4. MCU130098 Decision Notice (approval) · MCU13/0098

Attached to the e-mail Operational Works Application to MCU13 0098 42 Hofmann Drive Noosaville.

of 13

Text shows just the words. Original shows the document exactly as it was published.

                                                                                 MCU13/0098



          as an addendum to this document. Records of all maintenance activities
          undertaken must be kept and made available to Council upon request.
          Stormwater Harvesting
22.       Operating stormwater harvesting tanks must be provided for the development.
          The tanks must be provided in accordance with an Building Works approval and
          must include in particular:
          (a)       the details identified in drawing 2783-2 of the integrated water cycle
                    management plan listed in this Decision Notice
          (b)       a total tank capacity of 22 500 litres
          (c)       a catchment of 90% of the building roof area
          (d)       a distribution of 50% of the total capacity for stormwater harvesting and
                    the balance for detention purposes
          (e)       re-use of harvested stormwater for internal non-potable uses and outdoor
                    uses.
ENVIRONMENT
          Waste Management
23.       Refuse storage, removal and collection facilities must be provided in accordance
          with the following:
          (f)       Provision of separate bins (2401 wheelie bins or 1.1 m3 bulk bins) for
                    general and recyclable waste for the site.
          (g)       Collection by service vehicles from within the site or from the kerbside of
                    the internal service road.
          (h)       Provision of a hardstand impervious area within the site for the permanent
                    storage location of the bins, having minimum dimensions of 0.36 m2
                    (600mm x 600mm) per wheelie bin or minimum dimensions of 0.36 m2
                    (600mm x 600mm) per bulk bin.
          (i)       Provision of a 1.5m high purpose built enclosure to the storage location
                    which is screened from the street.
                    Provision of a wash-down area in the vicinity of the permanent storage
                    location fitted with a hose-cock and a drain connected to the sewer that
                    has a stormwater catchment area of no more than 1m 2 •
UNITYWATER
24.       Connection to Unitywater live water mains and the Unitywater live sewer system
          must be undertaken by Unitywater at the applicants cost.
25.       Construction activities must not impede the access of Unitywater or Fire Brigade
          personnel to vital infrastructure (eg. valves, fire hydrants and sewer access
          chambers).
26.       The fire-fighting demand on Unitywater's water supply system from the
          development must not exceed 30 litres per second .
27.       A single Unitywater installed primary water meter must be provided immediately
          inside the property boundary. Additional water meters must be installed for each
          title of a community title or sub-lease scheme. Meters must be Unitywater




PO-OA-FM1420s/4-01 /1 0/2013                                                           Page 5 of 11

Used in these records

About this file

File size
436 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

4. MCU130098 Decision Notice (approval).pdf · 436 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.