Approved Decision Notice - DBW25 0144 & OPW25 0188 (As Published)
DEVELOPMENT PERMIT FOR OPERATIONAL WORKS – ENGINEERING WORKS (VEHICLE
CROSSOVER) AND LANDSCAPING WORKS - OPW25/0188
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
the use of the building commencing, and then compliance maintained at all times while the
use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
OPW-C-00300 A Development Site Plan Prepared by Infinity 17/09/2025
Currency Period
3. The Currency Period for this development approval lapses if the development has not
substantially started by 28 January 2028 unless an application to extend the currency period
is approved by Council.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
4. Copies of the approved plans, duly signed by the consultant Registered Professional
Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer
Construction at the “prestart” meeting.
5. A condition report including photographs of the frontage of the site must be completed and
submitted to council at the prestart meeting / prior to any works commencing.
6. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council prior to the prestart meeting.
7. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
(a) Civil engineering works;
(b) Landscape works;
(c) Other relevant parties
8. A Construction Management Plan must be submitted prior to the prestart meeting and must
address the following:
(a) Traffic management during all phases of construction;
(b) Adequate parking arrangements for works and deliveries;
(c) appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
Devices (MUTCD); and
(d) provision for safe vehicle and pedestrian access across the frontage of the site both
during daily construction and after daily construction has ceased.
9. Any changes to the details associated with the supervising RPEQ or Principal Contractor
during construction, must be notified to council in writing within five business days of the
change occurring.
10. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
Page 4 of 11
Document Set ID: 24502101
Version: 3, Version Date: 29/01/2026