprint greater than 1000m2; (1 (a) extracting gravel, rock or sand from an area‘greater than 5000m2; [1 (e) excavating or filling an area greater than 5000m?, (8) additional traffic in a koala conservation area or koala sustainability area, between 6p.m. on a day and 6a.m. on the following day. C1 (i) reconfiguring a fot in a koala conservation area or koala sustainability area that will result in - (J (a) an increased number of lots; (1 (b) clearing of native vegetation over an area greater than 2500m?, D1 (ili) operational work in a koala conservation area or koala sustainability area made assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation over an area greater than 2500m?. (1 (iv) operational work in a koala conservation area or koala sustainability area made assessable under a planning scheme (not associated with a material change of use mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity and will result in — C1 (a) clearing of native vegetation over an area greater than 2500m2; LJ (b) extracting gravel, rock or sand from an area greater than 5000m2; ‘LA (0) excavating or filing an area greater than 5000m?. [7(v) none of the above. Wild river area For more information, refer to Guide 27 Ifyou answered YES to Q26, you must also complete section 2 of this checklist. This will enable you to determine if your application can proceed in a wild river area and which referral agency will assess your application against the Wild Rivers Code, or if the proposed development is “prohibited” in a wild river area, Note: Development can be ‘prohibited’ in a wild river area because the application cannot be accepted by the assessment manager. 26. Does the application involve development in a wild river area declared under the Wild Rivers Act 2005? [eho Clyes Preliminary Approval Ifyou answered YES to 027, the apptication triggers referral to the Department of Local Govemment, Planning, Sport and Recreation as an advice agency. 27. Does the application involve a development for which preliminary approval is sought under Section 3.1.6 of the Integrated Planning Act 1997? No Dyes Wetlands Domestic activity means the construction or use of a single residence on a lot and any reasonably associated building or structure. Examples of a building or stucture that could be reasonably associated with a single residence include: caretaker's residence, granny flat, building or structure used for a home business. Note: Wetland is defined in the Integrated Planning Regulation 1998. Unless you answered “none of the above” to Q28, the application involves referral to the Environmental Protection Agency as an advice agency for the application. 28. The application involves: (tick the applicable boxes) - LJ (i) amaterial change of use, other than for a domestic activity, assessable against the planning scheme that is in or within 100m of a wetland; Dil) reconfiguring a lot - In or within 100m of a wetland that will result in (1 (a) more than 10 lots being created; or 1] (b) tots less than 5 hectares: EAI) none of the above Page 9
Page 14
INTEGRATED PLANNING ACT 1997 Conservation Estate Urban purposes is defined in the Integrated Planning Act 1997 as "purposes for which land is used in cities or towns, including residential, industrial, sporting, recreation and commercial purposes, but not including environmental, conservation, rural, natural or wildemess area purposes”. Unless you answered ‘none of the above" to Q28, the application involves referral to the Environmental Protection Agency as an advice agency for the application. IDAS Assessment Checklist, Version 20, 2 April 2007 29. The application involves: (tick the applicable box/es)— LD (i) a material change of use for urban purposes that is in or within 100m of any of the following - . C1 (a) aprotected area, forest reserve, critical habitat or area of major interest under the Nature Conservation Act 1992;; (1) (b) a State forest or timber reserve under the Forestry Act 1959; [1 (c) amarine park under the Marine Parks Act 2004; [) (d) arecreation area under the Recreation Area Management Act 1988; [1 (e) a world heritage area listed under the World Heritage Convention; (1) (f} Brisbane forest park under the Brisbane Forest Park Act 1977. D0 (ii) reconfiguring a tot if - [1 (a) any part of the lot is situated in, or within 100m of, any of the following — (i) — aprotected area, forest reserve, critical habitat or area of major interest under the Nature Conservation Act 1992; C1 (ii) a State forest or timber reserve under the Forestry Act 1959; OD (iii) amarine park under the Marine Parks Act 2004; CJ (iv) arecreation area under the Recreation Area Management Act 1988; [CJ (v) — aworld heritage area listed under the World Heritage Convention; Brisbane forest park under the Brisbane Forest Park Act 1977; and 7 (b) the reconfiguration involves more than 10 lots being created, or any lot resulting from the reconfiguring is less than Sha; ‘ mii) none of the above. @ Page 10
Page 15
F
1
r
1
INTEGRATED PLANNING ACT 1997
‘ SECTION 2- ASSESSMENT IN A \ WILD RIVER AREA .
(completion mandatory if the proposed development i is located ina wild river area)+ +
iDAS Assessment Checklist, Version 20, 2 April 2007
Wild River Area
It the responsibility of the applicant to
determine i the development is proposed in
a wild river area,
Information about wild river areas including the
geographical location and position of
Management areas in.relation to properties, can
be accessed by contacting the Department of
Natural Resources and Water (NRW), accessing
the department's website www.new.gld.qov.au or
contacting the department by email on:
wild. [email protected],gov.au
Note on Referrals
Referrals for development in a wild river area
(other than for agricultural activities and animal
husbandry activities) are not changed from the
existing referral arrangements.
Notes on development assessable
against the Wild Rivers Code
For information regarding development in a wild
fiver area, sea the relevant wild river declaration
and Guide 27. The relevant witd river
declaration will provide information regarding
which types of development must be assessed
against the Wild Rivers Code, and'in some
cases which types of development are exempt
from wild river requirements,
The notes on development assessable against
the Wild Rivers Code in this section of the
checklist provide some guidance however this
may vary between wild fiver areas, The relevant
declaration wil provide the information applying
to each wild river area.
Applications far some new developments will nat |
be accepted if the proposed development is in a
high preservation area (HPA). Most applications
for development activities which may be made
including those in a preservation area (PA), must
be assessed against and must comply with the
Wild Rivers Code where indicated in a relevant
wild river declaration.
Environmentally relevant activities
{ERAs) in a designated urban area
Ifyou answered YES, your application for an
ERA is exempt from any wild river requirements
and provided there are no other aspects of this
development that require assessment against
wild rivers, you do not need to complete the
remaining questions in Section 2.
Ifyou answered NO to Q2, please complete the
remaining questions in Section 2.
1.
Which wild river area is the development proposed in?
The proposed development is to.be located in: (tick the applicable box/es)
(Ji) a high preservation area (HPA):
(7 ii) a preservation area (PA) ;
Oo iii) a wild river floodplain management area (FMA);
(7 iv) a wild river nominated waterway;
im v) a designated urban area (DUA).
Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area (as mapped in the relevant wild fiver declaration)?
i) An ERA 28 or ERA 14; or
ii) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
CO YES (ensure you have completed Part G of Form 1)
[-tnNo
Clearing native vegetation
IYES, there are a limited number of purposes
for which an application to clear native
vegetation may be accepted in a HPA. See
Guide 27 for a list of retevant purposes for
which an application may be made In a HPA.
if YES and you ticked Q4 box i) the application
may be made and is assessable against the Wild
Rivers Code. tf YES and you ticked Q4 box ii)
the application will not be accepted.
Note: If clearing native vegetation is in a PA,
there are no wild river requirements and
provided there are no other aspects of this
development where wild river requirements
apply, do not complete the remaining questions
in Section 2.
Is the application operational work for clearing native vegetation in a HPA?
(Etno
If YES, is the clearing?
O YES (ensure you have completed Part J of Form 1)
Oi clearing regrowth (as defined in the Vegetation Management Act 1999} in a registered
area of agriculture in a HPA (see Guide 27); or
(1 ii) in a HPA outside a registered area of agriculture?
Page 11
Page 16
INTEGRATED PLANNING ACT 1997
Works in tidal areas, coastal
management districts and-fish habitat
areas
Ifyou answered YES to Q5, and ticked any
boxes in Q6), your application is required to be
assessed against and must comply with the Wild
Rivers Code.
if you answered YES to Q5 and ticked box i) in
Q6, your application is required to be referred to
the EPA.
Note: If specified works are proposed in a local
government area, it is prescribed tidal work ~ the
relevant local government will be the
assessment manager with the EPA as a
concurrence agency
H you answered YES to Q5, and ticked box ii) or
ii) in Q6, your application requires referral to
DPIF.
if you answered NO to Q5 and ticked box i) in
Q6, the application will not be accepted.
if you answered NO to Q5, ticked box ii) in 6
and the development is necessary to install
authorised works or infrastructure where a
development permit is not required, or if a
required permit is held, the application must be
assessed against and must comply with the Wild
Rivers Code. Applications for purposes other
than specified works or as described above will
not be accepted.
If you answered NO at Q5 and ticked box iii) in
Q6, the application may be made if the works are
in aPA. These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed to be located in a HPA.
For more information about specified works refer
to Guide 27
Residential, commercial or industrial
development
If you answered YES to Q7, your application is
not subject to wild river requirements. Provided
there are no other aspects of this development
that require assessment against the relevant wild
river declaration or Wild Rivers Code, you do not
need to complete the remaining questions in
Section 2.
If you answered NO to Q7 and ticked either box
i) or i) in Q8, the assessing agency is the
felevant local government. The application must
be assessed against and must comply with the
Wild Rivers Code.
Animal husbandry activities
(f you answered YES to Q9 your application
requires assessment against and must comply
with the Wild Rivers Code.
The assessing agency is NRW.
Note: Applications for anima! husbandry
activities will not be accepted if proposed in a
HPA. For more details and a definition of animal
husbandry activities see the Wild Rivers Act
2005 and refer to Guide 27.
6.
IDAS Assessment Checklist, Version 20, 2 April 2007
Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
Development in a wild river area)
NO CJ Yes
The application is for one or more of the following:
[_] i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1); OF
(J i) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part Q2 of Form 1); OF
(1) iii) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).
Is the application for residential, commercial or industrial development in a designated urban
area?
(ZNO LI Yes
INO, does the application for residential, commercial or industrial development involve:
im) i) a material change of use made assessable in a local government planning scheme . 1
(ensure you have completed Part D of Form 1); or :
CJ ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
of Form 1).
Does the application involve a material change of use for animal husbandry activities (as defined
under the Wild Rivers Act 2005) in a PA?
(“TNO | YES (ensure you have completed Part R of Form 1)
Agricultural activities
lf you answered YES to Q10, your application
fequires assessment against and must comply
with the Wild Rivers Code.
The assessing agency is NRW.
Note: Applications for agricultural activities will
not be accepted if proposed in a HPA. For more
details and a definition of agricultural activites
see the Wild Rivers Act 2005 and refer to Guide
2.
The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
techniques is not an agricultural activity as
defined under the Wid Rivers Act 2005. For
10.
Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
a PA?
(eTNo
{f YES is the apptication for: :
(J i) a material change of use; or / '
(1 ii) operational works.
O YES (ensure you have completed Part Q of Form 1)
More information see Guide 27.
Page 12
Page 17
INTEGRATED PLANNING ACT 1997
Works that take overland flow water
The relevant wild river dectaration will state
works that take overland flow water are either
self assessable or assessable, or are exempt
from wild river requirements.
Hf you ticked Q13 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.
Ifyou ticked Q13 8) an application is not required
to be made however the works must comply with
the relevant self-assessabie section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
if you ticked Q13 iil) your application is not
Subject to wild river requirements.
Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.
13.
IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve works that take overland flow water in a HPA or an FMA?
[H{No Dyes (ensure you have completed Part Ks of Form 1)
If YES, is the application for works stated in the relevant wild river declaration to be?
(1) assessable works
O ii) self-assessable works
O ili) exempt works
Works that interfere with overland
flow water
The relevant wild river dectaration will state
works that interfere with overland flow water that
are either self assessable, assessable or exempt
from wild river requirements.
Ityou ticked Q15 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.
If you ticked Q15 ii) an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
ls required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
Ifyou ticked Q15 ili) your application is not
subject to wild river requirements.
Applications for development that is ather than
. that stated to be assessable, self-assessable or
exempt will not be accepted.
Waterway barrier works
Applications for buitding or raising waterway
barrier works in a HPA will not be accepted.
Ifyou answered YES to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
16.
Does the application involve works that interfere with overland flow water in a FMA?
[Afni O YES (ensure you have completed Part Kro of Form 1)
IFYES, is the application for works stated in the relevant wild rivers declaration to be?
(21 i) assessable works .
LJ ii) self-assessable works
(iii) exempt works
Does the application involve building or raising waterway barrier works in a PA?
ane) O YES (ensure you have completed Part O3 of Form 1)
Aquaculture {non ERA)
Applications for aquaculture in a HPA will not be
accepted.
Ifyou answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
Does the application involve aquaculture in a PA?
[Kio O YES (ensure you have completed Part O; of Form 1)
Works that interfere with water in a
watercourse
Note: if the development is proposed in a HPA,
applications for all works that interfere with water
in a watercourse (including dams or weirs,
stream realignment or stream diversion) will not
be accepted.
Ina PA, applications for instream dams and
weirs may be accepted in nominated waterways.
Ifyou ticked box ii) in Q19, your application will
hot be accepted.
Note: Operationat works outside 2 HPA or
nominated waterway are not subject to wild
river requirements.
More information and locations of nominated
waterways is available by contact NRW,
accessing the department's website
www. ninw.gid.gov.au of contacting the
department by emait on:
wild [email protected],au.
Does the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?
Erno
if YES,
oO i) The application is for an instream dam or weir; or
oO ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.
O YES (ensure you have completed the relevant Part K of Form 1)
Page 13
Page 18
INTEGRATED PLANNING ACT 1997
Environmentally relevant activities
Most applications for an ERA in a HPA will not
be accepted. Applications which may be made
fequife referral to the EPA. The assessment of
some ERAs is assessed by NRW, others have
been devolved to DPIF, NRW or delegated
local gevermment (see EPA website for more
information on devolved ERAs)
if you answered NO to Q20 you do not need to
complete Qs 21-24.
WF you answered YES to Q20 and the
development is in a PA, your application must be
assessed by the administering authority2*
against the Wild Rivers Code and must comply
with the code, unless the proposal is for
development where an application will not be
accepted, or is exempt from wild river
Tequirements (see Q2). You will be able to
determine if an application will nat be accepted
for the development by answering 021 ~ 024.
If you answered NO to Q21, you do not need to
complete Q22. If you answered YES to Q21 you
are required to complete Q22.
\f you answered NO to Q22, the application will
not be accepted. If you answered YES to Q22,
the application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code. :
H you answered NO to Q23 and the development
is proposed in the HPA the application will not be
accepted. ff you answered YES to Q23, the
application must be assessed by the EPA or
NRW (as prescribed in schedule 8A of the IPA)
against the Wild Rivers Code and must comply
with the code,
IF you answered YES to Q24 the application will
not be accepted. if you answered NO to 024,
your application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code.
Exempt ERAs in a designated urban
area
if the development is proposed in a designated
urban area there may be no wild river
Tequirements. See Section 2 Q2.
Note: All applications that can be accepted must
be assessed against and must comply with the
Wild Rivers Code (other than exempt ERAs ina
designated urban area).
20.
21.
22.
23.
24.
. IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve an ERA?
[No [YES (ensure you have completed Part G of Form4)
{s the application for an ERA 20 instream?
[ZNO (yes
Is a quarry allocation notice held for the proposed ERA 20 instream?
[No Cyes
Does the application involve any of the following in a HPA?
i) a level 2 ERA 11, (and is for specified works or a residential complex)
ii) an ERA 19 (dredging)
iii) Low impact ERA 20 (out of stream) for specified works or.a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)
iv) an ERA 22 (out of stream)
[afio Clyes
Is the proposed development for ERA 20 (out of stream) and;
— inaFMA; and
— not low impact; and
— not for a residential complex in the area, or for specified works.
[ano Clyes
Documentation
Hf you answered NO to 025, your application
may be subject to an information request and
processing of the application may be delayed.
25.
Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requirements,
as set out in the relevant part/s of the Wild Rivers Code? @
[fio Clyes
The administering authority may be either the EPA, or if devoived or delegated, the local goverment, DPIF or NRW.
Page 14
Page 19
INTEGRATED PLANNING ACT 1997 SECTION 3~ IDAS Assessment Checklist, Version 20, 2 Apri 2007 BUILDING REFERRALS (completion not mandatory) - we ot Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an application for building work assessable against the Building Regulation 2006 only. Special fire services - generally 1. For more information go to schedule 2 table 1 and Schedute 2A of the IP. Regulation. Assessment period 15 days. No response is a deemed refusal, An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work fequires special fire services mentioned in schedule 2A part 1 of the integrated Planning Regulation 1998 (IP Regulation) or includes an altemative solution assessed against the performance requirements of the Building Code of Australia. Fire safety for budget accommodation | 2. For more information go to schedule 2 of the IP Regutation An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work the subject of the application requires the installation of a fire safety system for a budget accommodation building. Spray painting 3. For more information go to schedule 2 of the IP Regulation An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency if the application involves a workplace incorporating spray painting. Retail meat premises 4. For more information go to schedule 2 of the IP Regulation An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a fetail meat premises. . Private health facilities 5. For more information go to schedule 2 of the IP. Regulation An application may trigger referral to the Department of Health as a concurrence agency if the application involves a private health facility. Workplace area less than 2.3m? 6. For more information go to schedule 2 of the IP Regutation . An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the application involves a work place area less that 2.3m?. Land contiguous to a State-controlled | 7. road For more information go to schedule 2 of the IP An application may trigger referral to the Department of Main Roads as a concurrence agency or advice agency if the application involves land contiguous to a State-controlled road. Pastoral workers accommodation 8. For more information go to.schedule 2 of the IP taf An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency lf the application involves pastoral workers accommodation. Child care centre 9. For more information go to schedule 2 of the IP Regulation An application may trigger referral to the Department of Communities as a concurrence agency if the application involves a childcare centre. Coastal development 10. For mare information go to schedule 2 of the IP Regulation : An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency if the application involves land completely or partly seaward of a coastal building line22. Heritage 11. For more information go to schedute 2 of the IP Regulation An application may trigger referral to the Heritage Council as a concurrence agency if the application involves a heritage registered place. Fisheries matters 12. For more information go to schedule 2 of the IP Requtation An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a concurrence agency if the application involves assessable building work in a declared fish habitat area; or as an advice agency if the application involves assessable building work on land that adjoins a declared fish habitat area. Integration of land use and public 13. transport. For more information go to schedule 2 of the IP Regulation An application may trigger referral to Queensland Transport as a concurrence agency if the application involves existing or future public transport corridors, or airport operational airspace?3, Railway safety and efficiency 14. For more information go to schedule 2 of the |P Regulation An application may trigger referral to Queensland Transport as a concurrence agency if the application involves future railway land. NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS The local goverment, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no response is taken to be a deemed approval. Amenity and aesthetic impact of 15. particular building work for single detached class 1 building or class 10 building or structure Fos more information go ta schedule 2 table 1 of the IP Regulation. Assessment period 15 days. No response is 2 deemed approval, An application will trigger a referral to the local government if it is : for a single detached class 1 building or class 10 structure; and ¢ the local government has declared by resolution the following: — the appearance of the building or structure wilt have an extremely adverse impact on the amenity of the tocality; and — the appearance of the building or structure would be in extreme conflict with the character of the locality. 2 Coastal buikding lines are prescribed under the Coastal Protection and Management Act 1995. 33 Operational airspace is as defined in State Planning Policy 1/02 "Development in the Vicinity of Certain Airports and Aviation Facilities”. Page 15
Page 20
@
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Whether particular buildings maybe | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a
occupied for residential purposes referral to the local government as the concurrence agency.
For more information go to schedule 2 table 1 of the
IP Regutation.
Assessment period 15 days. No response is a
deemed refusal.
Design and siting 17. An application may trigger referral to the local government as the concurrence agency if the building work
For more information go to schedule 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
IP Requtation. 18. An application may trigger referral to the local government as the concurrence agency if the building work
Assessment period 5 days. No response is a does not comply with the qualitative statement for building clearance and site cover.
deemed refusal. 19. An application may trigger referral to the local government as the concurrence agency if the building work
: does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, part 11 or 12.
Fire safety in particular budget 20. An application may trigger referral to the local government as the concurrence agency to determine the
accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has
For more information go to schedule 2 table 1 of the been completed.
IP Regulation.
Assessment period 15 days. No response is a
deemed refusal, :
Higher risk personal appearance 21. An application may trigger referral to the local govemment as the concurrence agency to determine if the
services building work
For more information go to schedule 2 table 1 of the * — complies with the performance criteria of the Queensland Development code part 15; and
{P Regulation and the QDC part 15. « — the work does not comply with an acceptable solution stated in the part.
Assessment period 15 days. No response is a
deemed refusal, . . .
Building work for residential service | 22. An application for building work for premises in which residential care service under the Residential
For more information go to schedute 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
{P Requlation and the QOC pan 20, referral to the-local government as the concurrence agency.
Assessment period 15 days. No response is a . ,
deemed refusal.
Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
rebuilding referral to the local government as the concurrence agency.
For more information go to schedule 2 table 1 of the
IP Regulation,
Assessment period § days. No response is a
deemed refusal.
Building work for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the
designated rainwater tank area
For more information go to schedule 2 table 1 of the
IP Regulation and the QDC part 25.
Assessment period 15 days. No response is a
deemed refusal.
duilding work or structure complies with the relevant performance criteria if -
e Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area; and
e Under the Queensland Development Code, part 25; the rainwater tank does not include an acceptable
solution for a relevant performance criteria.
Page 16
Page 21
O
46.00m 90° 00' 90", >
Xf
A Se ATS
TT
Sly) s
<\
2
A
20.00m 180° 00' 00"
270° 00' 00"
site plan
SCALE 1:200
1
2
UOT ton 12 Onan en Proposed Alterations and Additions to: PPROVAL
t 0422 MCERRGRS Gang Wa, 10G0(ED) ANE) OVNMOT BE USED ro SC eral an . BUILDING A RO 16 BA-01
969 645 OR PRODUCED BY ANOTHER PARTY WITHOUT WHITTEN 1 5 P D 12100
www.m-designs.com.aul ( Drawings to scale only on A3 sheets )
BSA No. 1066058 ° 1 2 s + fa AT Peregian Beach, For John & Liz Harrison —
= panty pst - 200x200 dressed HWD timber post. REV.
GENERAL NOTES TO 8UILDER -drewings to be read in association with refer to structural engineers drawings for -waterproofing of wet areas to be in TECEND FFL. Finished Floor Level . 02.10.07] B.A ISSUE
-contractor to confirm all dimensions, levels SPectfication and schedules of finishes all footing, slab and all wall details, timber accordance with section 3.8 of the B.C.A OG Nature Ground Level eng. Air fog anes I= 925 he at ats
and site conditions Including location -dimensions take precedent over scale and steel framing, including bracing, tie-down -stairs, handraits & balastrades to be In DP - 900 painted PVC Down Pipe d.w- dish washer me range oon weiter sean
of existing services on site prior to the “do not scale from drawings Sorte eee uetral members Se i eco oitephes. Vi_ Vanity basin wind washing mastine Wo hall oven Spat
commencement of works. efer relevant -provide termite protection In accordance -conceal all vent pipes waste + Closet dryer space .
any Australian Standards with AS 3660 within wall framing unless noted otherwise |C.H - Celling Height 8-stainless steel sink tile - tiled floor
Page 22
CPE |
an Be I cy CL >
sewer; 60
requirements by a qualified tradesperson
fr]
N
col = SHS with galv. finish extemally
DETAIL, SURVEY
2.x min 2500 It water tanks.
as per to M.S.C code requirements ; existing wall to remain
conc. base x contractor {garden}
ee —— _ timber stud wall
with town water top up supply AREA SUMMARY
Existing Floor 174.5 sq.m
Proposed Floor 108.8 squm
Proposed Pergoia's 41.1 sq.m
; powder coated finish Intemally Lora onpsss | )00Uté‘(,:*t*dL]CA Oto
) @ PHONE PRTECTOR TOAS 708 1993 | 1415 PERSIMMON DRIVE
fw FLOOR WASTE PEREGIAN BEACH PERGOLA i
1mx i
SB) a= ||E
$
BEDROOM. 3
100 stap
a ¥
S 3 [2
= | as 2
PSR & 0924 SW
as - 5
ea) |
aT
Wi
44.00 ° OO' CO"
™ 270" 00'00 wiry wal aka good oat ow floor plan
roof for addition SCALE 1:100
£ OF 54 082 126 © TH DEAS AND CONCEPTS CONTAINED WITHERS THER . eae .
ae soe ieee eee eee 145 Persim and n DV to: BUILDING APPROVAL 0716 BA-02
BSA No. 1066058 8 t 2 s + fn AT Peregian Beach, For John & Liz Harrison ( ngs only on
GENERAL NOTES TO BUILDER -drawings to be read in association with -refer to structural engineers drawings for ~waterproofing of wat areas to be In P- panty pst - 200x200 dressed HWD timber post |REV. [DATE |DESCRIPTION
-contractor to confirm all dimensions, levels SPecification and schedules of finishes all footing, slab and all wall details, timber accordance with section 3.8 of the B.C.A OSL Nate Sound Laval x FFL Finished Floor Level hp - gas hot plates - |62.10.07] B.A ISSUE
and site conditions including location -dimensions take precedent over scale and steel framing, Including bracing, tie-down —_-stalrs, handrais & balastrades to be in DP = B00 neried PG Doe ee at, hoor Waste rh - range hood over hot plates
of existing services on site prior to the -do not scale from drawings and sizing of structural members. accordance with section 3.9 of the B.C.A V - Vanity basin wrvd - washing mashina ref. space - refrigerator space
commencement of any works. -tefer specification for relevant -provide tarmite protection in accordance ~concsal all vent pipes and waste pipes WC - Water Closet with dryer space over Wo - wall oven
Australlan Standards with AS 3660 within wall framing unless noted otherwise | C.H - Celling Height 5 - stainless steel sink tile - tiled floor
Page 23
exposed HWD roofing battens as per
engineer
Remove existing tiled roof cladding
rovide new custom orb cormugated colourbond
cladding @ approx. 23° pitch to
existing roof structure.
dotallt &2
BAOO
TTT Lt
: altemative pollshed cone. base
to post support
north elevation
SCALE 1:100
te
extend new HWD roofing battens
to provide 600mm o’hang
refer floor plans for window & door sizes.
rendered block base to 500mm high
off f.f.1 supporting 200x200mm dressed
post to 2100mm H. fix directly/recessed
into post with 902 S.S column for timber
roof beam support
custom orb corrugated colourbond
toof cladding @ approx. 23° pitch to
‘custom orb corrugated colourbond
roof cladding @ 15° pitch on roof battens
‘on timber rafters to eng. spec
Pitching _
2700.00
3
&
Floor
: 00
tefer floor plans for extent of conc. 2.x min 5000 It water tanks
paving with square saw cut or tiled finish as per to M.S.C code requirements
fail from house. on conc. base x contractor
brickwork make good allow 1x tank connection to W.C & W.M
now onder pola iriah fw with town water top up supply
exposed HWD roofing battens Klip lock 700 roof sheeting @ min 15" pitch
engineer “0 & Per over reflective backed 50mm R2.5 wool blanket Remove existing tlad root cladding
on 50x75 hwd roof battens on rafters provide new custom orb corrugated colourbond,._
100mm box polystyrene awning roof cladding @ approx. 23° pitch to co
with render finish, fixing to manuf. spec, existing roof structure.: 3s
c
ply famed tilt-up panel garage 3
door (remote control) - paint finish gs
galy, steel frame
(TD)__ ail exdst. brickwork make good for
X17 __ new render palnt finish
SCALE 1:100
paving with square saw cut or tiled finish
fall from house
refer floor plans for window & door sizes
ORAWING REMAIN
u
OR PRODUCED BY.
(©) THE IDEAS AND CONCEPTS CONTANED WITHIN THES
THE PROPERTY OF
145 F Alterations and Additions to:
AT Peregian Beach, For John & Liz Harrison
5 Persimmon Dve
BUILDING APPROVAL
1:100 @A3
( Drawings to scale only on A3 shests )
0716 BA-03
a 1 2 3 on
~drawings to be read in association with -refer to
structural engineers drawings for
GEND
F.F 1 - Finished Floor Level
DESCRIPTION
DATE
-watarproofing of wet areas tp be in -
specification and schedules of finishes all footing, slab and all wall dtals, timber accordance with section 3.8 of the BCA NRG. Rendered NRO boa ado eae = Strato haf round zieahene iter > |02.10.07/ B.A ISSUE
-dimensions take precedent over scale and steal framing, Including bracing, te-down —_-stulrs, handrails & balastrades to be in RM Rare ocd pai Mish, T.C - 190mm wide profle CCA hwd —_D.P- Down Pipe 90mm PVC -peinted:
of existing services on sila prior to the -do not scale from drawings and sizing of structural members accordance with section 3.9 of theB.CA | AWN-F-G Awning 600mm fied! Timber Cladding or similar epproved SW Siding Window
commencement of any works. ~refer specification for relevant -provide termite protection In accordance -concea! all vent pipes and waste pipes —_| metal support FCB - Fibro Coment Shost Sy upd ne
Australian Standards with AS 3660 within wall framing unless noted otherwise |FLS - Root Sheeting (ref. elevations) Butt jointed - paint finish -
LV ___Louvred Window
Page 24
|
mopuiph pannel A =YSMB WED PEMIOT ANG —_(suoqenofe ‘yal) BunsEYS jomy- 74] eSMUEUTO pejou ssejuN GuruTey FEM UNA cost sv aM Spieping uajeasny
wopeA PER AG qaoug weuleo alqi4 - G4 poddns (e}0u sadd aysem pue sadid waa [Te [eaou0D- sourpoooe ul uoRoSyoud eyuE, apjrcud- TRASTaJ JO} UORBOYIOSds JaJar “som Aue Jo ]UeUNEOUAUILOS
Lpeuted: ona culiog Gig woe) - ag cores cucid opin Unig) -O'L Oo eee eH paeaiay NMY,| v0'8 eta 10 6'e UoRDes LIM souepscooe __, SUoqwaw paurjonygs jo Bugs pue SBUIMBIp WON) 9295 OU Op- 8 6) J0ud ens uo Sa0yu0s Bu SPO JO
Jenn6 eummeourz pune sey corns = 5 sfupeds unugz suoneg ysiuy weed pepares euray sequin Ul 9q 9} Sapanseied Pg SHeUpURY ‘SiEqS- wwnop-en “Buxpeuq Gurpnpuy Bupurey joes pus @[B9S 480 JUSpenard eYyEY SUd;SUCLITP- eo BoReOo| SuIphoUul SUORIPUCS ays PUB
anssivalzoorzo| - JOqUILL py YOO UNeS UBNOU GzxOG - 1 OH PEXY RBOO OUN Palepusy-uNY|) W'S O10 gE WORDES Lip BouRpAeoR 22QUR ‘SEREp [/2M NE pus qeyS 'Buyog; ja Saystuy jo saMpayos pure UoMETyHeds SPAS “SUOFSYEUUND [IB WUYUOD 0) JO|ER UOT
NOuUdmossa] sival “Aa | PAST] 20014 pousing = 744 ON2937 49 9g 0 Seaue }OM 30 Buyoardsayem- 40] sGuymaup sieeuTBue femongs 0] yer YIM UOTEPOSSe Uj pea Og 0} SGuMEIP- wadqiind OL SSION IVuSNaS |
} UOsWeH 27 9 UYOT JOY ‘ypeeg URiBeleg IY og ’ © z ‘ e 980990} “ON VSE
ee te te tel tl Ne woo'suBisep-ur aaa
(syeeys ey uo Ajuo ejeos 0} sBuyneig )
v0-Va 9120 IWAOUddY ONIGTINE SoStppy pie SoteeN ese SESS ieee
}
Zt 780 $6 207
warenig {Sey
Atddns dn doy seyem U0} LIK
r 7 2
WM 8 2'M O} ucgoeuUcS yURY x} MOT cot:
‘S8Z]S JOOP B MOPUIM 10) SuBId JOY 189}81 ———
b ssp x e509 000 Uo . > esnoy way 12)
sqewammba epoo 9'S'W 0) 28d g2 USIUY pera 40 yo wes ezenbs 1pm Bujaed yy
€ waters: |UONCAS|S }SOM Se ee
- — - ooo
- = " — 2001 PUNCID)
| | Pols punain | Eat cv
g °
c —_—1!=> 5 @
2 3 y as | as = a |
ala|e zt : Q
< oe: = boone
__. __| .poroozz Soo TTT AE ud
Med 5 ATI aT 1 os ti t
lJ 4 t ystuy qwied Jepued Meu
4 lori + 40) poo HONIG 7S/K8 [JE
4 1D fit
neda-punuseh song qui uo supa af EE LLL LLL Pp ve gz onde © Buppe 0
yoal uo 0) YOU .2 @ Burppep yoo 006 \ Gueyo puogmoros peyeBn0o Gio woysnd mau epyrold
Puoqunojoo peyeBnuco gro woyena ocr Bulpper jou pain Bunspee exowey
-empngs joo Bunsxe
oy und ez xardde ® Guyppep joos EUS Gyeud, ‘Bue. 859 008 ®
puoginojos payeBnuico qio woisn9 mau epyAcid —— TOS sveyel UO SuBEQ JOON PMY G/KDG UO
6ur In Buyspce eAous YAUPTT fOOM S°7y UILUNG pexyoeq eaRoeyed LEA
IPPEP Joal pain Bunshe exowe|y
upud .S1 ui ® Buheeus Joa Gz 4901 dipi
Addne dn doy 1e}e% Uo] UI
WM 8 3'M 0} UORDEULIOS YURY x) A0]]E
001+ 31vOS ustuy wred sepuay meu -———— 887] s00p 9 mopuim 40; suejd 40OYy s8Jau
UONeAS|S YINOS 221 Poo eu women re ony wey nbalepoo o's wasedes LC)
1} | T— ystuy Jepual Jo) pooh epeu 9 pexoud eq 0} YSUy pelq 40 No MBS BueNnbs yy Buj~ed— sjuewaunbey BPOo D's'W oy Led Be co
sBujuedo Gugspe yueseides seul; pepop “BUCO JO UB]Xe 10) sued JOOY sje! SUP] JEYEM 1 OOOS HILL XZ
Asopunoq
GBuexy,.o wig eplaaid 0} ae
gyeus suapeg Buyoo GMH Meu pusyre
00g] euTONys Joos Spc a} BurppEP joo ——~
puogino}ao quo wojsno Meu ep|Adud
Page 25
i sodid oysem pue sadid yU9A [12 fesouco- GOURPIOOTR uj UOROS}Oud aTUUA) eprAcud- TRAST 20} UOQPoYIoads aja- “som Aue JO ]UeWESUALLLIOS
W0'8 ef Jo 6g VOReS IA aouRpsocoR svequaw sEIMONY|s jo Burs pue sBuwmesp wows S780 you Op- uy) 0} Joud Sys UO sao}les Buysica Jo
ul eq &) sapeRseyed 2 STespuBy ‘syes- — umop-eg ‘Butalg Gurpnpuy ‘Bupey jeajs pus 9/298 18A0 jwepere.d eye} Suc}suOWIp- uo 200] Bulpnjouy suop|pUudo ays pue
V'0'R eg 10 gE UORDES 4pm eouEpoDTE vequin ‘STEIep [fea ve puB gers ‘Bugoo} fe © saysIUy Jo sainpayos pue YoTEyReds — STOASI ‘SUO!SUELUIP [fe ULAIUIOD 0} 1o}ARLICO-
‘ eSuaLRO pajou SsajuN SUEY REM UTM ogse Sv WIM Sprepunyg uRyERsnY
anssivalzoorzo| -
NOLLdMdSsag| suval ‘Aw On393) Ul @q 0} stare 18M JO Buyoaudayen 20) sBuymep seourBue PUTIONAS 0) 1ej8+ YA UORePDOSse U peas eq 0} SB wad OLSSON WEIN
(sqeeys ey uo Ajuo ejeos 3 sSuyneig ) : OLULLIS 1004 ueyBaleg LV r vg BBRO oN VES
f €v® 04:1 OA Uu ISJ } neue Bou
S0-V8 9120 IWAOUddV ONIGTING or aoobppy pus suoheiany Restdeus bee
Ualedlg [euoTA
|
oo
02:1 31vOS =a
> i
VVvLad WOIdAL m7 oz:L 3TvOS Ml 02:4 TIWOS
NWN1O9 SYNLVS4 i V Wiad 4 “O3dS ‘SNA OL ONIXIS V IVLSAd
bes i 4LYOddNS NNI09 HOS
I ‘pads ‘ONa wad K TIVVGNLS Sd waaniona
SW SNOILOSNNOO NMOG 31L JIVM ans Ag SLNAWSYINDTY NMOG SIL
“O3dS “JNNVW OL SSNUL NASWLL ||
— asYINOF Sv]-j
oO 4OOMCIALM ATALATaWOO ONIHSVT14 d/}9 ANOLAINdONd
SIV ‘NOLLONE NIN109 9 ONLLSSHS JOOY 4
© OL ONIHSV14 did ANOLARdOUd SCIAOYd a \ [_ wossios man
\QNN- TWL30 HINTId—j—e! | S —
He RNOSYA Od O3dS ‘ONS HadTY ; spade “ONS wad Sv SINaWRINOSE SS — gwd dOL SNILSSIHS ONIFOOU
! NMOG SIL AUVSSIOIN SCAN
LHOUdANS ‘ATVO AdVHS «1 OL ‘ONS AG LuOddNS
| ‘ G3Xi4 W¥3d 4OOu OMH +——__—___—___——---—"100 uV—TNONID ‘ATVO
AYVSSAOSN Ji SINSWIYINOTY 30vwo [o “OSdS "ONS Yad Sv SINSWSYINDAY
SLAWIUINOIY ONIXIA ot tt SNRIVW UOd MOTIV ‘O3dS ‘JNNYN Wv3a 400 j-—_———_ NMO0 3 ANVSS303N 3GIAOdd
Yd STIVLAG ‘ONA N34Fy | HUM ZONVGYODOV OL Gaxid fl ° JYOUddNS "ATO JdVHS «1. OL
ONIGAVIO 200¥ SW INONIZ H i 3X14 Waa JOOw GMH
SUL XVW 008 @ “ONA
SNALLVH 400¥ G3NALLVE he AG SUSLIVY
‘O3dS ‘ONA O1 SHS TWD OL OMH YB@WLL uwoZx0S
GIONS SLNULS OMH SOd 0S * 002 ———
SQN3 G3AVdS ‘OAdS “ONS OL SNALLVE Y3SWIL OL ALLOSYIO
SULD WWE O SUSL-fve GMH f sven Q3X14 ONLLASHS JOON
“HSNId LNIWd> N @®
HIM SHS 004 X 001 “ATV ©
© oot: aWWOS
Le eumuembes V-V Uoljoes
=4 — BuRoo} meu |JB 10; seds “Bue sey) be
“+ ujewial 0} Buyeo) Bu; SAND
SiIV13d NMOG ALL ONIX 4 oF os, reuar oy enpoos Suns A a
4OOH HOd O3dS “ONS Hae —_\_—] we DY Poy Lb YER \» » : ee
KEES ANDi NS NANOS | DA OSS 2vK £1 Ls KY
SS WW Jooy " wW100y ~
[i SNIAN 1
002 X J puazke| nozoa joo yoyeu i sup xeui osy @ su J} none -20ds -Bue sed se ysiuy pein
8 nh F sequin jo Buyuny jeyoul 0} AQoau|p Taped @“aue0 ur ne
es °" Museen puncu = peng Bujuuy) Buyjes preoqueyserd witio| ql: sayeseq q Pesuojutes 3
‘Bue 006 » ipied Ansouvus a onc pany upnd .¢1 @ prouo wopog Ie Usqy 203 [fs puncue 9 dn en ‘sede
Sasa hee a funnest ta Spaz aes ome | | I matteme se meena
ted 0 whut 7001 Gol wo, dua pbogina O _uhugoz x08 xz 01 pexy SHS ‘Ae8 Uk ~~. f Ms + —
° . 1y Guay 7S ae a 1 Guyusy
‘ustuy! NO} ‘seds ‘Bus 0) $89 006 @ LH -
Wy Qiu ulysey ep S1GYBI UO SUBTE JOOU PMY SZX0S to
Feuer mom $2 oa paypeg eanneyas vas ono
youd .S} ulw & Bugeays yoo 002 Te as Seep Bupy gy UMOP en 'sIEqueL
VieiP Virsep @unganys sO0u [JB 40) ‘eds ‘Bue Jejel
Page 26
If telephoning or calling please ask for: Andrew Everett (07) 5449 5226 06/1860 (Our ref) Email: [email protected] Your Ref: 41 October 2007 John Anstead Harrison CARE John Anstead Harrison 415 Persimmon Drive PEREGIAN BEACH QLD 4573 Dear John Harrison, Re: Application for alternative siting provisions at property situated at 115 Persimmon Dr Peregian Beach described as Lot 490 on P.931.48. Request for additional information | acknowledge receipt of your application for an amended decision for the alternative siting provisions approved 13 September 2006 and advise that preliminary assessment of your application has determined that the proposed building works do not comply with the Building Works Code for the following reasons: - ° Roof overhang is less 600mm (This can be achieved by a 450mm eaves and 150mm wide gutter); As a result of the non-compliance, you now have a number of options available, namely: - 4. Amend your plans so as to avoid the need for a Code Assessment and to enable us to assess the siting only, or 2. Leave the plans as they are; withdraw your application for a Siting Variation; and lodge a new application for a Code Assessment that will cover all of the areas of non compliance (including siting); or 3. Leave the plans as they are; continue with the current application to assess the siting and !odge an additional application for a Code Assessment to assess the other areas of non-compliance mentioned above at a later date. Should you decide to opt for options 2 or 3, this will also require additional assessment fees be paid as determined by Council's Land Use Section. Should you decide to opt for option 1 and amend your plans accordingly, please advise and forward the amended plans to us as soon as possible. NOOSA COUNCIL sexvvrosaein Ac:\docume~1\severettocals~1temp\d 1 553bidinfosv 161382 @atican Street, Tewantin PO Box 141, Tewantin Q 4565 Phone: 07 5449 5200 Fax: 07 5447 1062 Email: [email protected]
Page 27
Should you decide to opt for option 1 and amend your plans accordingly, then the following further information will.be required to enable the siting variation to be assessed: - As the design is altered significantly from that previously approved, these plans need to lodged as a new application altogether with full fees. Please be advised that your application will be held in abeyance until you have notified us in writing of your intentions. Should you have any queries regarding the contents of this letter, please contact Building Services on (07) 5449 5260. Yours faithtoliy. Yo drew Everett SENIOR BUILDING SURVEYOR - BUILDING SERVICES Ac:\docume~T\aeveretiVocals~ 1 Vemp\d 1 553bidinfosv 1 61382.doc
Page 28
@ NOOSA SHIRE COUNCIL ‘ Dana Mckenzie Page | of 1 From: john harrison ([email protected]} Sent: Friday, 5 October 2007 3:29 PM To: Dana Mckenzie Subject: Eave relaxation 115 persimmon drive ’ NOOSA SHIRE COUNCIL 5/10/07 RE 115 Persimmon Drive Peregian Beach To whom it may concern, Yours Faithfully, JA Harrison. 081007_kodakscanner_094730_001 tif 5/10/2007 JA&EM Harrison PO Box 835 Coolum Beach 4573 I would like to apply for a building relaxation. For a 600mm eave overhang on the garage.(eastern elevation) The reasons being that it will aesthetically improve the street appeal, give a shadow line & match the rest of the house.
Page 29
If telephoning or calling please ask for: D J McKenzie, 07 5449 5260 Email [email protected] Application Ref: 2006/1860 Your Ref: 13 September 2006 John Anstead Harrison PO Box 835 COOLUM BEACH Qld 4573 Dear Sir, Re: Application for Alternative Siting Provisions - Garage situated at 115 Persimmon Drive PEREGIAN BEACH described as LOT: 490 P: 93148 | refer to your application and advise that on 13 September 2006 Council decided to approve the application and grant a Preliminary Approval, subject to conditions. Details of the decision are contained in the attached Local Government Advice. You are entitled to appeal against this decision. A copy of the relevant appeal provisions is also attached. Should you wish to obtain more information about Council’s decision, please contact Council's Building Services Section on 5449 5260. Yours faithfully, GJ Jorgensen MANAGER — BUILDING SERVICES Enct: Decision Notice MINoe CHANAR _ (Duatd LTR TO Cave O|O- 2006 - OCOO1SLO. COZ_ Award Winner - Australian Clean Beach wor nner ustra ran fan eae NOOSA COUNCIL ASN 97 969 214 121 Challenge 2004 Litter Prevention 9 Pelican Street Tewantin PO Box 141 Tewantin Q 4565 Phone: 07 5449 5200 Fax: 07 5447 1062 Email: [email protected]
Page 30
eta Wi@lONy2— Local Government Advice
or eee STANDARD BUILDING REGULATION 1993, s20
File No: 2006/1860 Date of Decision: 13/9/2006
{ 1. APPLICANT DETAILS
Name: John Anstead Harrison
_ PO Box 835
Postal address: CQOLUM BEACH Qld 4573
Phone no: Fax no:
[2 PROPERTY DESCRIPTION
Street address: 115 Persimmon Drive PEREGIAN BEACH
Real property LOT: 490 P: 93148
description:
{ 3. OWNER DETAILS |
Name: John Anstead Harrison & Elizabeth McCann Harrison
Postal address: 115 Persimmon Drive
PEREGIAN BEACH QLD 4573
{ 4. APPLICATION TYPE
Development Development Details Siting Approved Development
Permit
Building Work Standard Building Regulation s20 Yes No
— Modification to Alternative
Siting Provisions
5. DECISION DETAILS
Council decided to approve the application to vary siting requirements under the Noosa Plan.
‘16. EXTENT OF APPROVAL
This approval is granted as an assessment against the specific outcomes of the siting provisions of the Noosa
Plan.
As an assessment against the performance requirements of the siting provisions of the Queensland
Development Code (QDC) Part 12 ~ Design and Siting Standards for Single Detached Housing lots 450m? and
over.
{ 7. APPLICABLE CODES
. The developer must comply with the relevant codes for self assessable development of the Noosa Plan.
[8 CONDITIONS
The approval is subject to conditions. Noosa Council's conditions are attached.
Page 31
“NOOSA COUNCIL - Local Government Advice
2 of 4
1 9. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required
Development Permit - Building Work
{10. RIGHTS OF APPEAL
Rights of appeal in relation to this application are attached.
{ 11. ASSESSMENT MANAGER
Name: Noosa Council Signature: yo
Greg Jorgensen
Manager — Building Services
A p:\civica\documents\dd\0 1 0\from 1 00010 10-2006-00001860-007\0001dec_sbr.doc
Date:
13/9/2006
Page 32
“NOOSA SOUNCIL — Local Government Advice 3 of 4 NOOSA Noosa Council Conditions STANDARD BUILDING REGULATION 1992, s20 General Conditions 1. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are number 0613 Page 1, 2, 3 & 6, drawn by Intex Design Group, titled Site Works, Level 1 Floor Plan & Fitout, Exterior Elevations and Sections, and as may be amended by these conditions. 2. The eaves overhangs from additions and alterations to existing dwelling to be constructed with a setback of 5.43 metres from the outer most projection to the road boundary as shown on the approved plan of development. 3. The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. 4. Prior to the commencement of development, the following development Permits must be obtained:- 4.1. Development Permit for Building Works. End of Conditions A pi\civica\documents\dai0 1 OVrom 1000\010-2006-00001 860-001\0001dec_sbr.doc
Page 33
NOOSA COUNCIL - Local Government Advice 4o0f4
es ieee Right of Appeal
Sections 20 and 21 of the Standard Building Reguiations 1993 makes provision for an appeal to be made to a
building tribunal if the applicant is dissatisfied with a decision made by local government with regard to decisions
involving matters relating to Schedule 6 (Building work requiring local government approval or decision) of the
Standard Building Regulations 1993.
An appeal must be started within -
(a) 20 business days after the advice is given to the applicant; or
{b) 20 business days after the decision on the development application is made.
If a building application has been lodged with a private certifier and an appeal is started, the appellant must
advise the private certifier that an appeal has been started.
If a private certifier has received advice that an appeal has been started, the private certifier must not
decide the application until the appeal is decided or withdrawn.
The appeal can be registered on the appropriate form and remitted together with the current fee. For
further details contact:
The Registrar
Building Codes Queensland
Department of Local Government and Planning
PO Box 31 BRISBANE ALBERT STREET QLD 4002
Telephone: (07) 3237 0403 Facsimile: (07) 3237 1248
A 13/09/2006 p:\civica\documents\dd\01 0\jrom!000\0 1 0-2006-00001860-001\0001dec_sbr.doc
Page 34
$s REPRINT #4 4 te v ABN #:97969214121 Noosa Council 9 Pelican Street TEWANTIN QLD 4565 Ph 5449 5200 Fax 5447 1062 Email: [email protected] Date 25/10/2007 10:26 Receipt 00345654:0001 Terminal 3:6629 John Anstead Harrison 115 Persimmon Drive PEREGIAN BEACH QLD 4873 Details Amount Land-Use App fees 125.00 017.2007 .00002184.001 Credit Card Charge 0.88 0018015 0283 .0606 Total Value: 125.88 Tendered Other 125.88 Change 0.00 Pay your rates by phoning 1300 880 250 or on-line at wHW.noosa.qld.gov.au
Page 35
ria LAND USE SECTION FEES fw BCI 7 RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme Documentation 520 Copy of Permit/Approval Letter 110 The Noosa Plan Documentation 111 APPLICATION FEES Material Change of Use - Code/Impact Consistent 33 Ss 521 Inconsistent 521 Assessment under Superseded Planning Scheme 521 Modification to a Development Permit . 521 Extension of a Currency Period 521 Operational Works - Landscaping / 521 @ Bldg Work assessable against the Planning Scheme 521 PRE LODGEMENT REVIEW Half Hour 522 One Hour §22 ADVERTISING Purchase Advertised Applications 523 JETTIES Jetty Application Fee 524 Jetty Bond 51 (Category 4) BONDS Performance Bond 51 (Category 9) SIGNS Registration Fee : 222 Qicu ree Search of Land Use Section file 112 Liquor Licensing Request 113 ‘ TOTAL $ 538 — NAME: Je Hee Son ADDRESS: (0 fore 35, CoS Le MN lps > FILENO: |] 2ime DATE: — 2+¢rofery t 7 RECEIPT NO: 2 Ly 9 Signature of TP Officer: AUTHORITY NO: 7 1 027 [ue Ky,
Page 36
¢ CALCULATION OF FEES APPLICATION FEE TOTAL FEES MCU - CODE ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION MCU - IMPACT ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION OPERATIONAL WORKS Details of Development FEE CALCULATION TOTAL FEES
Page 37
on ' . Sin eee REPRINT #44 ABN #:97969214121 Noosa Council 9 Pelican Street TEWANTIN QLD 4565 Ph 6449 5200 Fax 5447 1062 Ena mai [email protected] Web: Date 05/10/2007 10:22 Receipt 00342306,0001 TdMninal JOHN HARRISON Details 16629 Amount G/L No GST Div 81 125.00 15 persimmon dr dit Card Charge 0.88 0018015 .0283. 0606 Credit Card Char Total Value: 125.88 Tendered Credit 125.88 Change 0.00
Page 38
Payee Name:
~d
DEVELOPMENT FEES AND CONTRIBUTIONS
Address:
Swimming Poo! First Reg - (New) 32/12027.423.701
Doc Lodgement Fee - Stat Group 32/12023.423.760
Doc Sales, Retrieval of Plans 31/12023.215.879
Boundary Setback Relaxation Fee I2S- aoa. 32/12023.423.717
CMS Endorsement Fee 32/12023.423.717
{Other Building 32/12023.423.723
Soil Testing 31/12023.423.723
Building Search . 34/12023.423.779
Building Search - Pool Compliance 34/12028.293.636
PAYEE NAME:—jo,,,) LlAeRISoH .
ADDRESS:
Po Bex Sas
Coolum Besa AST s .
FILE NO: WS Beare fF P/&L.
DATE:
{RECEIPT NO:
I2oe32 Yr FoR
Used in these records
07/2184 - Preliminary Building Work Assessable Against the Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.