NOOSA COUNCIL 10 YEAR CAPITAL PROGRAM
Sum of Project Total
2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029 Grand Total
Asset Management
Renewal Shire Bridge Annual Level 3 Inspections $ 110,000 $ 110,000 $ 110,000 $ 110,000 $ 110,000 $ 110,000 $ 110,000 $ 110,000 $ 110,000 $ 110,000 $ 1,100,000
Shire CCTV Drainage program $ 300,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 1,650,000
Shire Pavement Management System Road Surface Condition Modelling $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 250,000
Shire Road Infrastructure Asset Data Management & Condition Program $ 350,000 $ 300,000 $ 200,000 $ 180,000 $ 150,000 $ 1,180,000
Zero Emissions Noosa Project Implementation $ 380,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 3,880,000
Upgrade Asset Management Systems Implementation $ 250,000 $ 200,000 $ 200,000 $ 650,000
Asset Management Total $ 1,390,000 $ 1,260,000 $ 1,160,000 $ 940,000 $ 910,000 $ 810,000 $ 810,000 $ 810,000 $ 310,000 $ 310,000 $ 8,710,000
Bridges
Expansion Tewantin Heritage Park Construction of Timber Footbridge $ 55,000 $ 55,000
Renewal Cooran Tablelands Road B Bridge Renewal $ 100,000 $ 695,480 $ 159,096 $ 954,576
Cooroy Gumtree Drive Pedestrian Bridge Construction $ 130,000 $ 130,000
Kin Kin Wahpunga Lane Bridge Renewal $ 200,000 $ 1,072,768 $ 254,554 $ 1,527,322
Noosa Heads Garth Proud Bridge Renewal $ 769,000 $ 1,243,000 $ 2,012,000
Noosa Heads Weyba Road Pedestrian Bridge Rehab $ 154,000 $ 154,000
Noosa Heads Witta Circle Bridge Renewal $ 113,000 $ 775,000 $ 888,000
Noosaville Alec Loveday Park Pedestrian Bridge $ 35,000 $ 35,000
Noosaville Chaplin Park Pedestrian Bridge Rehabilitation (Humpty Do Bridge) $ 242,000 $ 500,000 $ 742,000
Shire Bridge Renewal Program $ 1,800,000 $ 3,600,000 $ 1,800,000 $ 1,800,000 $ 1,800,000 $ 1,800,000 $ 12,600,000
Sunrise Beach Orealla Bridge Renewal $ 1,765,000 $ 1,765,000
Tewantin Doonella Bridge Renewal $ 282,000 $ 1,568,000 $ 1,850,000
Tewantin Parklands Heritage Park Footbridge Renewal $ 35,000 $ 35,000
Bridges Total $ 2,501,000 $ 3,798,248 $ 1,217,650 $ 1,356,000 $ 2,575,000 $ 3,600,000 $ 2,300,000 $ 1,800,000 $ 1,800,000 $ 1,800,000 $ 22,747,898
Car Parks
Renewal Shire Car Park Renewals $ 150,000 $ 450,000 $ 450,000 $ 450,000 $ 1,350,000 $ 900,000 $ 900,000 $ 900,000 $ 900,000 $ 6,450,000
Upgrade Cooroy Maple Street, Railway Lane Road $ 80,000 $ 150,000 $ 230,000
Tinbeerwah Community Hall Car Park Sealing and drainage $ 175,000 $ 175,000
Car Parks Total $ 150,000 $ 625,000 $ 450,000 $ 450,000 $ 1,350,000 $ 900,000 $ 900,000 $ 980,000 $ 1,050,000 $ 6,855,000
Cemeteries
Expansion Cooroy Cemetery Concrete Beam $ 7,000 $ 7,000
Tewantin Cemetery Concrete Beam $ 7,000 $ 7,000
New Cooroy Cemetery Plant & Equipment Shed $ 60,000 $ 60,000
Renewal Cemetery Renewal Program $ 40,000 $ 40,000 $ 40,000 $ 40,000 $ 40,000 $ 40,000 $ 40,000 $ 280,000
Upgrade Cooroy Cemetery New Driveway $ 15,000 $ 15,000
Cooroy Cemetery New Shelter & Entry $ 25,000 $ 25,000
Tewantin Cemetery Expansion to Memorial Bush garden $ 30,000 $ 30,000
Tewantin Cemetery Kerb Edging to Cemetery Garden $ 45,000 $ 45,000
Cemeteries Total $ 60,000 $ 52,000 $ 77,000 $ 40,000 $ 40,000 $ 40,000 $ 40,000 $ 40,000 $ 40,000 $ 40,000 $ 469,000
Coastal Canals and Waterways
New Noosa Heads Main Beach Removable Sand Break Seating Structure $ 40,000 $ 40,000
Renewal Noosa Heads Main Beach Sand Recycling System Pipework Renewal $ 50,000 $ 100,000 $ 50,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 600,000
Noosaville Gympie Terrace Revetment Wall Renewal (O-Boats) $ 175,000 $ 175,000
Noosaville Noosa Waters Lock & Weir Annual Renewal Program $ 30,000 $ 30,000 $ 60,000 $ 161,000 $ 24,000 $ 305,000
Peregian Beach Boardwalk Renewal North of Tower to Access 57 $ 415,000 $ 415,000
Shire Beach Access Renewal Program $ 300,000 $ 300,000 $ 250,000 $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 2,350,000
Sunshine Beach - Beach Access 31 Renewal $ 250,000 $ 250,000
Upgrade Noosa Heads Main Beach Shower & Rock Wall Seating $ 80,000 $ 80,000
Coastal Canals and Waterways Total $ 415,000 $ 625,000 $ 430,000 $ 410,000 $ 511,000 $ 424,000 $ 400,000 $ 300,000 $ 400,000 $ 300,000 $ 4,215,000
Commercial Land & Property
New Peregian Beach 5 Rufous St Redevelopment Stage 3 Construction (Community Centre, Park) $ 3,420,000 $ 1,200,000 $ 4,620,000
Renewal Shire Commercial Properties Annual Renewal Program $ 150,000 $ 150,000 $ 150,000 $ 300,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 1,350,000
Commercial Land & Property Total $ 3,420,000 $ 1,200,000 $ 150,000 $ 150,000 $ 150,000 $ 300,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 5,970,000
Community Facilities
Expansion Sunshine Beach NAC - 25m Pool Shade Structure $ 50,000 $ 50,000
Renewal Noosa Heads The J Deck Refurbishment $ 250,000 $ 250,000
Noosaville Noosa Leisure Centre Master Plan Stage 1 Upgrade to Facilities LGIP $ 382,700 $ 382,700
Noosaville Wallace House Restumping $ 85,000 $ 85,000
Shire Community Centres and Halls Annual Renewal Program $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
Shire Lifeguard Towers Annual Rehabilitation Program $ 25,000 $ 25,000
Sunshine Beach NAC - 25m AMP Pool Renewal Program $ 25,000 $ 150,000 $ 2,000 $ 2,050 $ 31,000 $ 210,050
Sunshine Beach NAC - 50m AMP Pool Renewal Program $ 260,000 $ 6,000 $ 29,000 $ 50,000 $ 4,000 $ 7,700 $ 356,700
Sunshine Beach NAC - LTS AMP Pool Renewal Program $ 40,000 $ 4,000 $ 7,000 $ 20,000 $ 52,500 $ 46,000 $ 700 $ 170,200
Sunshine Beach NAC - Other AMP Infrastructure Renewal Program $ 310,000 $ 120,000 $ 430,000
Sunshine Beach NAC - Regrout / Recaulk and Replace Tiles (50m Pool) $ 65,000 $ 65,000
Sunshine Beach NAC - Roof Replacement $ 232,500 $ 232,500
Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.