Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2015-03-03 Planning & Organisation Agenda

of 147

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  3 MARCH 2015


      Co-ordination of Operational Works Assessment
2.    Additional application fees apply to Operational Work applications where the different
      aspects of the works are lodged separately. Significant savings in application fees will
      result if all works are lodged in a single application.
      Qualified Person
3.    For the purpose of preparing a Geotechnical Report, and for certifying geotechnical
      stability for the development, a qualified person is considered to be a person who:
      (a) is a Registered Professional Engineer of Queensland (RPEQ); and
      (b) has a degree in civil engineering or engineering geology; and
      (c) has a minimum of 5 years experience in the field of geotechnical engineering or
             engineering geology.

REPORT
1.    PROPOSAL
The proposal is for a Development Permit for a Material Change of Use – Detached House.
The 2 storey 1361m² dwelling is triangular in shape and consists of a curved ‘green roof’ and
3 levels. Level 1 includes a games room, cinema, gym, steam room, sauna,
treatment/relaxation room and an outdoor entertainment area overlooking a pool and
Jacuzzi. Level 2 consists of the kitchen, living, media room and seven bedrooms all with an
ensuite. Level 3 comprises vehicular access, 6 vehicle accommodation, office, entry and a
bedroom. The applicant has provided a Stormwater Management Report, Landscaping
Report for the Green Roof, Structural Report, Geotechnical Report and a Preliminary
Construction Management Plan addressing carparking onsite during construction. The
application is before Council as the site is a prominent location. Figure 1 below shows the
proposal inserted into a photo.




Figure 1 – Photo insert of the proposal



                                                                                  Page 25 of 147
Log in to download the original file

2015-03-03 Planning & Organisation Agenda(PDF, 17MB).pdf · 18.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.