Skip to the record
Accept no imitations.

Original source · versioned page text

2015-03-03 Planning & Organisation Agenda

of 147

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  3 MARCH 2015


      Setbacks
7.    Earth mounding for the green roof must not exceed 1m above the natural ground level
      within the southern boundary setback area.
8.    The combined height of the block wall and the beam on top of the contiguous piles
      along the western boundary must not exceed 1m above the natural ground level.
9.    The building must be setback 6m from the southern boundary, except for construction
      elements such as contiguous piling and the ‘dry zone’ which must be setback a
      minimum of 1.5m at the light court. The contiguous piling and the ‘dry zone’ to the east
      and west of the light court must be setback in accordance with the approved plans.
      Landscaping
10.   All landscaping works must be undertaken in accordance with an Operational Works
      approval and Planning Scheme Policy PSP3 Landscaping Plants and Guidelines. A
      landscape plan prepared by a suitably qualified person must be submitted and include
      in particular:
      a.   further detail on the ‘green roof’ specific for the development
      b.   area of the roof that is proposed ‘green’ and areas that are proposed off form
           concrete
      c.   species list and density of plantings
      d.   incorporation of screening plants along the southern boundary adjacent to the
           light court and stairs
11.   Existing trees on site must be retained, except where required to be removed to
      accommodate the approved dwelling. In this regard, the removal of vegetation must
      not extend beyond 3m of the building footprint.
12.   No clearing is permitted within the Open Space Conservation zone.
13.   All trees being retained and the Open Space Conservation zone must be protected
      from clearing or construction activities by:
      a.   clearly delineating the Open Space Conservation zone boundary with protective
           fencing
      b.   clearly marking vegetation to be retained with flagging tape
      c.   installing protective fencing around the drip line of the vegetation
      d.   restricting stockpiling, storage and vehicle parking to those areas which are
           already cleared
      e.   using low impact construction techniques around vegetation.
      Coastal Protection
14.   External colours and finishes of the building must comprise muted/environmental tones
      that blend with the natural environment.
      Vehicle Access
15.   The construction and associated activities (deliveries, parking, etc.) must not impede
      the legal use of the access handle by any benefitted property or person.




                                                                                  Page 21 of 147
Log in to download the original file

2015-03-03 Planning & Organisation Agenda(PDF, 17MB).pdf · 18.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.