INTEGRATED PLANNING ACT 1997

 

- Land owner's consent (f applicable)

| ection 3.2.1(3) ofthe IPA prescribes that an

{ @pplication must contain, or be supported by, the

y writen consent of the land owners, if the application

+ involves:

2{) a material change of use;

°@)_ reconfiguration of a bot;

{F) work on land below high-water mark & not within a
canal as defined under the Coastal Protection and
Management Act 1995;0r

rc) ‘work on rail corridor land defined under the

1” Transport infrastructure Act 1994.

Section 3.8.1{2)(a) of the IPA provides that

; landowner's consent ls not required for a mobile or

, bemporary ERA .

‘ For more information refer to Guide 1,

Part A, Version 2.4, 29 May 2006
20. Land owner's consent to the making of this application: a
Name . ignature Date

” Deer. Mbt . Mom: vesececeneeee Lysto:04
i

 

 

 

 

 

 

 

 

 

"Resource entitlement (f applicable)

. Section 3.2,1(5) of the IPA requires evidence of

* resource entitlement be given for applications that
involve a prescribed State resource.

+ Section 3.2.1(10)(a)(i) of the IPA prescribes that an

garnet be taken to be properly made
* without evidence of the resource entitlement.
1 & 22

Refer to schadute 10 of the integrated Planning
Regutation 1998 that prescribes the nature of evidence
required by the State in support of the fodging of this
development application.

Advice for completing 023
The information in (i) - (v) is mandatory if evidence is
required under Q22 (il) or {i) above,

"The official stamp of the Department of Natural
Resources, Mines and Water is mandatory where the
application involves any water or riverine quarry
material under the Water Act 2000.

Section 3,2.1(5A) allows the resource manager to limit
the time the evidence may be used. Q23 (vi) must be

21. Does this application involve a State resource prescribed under a regulation (other than involving
quarry material on State coastal land under the Coastal Protection and Management Act 1995)?

LINO - goto 024 (2 YES - goto a2

22. This application is accompanied by evidence: (tick appticable box)
C1 (i) of the allocation of, or entitlement to, the resource - attach evidence and go to 023(v)
CD (ii) ‘the chief executive of the department administering the resource is satisfied the

development is consistent with an allocation of, or entitlement to, the resource - go
to Q23

(CA (iii) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or @
entitlement to, the resource - go to Q23

 

23. Evidence of the resource entitlement:

() Resource entitlement / authority details (vil) Official stamp of the department
administering the resource (if
applicable)

(ii) Name of “ere officer

 

 

 

 

 

 

 

 

 

 

 

 

 

 

tod ft the evldenoe is tine tinted, (iii) Position of — officer
(iv) Signature of delegated officer
(vy) Date
(vi) pen date of evidence a
Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application? : ©
! This checklist does pot apply Hf the application requires C1 Yes : (INO - the assessment manager may refuse to accept this application on the
the completion of Parts A and B of the Form only. It :
“esto oompltd fr al oer eppicaions grounds that the application has not been properly made ; .
“Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:
| Sapnent tn proposal & scab he aonerent Plan / Drawing / Report Number Title Date
+ Manager, referral agencies and any person viewing a
* the application during public scrutiny or public (i)
- Notification to understand the scope ofthe proposal ff reno r reeset een r er errecceeseccndecsnccccccesccccceecencnnceee cnn taweseamece ere
_ and any potential impact. (ii)
(iii)
(iv)

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.

 

OFFICE USE ONLY (applicable to assessment manager's)

 

[rem OS | pepenen

 

 

lrefie for [ee 7) L mens. | 7 /Z, ie |

 

 

To.

 

Notification of Engagement of Private Certifier ‘ontonettomal?”

Date ofengagement / / Accreditation Number. ___ Name: Signature:

Council, | have been engaged as the private certifier for the building work referred to in this application.

 

 

Used in these records

About this file

File size
2.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2184 - Preliminary Building Work Assessable Against the Planning Scheme [As Published].pdf · 2.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.