Original source · versioned page text
2015-03-03 Planning & Organisation Agenda
The original of this document is very large (18.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 3 MARCH 2015
c. stormwater outlets must not have potential to create concentrated flow paths or
generate flows sufficient to erode or scour the loose surface sands
d. all stormwater outlet locations must include energy dissipaters designed in
accordance with QDUM in conjunction with level spreaders constructed parallel
to the contour to facilitate dispersed sheet to disperse flows across the site to
pre development velocities in a Q2 (0.393AEP), Q5 (0.181AEP), Q10
(0.095AEP), Q50 (0.020AEP) and Q100 (0.010AEP) rainfall event at the location
where waters discharge from the level spreaders
e. include detail design which demonstrates that drain outlets do not have any
realistic potential to create concentrated flow paths or generate flows sufficient to
erode or scour the loose surface sands
f. stormwater infiltration pits are prohibited
g. excavation/filling for stormwater infrastructure within the Open Space
Conservation zone must:
(i) be undertaken by hand and not by mechanical means
(ii) be aligned and located to avoid disturbance to existing vegetation
(iii) the exact alignment of infrastructure must be determined onsite with a
Council delegate
h. include Erosion and Sediment Control measures in accordance with industry
best practice (IECCA and the Manual for Erosion and Sediment Control Volume
1.2 by Sunshine Coast Regional Council) to demonstrate that erosion is unlikely
to occur during the construction phase of the development
29. Until such time all construction, landscaping and building works are complete and the
site is effectively stabilised, construction and vegetation clearing activities must be
managed such that appropriate emergency stabilization measures are retained on the
site and implemented prior to rainfall to prevent erosion.
30. Pool water overflow must be discharged to sewer.
31. All site fencing must be installed and maintained to facilitate natural overland flows.
Fencing must not cause collection and concentration of stormwater flows.
General
32. Any damage caused to any public utility during the course of construction must be
repaired to council’s standards and at no cost to Council.
33. Any alteration of any public utility or other facilities necessitated by the development of
the land or associated construction works external to the site must be at no cost to
Council.
34. The transportation of all materials to and from the site must be undertaken in a manner
such that no particle matter escapes onto a public road. All vehicles carrying materials
either to or from the site must be covered to prevent materials including dust being
windblown from the vehicle.
Advisory Notes
Building and Construction Industry (Portable Long Service Leave) Levy
1. The QLeave levy must be paid prior to the issue of a development permit where it is
required. Council will not be able to issue a Decision Notice without receipt of details
that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212
6855.
Page 24 of 147
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.