Log in to see the plans as drawn4.5 Asset Renewals The purpose of developing a renewal plan is to identify assets that need to be replaced to maintain the current level of service. Asset failure due to lack of renewal will affect the capacity to deliver future renewals of road infrastructure and subsequently the service road infrastructure provides to the Noosa Community. The safety and condition of infrastructure on Council’s road network is critical to the linkage of Noosa’s communities. The trunk road network in the coastal area is sensitive at peak periods and the failure or part closure of any of those roads will result in significant delays and congestion to motorists during peak traffic periods. Road infrastructure asset renewals are condition based. Condition assessments provide staff the ability to develop capital renewal programs. The ongoing asset management maturity and development of the condition assessments and subsequent maintenance and renewal plans relies heavily on the continued componentisation of all road infrastructure assets within the road corridor. Renewal expenditure is work which does not increase the road infrastructure design capacity but restores, rehabilitates, replaces or renews an existing asset to its original service capacity. Improved condition assessment data capture is currently being developed to include asset renewal considerations based on physical conditions and estimates of remaining useful life of assets to guide and improve renewal programs. Renewal plans are developed to maintain levels of service to ensure assets achieve their optimal useful life before they reach the asset condition range of 5. Staff continue to work through the various asset classes to develop renewal programs for the specific asset classes. In the absence of condition data, an age based approach to identify when Council’s road infrastructure will reach their useful life has been developed to determine an overall renewal plan. Priority is required across all the assets classes that have not had physical condition assessments to develop a suite of renewal programs. The graph below depicts the planned renewals by asset class over the next 10 years. There are major renewals identified in the year 2026 for road furniture assets, which is a direct relationship of when initial asset data was collected and the construction dates of the assets were estimated. It is expected that through physical condition assessments that spike in renewals will be better defined and spread over many years as the renewal program will be based on condition and not remaining useful life. As the road infrastructure assets age, continued condition assessments are required to monitor the assets and produce more defined renewal plans. The graph below enables Council to identify and plan for these significant renewal activities for the next 10 years. Asset Management Plan: Roads Infrastructure Page 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.