Council archive · source document
07/2184 - Preliminary Building Work Assessable Against the Planning Scheme [As Published] · 172007.2184
INTEGRATED PLANNING ACT 1997
Part E, Version 2.1, 18 June 2007
Form 1 Development Application
Operational &/or building work
assessable against a local government’s planning scheme
t=
@2
<=
Qt
Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work assessable
against a local government's planning scheme (including detailed engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual
design plans for engineering & buikding work when the application does not involve assessment of a material change of use of premises at the same time).
Nature of the works 1. The application is seeking approval of (tick one (1) or both if applicable):
The types of work that are assessable against, Building work assessable against a planning scheme - provide details of the aspects of building
a planning scheme are determined by the work (e.9. building height greater than 8.5m; building work on high landslip risk area)
* scheme for a particular focal goverment and
will vary across the State. | ‘ : |
To determine the types of work that are (2 Operational work assessable against a planning scheme - provide details of the nature of the
assessable under a particular planning operational work (e.g. roadworks; landscaping; drainage works: stormwater; water infrastructure; sewerage
scheme, contact the relevant local infrastructure; earthworks; clearing vegetation; signage)
govemment. =
The information in Q2 is necessary for [
statistical and planning purposes. 2. _ Is the application for operational work involving the creation of new lots?
CINo (YES - specify number of new lots to be created below
3, Does the proposal involve the construction of a canal that is associated with reconfiguring a lot?
LI No OYes .
Nature of the application 4. This application is for: (tick one (1) or both if applicable)
A development permit authorises Preliminary approval - provide details of the type of work eg. roadwork, stormwater, water and sewerage
development to occur, while a preliminary infrastructure, etc *
approval is a step in the approval process -
and does not authorise development to occur. | Atic- athiew a anelchrnrrn he heowre.
O Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure, etc
5. Are the works subsequent to a previous development permit or preliminary approval?
J No (1 YES - provide details of all previous approvals
List of approval reference/s Date approved Date approval lapses
/ / / {
Portable Long Service Leave levy (if |6. ls payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
applicable) . | (1 YES - complete a7
Prior to issuing a development permit for the
works, the assessment manager is required O NO - Q7, 8&9 do not apply
by law to “sight” an approved form, issued by .
Qleave, which signifies that the PLSLlevy |7. Has the PLSL levy been paid?
has been paid. . (YES - compiete 08
For further information refer to
http Awww. gleave.qld.gov.au Oo NO - the applicable levy must be paid before a development permit can be given for the works
8. How much was paid?
9. Whatis the receipt number of the payment?
| _]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2184 - Preliminary Building Work Assessable Against the Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.