Attachment C - Soil Survey Report · MCU18/0013

Attached to the e-mail Response to info request part 1- MCU18/0013.

of 71

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Project No. 1-20119                                                                                                              Page | 24
March, 2018
Ref: 1-20119, 2018-03-02, BR VER 2
Sam Hopper – Slope Stability Assessment and Geotechnical Report - Proposed Residence, 24 Arakon Crescent, Sunshine Beach




trench. Beyond 1.0m the footings should be taken a minimum of 200mm below an imaginary
line drawn up at 450 from the trench base level. Figure 4 refers. These requirements do not
override minimum footing levels.




                                           Service Trench                                                   1

                                                      or                                             1

                                            Retaining Wall                                                       200mm




                                                                                                                 Found footings
                                                                                   1.0m                          Below these lines


                                                                                  200mm


                                                                   FIGURE 4

           7.2.8       Site Management

It is important that proper site management methods be observed for the existing soil conditions
by both the builder at the time of the construction and the owner throughout the life of the
proposed development.

Particular reference to this is set out in AS 2870-2011. It should be noted that where proper site
management, particularly with respect to change in moisture conditions, is not followed, the
foundation recommendations contained in this report could be considered void.

The following are some specific comments with respect to site management and the reader is
also directed to CSIRO pamphlet, 10-91, ‘to Home Owners on Foundation Maintenance and
Footing Performance’ for further information:-

                It is important that the site be well drained. The ground around the building should
                 slope away at 1 in 20 for 2 metres and then fall to the stormwater system to prevent
                 ponding of water adjacent to the building.
                Roof downpipes and garden taps should not be allowed to saturate founding soils.
                Footings should be placed with minimal delay after excavation to avoid desiccation
                 or wetting of the founding soils. If footings cannot be poured on the same day as
                 excavation, a blinding layer of 50mm thickness is recommended. Piers should be
                 poured immediately following excavation.
                Do not let the slab subgrade "dry out" prior to casting.

Used in these records

About this file

File size
4.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment C - Soil Survey Report.pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.