Approved Decision Notice - DBW25 0144 & OPW25 0188 (As Published)

of 11

Page text shows just the words. Original shows the document exactly as it was published.

               DURING CONSTRUCTION
                      Engineering
               11.    The developer must meet any costs to repair damage to any Council asset during
                      construction, where damage is a result of the development works. Damage to assets must
                      be repaired immediately where it creates a hazard to the community. In circumstances where
                      the damage does not create a hazard to the community, it must be repaired immediately on
                      completion of the works associated with the development.
               12.    All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
                      who is independent of the Developer and Principal Contractor, and they must certify that all
                      works conform to the Operational Works permit. Where municipal works are involved, such
                      confirmation must be submitted for the respective hold points prior to any site inspection by
                      Council Officers.
               13.    All works must be constructed and work procedure undertaken in accordance with:
                      (a)     The approved plans/documents and conditions detailed in this Decision Notice;
                      (b)     All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines; and
                      (c)     The latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site.
                      Works within Road Reserve/Reinstatement
               14.    Safe vehicle and pedestrian access on all streets in the vicinity of the development must be
                      maintained at all times. Should road closures be necessary to carry out construction works,
                      Council’s Engineering Officer must be notified prior to the proposed closure and all
                      requirements complied with.
               15.    All frontage works must match neatly with existing road and verge features. Additional works
                      beyond the frontage may be required to provide an acceptable transition to existing road and
                      verge profiles.
                      Site Access and Driveways
               16.    Driveway crossovers must be constructed in accordance with council’s Standard Drawing
                      RS-056.
               17.    Any existing unnecessary or redundant property accesses must be removed, and the kerb,
                      footpath and verge area reinstated to match the existing footpath and/or verge treatments.
                      Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed
                      or turf, and must be maintained by the developer until established.
               18.    The following must be complied with during the construction of the required
                      crossover/driveway:
                      (a)     The driveway surfacing must consist of an approved all-weather material;
                      (b)     The driveway must be constructed so as not to concentrate stormwater runoff onto
                              neighbouring properties;
                      (c)     The property access must be located a minimum of 1m clear of existing power poles,
                              streetlights or other signage. The developer is responsible for any necessary relocation
                              of existing services to provide this clearance and must contact the relevant service
                              authorities and comply with their requirements in relation to these works.
                      Stormwater Drainage
               19.    Appropriate scour protection must be provided at the outlet of all stormwater pipes including
                      temporary outlets.
               20.    Works associated with this permit must not adversely impact on the existing drainage
                      conditions on other properties (e.g., by blocking or interfering with natural overland flows).


                                                                                                        Page 5 of 11
Document Set ID: 24502101
Version: 3, Version Date: 29/01/2026
Log in to download the original file

Approved Decision Notice - DBW25 0144 & OPW25 0188 (As Published).pdf · 173 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.