Original source · versioned page text
2015-03-03 Planning & Organisation Agenda
The original of this document is very large (18.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 3 MARCH 2015 RECOMMENDATION That Council note the report by the Development Planner to the Planning & Organisation Committee Meeting dated 3 March 2015 regarding Application No. MCU14/0084 for a Development Permit for Detached House situated at 71 Seaview Terrace, Sunshine Beach and approve the application in accordance with the following conditions: PLANNING When Conditions must be Complied With 1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans 2. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan, prepared by Date SK 02.02 P1 Survey Plan, prepared by NRA 23.10.2014 SK 03.01 P1 Level 1 Floor Plan, prepared by NRA 23.10.2014 SK 03.02 P1 Level 2, prepared by NRA 07.10.2014 SK 03.03 P1 Level 3 Floor Plan, prepared by NRA 23.10.2014 SK 05.01 P1 Section 1, prepared by NRA 07.10.2014 SK 05.02 P1 Section 2, prepared by NRA 07.10.2014 SK 05.03 P1 Section 3, prepared by NRA 07.10.2014 SK 05.06 P1 3D Views, prepared by NRA 07.10.2014 Building Height 3. The maximum height of the development must not exceed 8 metres above the finished ground level and the natural ground surface and 2 storeys. 4. Certification must be submitted to Council from a Licensed Surveyor which certifies that the building does not exceed the maximum height requirement of this Decision Notice. Performance Bond 5. Security in the form of a cash bond or trading bank guarantee to the sum of $40,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Operational Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Built Form 6. The proposal must incorporate a green roof as indicated on the approved plans. Page 20 of 147
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.