4. MCU130098 Decision Notice (approval) · MCU13/0098
Attached to the e-mail Operational Works Application to MCU13 0098 42 Hofmann Drive Noosaville.
MCU13/0098
16. Bicycle facilities in accordance with AS2890.3 Bicycle Parking Facilities must be
provided for the development. The facilities must be indicated on the plans and
submitted in accordance with an Operational Works approval and must include in
particular:
(a) a total of 19 bicycle parking spaces
(b) end of trip facilities involving a minimum of 10 lockers and 1 shower
cubicle with an ancillary change room.
Earthworks and Retaining Walls
17. All retaining walls must be designed and constructed in accordance with the
planning scheme and must be certified by an RPEQ where exceeding 1.0m in
height.
HYDRAULICS AND WATER QUALITY
Stormwater Drainage
18. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval and QUDM, and must include in particular:
(a) the works shown on the Referenced Plans listed in this Decision Notice
(b) collection and discharge of stormwater to the existing stormwater
easement along the frontage of the site.
(c) the use of gravity stormwater drainage and not surcharge pits.
Stormwater Quality Management
19. A stormwater quality treatment system must be provided for the development.
The works must be undertaken in accordance with an Operational Works
approval and the Bioretention Technical Design Guidelines (Water by Design ,
20 12), and must include in particular:
(a) stormwater quality treatment devices of a size and location generally in
accordance with those shown on the integrated water cycle management
plans listed in this Decision Notice
(b) bioretention devices which :
(i) are designed generally in accordance with IPWEQA Standard
Drawing No. WSUD-001
(ii) are provided with a free-draining outlet from the sub-soil drainage
system
20 . Permanent educational signage* must be erected to educate the customers to
the development about the function of the bioretention device(s). The
dimensions, standard, presentation and location of the educational signage must
be in accordance with an Operational Works approval.
*(Refer to Advisory Note)
21. All stormwater quality treatment devices must be maintained in accordance with
the Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version
1). The approved Operational Works drawings for the stormwater quality
treatment system and detailed life cycle costing of the system must be attached
PD-DA-FM1420s/4-0 1/10/2013 Page 4 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
4. MCU130098 Decision Notice (approval).pdfRelated documentApplication case desk ↗
About this file
- File size
- 436 KB (small file)
- File type
No other editions are linked here.