Skip to the record
Accept no imitations.

Council archive · source document

4. MCU130098 Decision Notice (approval) · MCU13/0098

Attached to the e-mail Operational Works Application to MCU13 0098 42 Hofmann Drive Noosaville.

of 13

Text shows just the words. Original shows the document exactly as it was published.

                                                                                MCU13/0098



          approved , installed in accordance with Unitywater requirements and remain
          accessible at all times for reading and maintenance purposes.
 28.      Water meters must be located on alternative boundaries to electrical pillars.
 29.      Buildings and other structures must maintain a minimum clearance of 1.5 metres
          from Unitywater sewer mains, and 1.0 metre from a sewer manhole chamber or
          sewer inspection opening.
 30 .     Storm water retention systems and gross pollutant traps must maintain a
          minimum clearance of 1.5 metres from Unitywater water supply and sewerage
          infrastructure.
 31 .     Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
          Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
          Landscaping plants within these clearances must be low growing when mature,
          and suitable approved varieties .
 32.      Construction works undertaken in the vicinity of Unitywater water supply or
          sewerage infrastructure must not adversely affect the integrity of the
          infrastructure. All costs associated with repair, replacement or alteration of
          infrastructure must be met by the applicant.
 33.      A Trade Waste permit is required prior to any storm water, groundwater or sump
          pump discharge into Unitywater's sewerage system .
 34.      Plans and documentation must be submitted to Unitywater with a completed
          application for a trade waste permit. This is required prior to obtaining a plumbing
          approval from Council.


I 5.    REFERRAL AGENCIES

 Not Applicable.

I 6.    APPROVED PLANS

 The following plans are Approved Plans for the development:

 Approved Plans
 Plan No.           Rev.      Plan Name                                       Date
 DA01               B         Site Plan, prepared by Soul Space Building      14 June 2013
                              Design
 DA03               B         Mezzanine Plan , prepared by Soul Space         14 June 2013
                              Building Design

 The following plans require amendment prior to becoming Approved Plans for the
 development:

 Plans Requiring Amendment
 Plan No.                             Rev.   Plan Name                                    Date
 DA02                                 B      Ground Floor Plan , prepared by Soul         14 June
                                             Space Bu ilding Design                       2013




 PD-DA-FM1420s/4-01/10/2013                                                           Page 6 of 11

Used in these records

About this file

File size
436 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

4. MCU130098 Decision Notice (approval).pdf · 436 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.