2018-12-11 S&O Agenda - Attachment 1 to Item 16 - Road Infrastructure Asset Management Plan

of 55

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                           Cumulative Maintenance, Renewal and Upgrade costs

2029

2028

2027

2026

2025

2024

2023

2022

2021

2020

2019

       $-             $50,000,000            $100,000,000          $150,000,000    $200,000,000          $250,000,000

            Sealed ( with Signs & Lines)          Road Furniture                  Landscaping / Mowing
            Gravel Rd (with signs & lines)        Car parks                       Renewal Total (Cumulative)
            Upgrade Total (Cumulative)


Figure 8: Road infrastructure 10-Year forecasted expenditures


Development of ongoing maintenance activities will ensure that future asset failure will be minimised
with a “no-surprises” approach for future funding forecasts. This will be supported through the initial
development of condition monitoring to predict potential maintenance and renewal requirements. In
compiling the current forecasts the following general assumptions have been identified.

•       Proposed Capital Renewal Program will be funded in accordance with the current Council
        model adopted;
•       Renewal works will be prioritised according to asset condition;
•       The condition of the assets reflect what is reported within this document;
•       Current maintenance funding levels will meet service level requirements;
•       Renewals, maintenance and isolated failure replacement is generally ‘like for like’;
•       Where a renewal must be provided to a higher standard, the difference in cost between a ‘like
        for like’ renewal and the higher standard is to be treated as an asset upgrade.
•       Depreciation is in accordance with Council Policy;
•       There is no allowance for CPI as the continuing revaluation and condition inspection process
        will make adjustments for current rates.




Asset Management Plan: Roads Infrastructure                                                                    Page 21
Log in to download the original file

2018-12-11 S&O Agenda - Attachment 1 to Item 16 - Road Infrastructure Asset Management Plan(PDF, 5MB).pdf · 4.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.