Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2018-12-11 S&O Agenda - Attachment 1 to Item 16 - Road Infrastructure Asset Management Plan

of 55

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 Cost per rateable property for operating costs             $3.85 per      Queensland Department of Local
 associated with public transport infrastructure &          annum / per    Government comparative data not
 programs supporting public transport (methodology          rateable       available.
 below)                                                     property
                                                                           Difficult to benchmark with
 Total of:                                                                 comparative local governments (Cat
     a) Actuals FY2016/17 $44,153 - operating costs                        3) due to variations in the type of
          to maintain public transport infrastructure                      services provided.
          (excluding capital works); plus
     b) Actuals FY2016/17 $71,129 - cost of levy
          funded activities (cabs only as the other
          activities are traffic congestion/reduction
          related i.e. excluding free holiday bus and the
          walk-and-ride program).

 Divided by 30,000 rateable properties.
 PERFORMANCE MEASURE
 Service              Indicator         Performance Measure                Methodology
 Public transport     Satisfaction      Noosa community satisfaction       Community satisfaction mean
 infrastructure                         mean rating score compared to      performance rating from the LGAQ
                                        the State mean rating score        2017 Community Satisfaction
                                        (out of optimum rating of 5).      Tracking Survey for Provincial areas
                                                                           for:
                                         NSC mean rating      State mean
                                         (2017                rating       Theme: Basic Services &
                                                              (2017)       Infrastructure
                                                                           Function: Public Transport
                                         3.07                 3.03




Asset Management Plan: Roads Infrastructure                                                         Page 39
Log in to download the original file

2018-12-11 S&O Agenda - Attachment 1 to Item 16 - Road Infrastructure Asset Management Plan(PDF, 5MB).pdf · 4.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.