2018-12-11 S&O Agenda - Attachment 1 to Item 16 - Road Infrastructure Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Other Infrastructure - N° Assets by Condition
12000
10000
8000
6000
4000
2000
0
1 2 3 4 5 NA
Figure 2: Condition of Other Infrastructure by Number of Assets
Figure 3 has been produced to exclude signs and the kerb & channel assets to better identify the
condition of the remaining asset classes. The graph below highlights roadside barriers, carparks and
bus stops that have assets nearing the end of their useful lives and reflected as conditions 4 and 5.
This information is utilised in determining priority on when asset classes are undertaking physical
condition assessments across all the road infrastructure assets.
Other Infrastructure - N° Assets by Condition
(excl. Signage & K+C)
1200
1000
800
600
400
200
0
1 2 3 4 5 NA
Figure 3: Condition of other infrastructure (excluding Roads, Signs and Kerb & Channel) by Number of Assets
The breakdown of replacement costs by asset condition is depicted in the graphs below (figures 4 &
5). The importance of these graphs are to identify the value of each asset classes’ condition and
where future investments are required to renew or rehabilitate the road infrastructure assets. The
Asset Management Plan: Roads Infrastructure Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.