2018-12-11 S&O Agenda - Attachment 1 to Item 16 - Road Infrastructure Asset Management Plan

of 55

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 Scheduled work                    As identified from inspections (defects & proactive interventions) to
                                   maintain asset serviceability.

 Reactive work (customer          20 business days to completion
 requests)
 Signs maintenance
 (Provision and maintenance of signage within gravel road network)
 Cyclic Inspections xi            Hinterland Work Zones 1-6                6 monthly
                                  Coastal Work Zones 7-9                   3 monthly

 Scheduled work                    Hinterland Work Zones 1-6               6 monthly
                                   Coastal Work Zones 7-9                  3 monthly

 Reactive work (customer           20 business days to completion
 requests)
 Road verge maintenance
 (Verge slashing, vegetation height & width clearing to improve visibility etc.)
 Scheduled work                    Hinterland Work Zones 1-6               Six monthly
                                   Coastal Work Zones 7-9                  3 monthly

 Reactive work (customer           All maintenance requests             20 business days
 requests)                         Removal of dead animal               3 business days
 SERVICE DELIVERY MODEL
 The service is predominately delivered in-house with use of external contractors as required.

 KEY SERVICE METRICS
 Measure                                                  Metric                  Benchmark Comparison
 Cost per km for gravel road maintenance                  $6,685.69 per km        Queensland Department of
                                                                                  Local Government
 (FY2016/17 actuals $1,317,080 / 197 km)                                          Comparative Information
                                                                                  available
 Cost per rateable property to maintain gravel roads      $37.90 per rateable     Queensland Department of
                                                          property                Local Government
 (FY2016/17 actuals $1,317,080 / 30,000 rateable                                  Comparative Information
 properties)                                                                      available
 PERFORMANCE MEASURE
 Service                Indicator      Performance Measure                   Methodology
 Road network –         Satisfaction   Noosa community                       Community satisfaction mean
 Gravel Roads                          satisfaction mean rating              performance rating from the
                                       score compared to the State           2017 LGAQ Community
                                       mean rating score (out of             Satisfaction Tracking Survey for
                                       optimum rating of 5).                 Provincial areas for:

                                          NSC mean         State mean        Theme: Basic Services &
                                          rating (2017)    rating (2017)     Infrastructure
                                                                             Function: Road Maintenance
                                          3.43             3.28




Asset Management Plan: Roads Infrastructure                                                            Page 28
Log in to download the original file

2018-12-11 S&O Agenda - Attachment 1 to Item 16 - Road Infrastructure Asset Management Plan(PDF, 5MB).pdf · 4.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.