Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2018-12-11 S&O Agenda - Attachment 1 to Item 16 - Road Infrastructure Asset Management Plan

of 55

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
   •   Pedestrian crossings
   •   Road Furniture
   •   Barriers/Guardrails
   •   Bus Stops
   •   Retaining Walls
   •   Signage
   •   Waste

In asset reporting an approach to linking individual assets to the specific asset class has been
undertaken. Figure 1 details sealed and gravel road conditions and at figures 2 & 3 include all other
road infrastructure asset classes that are considered in this AMP. These assets are grouped
consistently and reported accordingly throughout this document. Any road infrastructure assets that
have reached condition 5 will be included in the relevant renewal programs of the 10-year Capital
Works Program. The condition NULL refers to assets that do not have any condition data assigned
due to inconsistent asset data.


                    Roads - Length (km) of Network by Condition
 400

 350

 300

 250

 200

 150

 100

  50

   0
            1              2              3              4            5            NULL

                                     KM (Sealed)   KM (Gravel)

Figure 1: Condition by Number of Assets




Figure 2 identifies all road infrastructure assets other than the sealed and gravel road assets. The
graph highlights the volume of units for the signs and kerb & channel asset classes and highlights
the majority of signs assets at condition 4. This condition is based on the anticipated remaining life
of the sign assets and does not reflect the physical condition of those assets. Undertaking physical
condition assessments of the assets represented in Figure 2 is required. Physical condition
knowledge will assist in developing a more realistic approach to developing renewal plans that are
prioritised and planned.


Asset Management Plan: Roads Infrastructure                                                   Page 11
Log in to download the original file

2018-12-11 S&O Agenda - Attachment 1 to Item 16 - Road Infrastructure Asset Management Plan(PDF, 5MB).pdf · 4.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.