NOOSA COUNCIL 10 YEAR CAPITAL PROGRAM
2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029 Grand Total
Expansion Pomona School Road Pathway Linkage Planning and Construction $ 80,000 $ 80,000
Shire Pathway (Non-Trunk) Linkage Planning and Construction $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 4,500,000
Tewantin Butler Street & Crank St Footpath & Pedestrian Refuge - Design $ 100,000 $ 100,000
Tewantin Furness Drive Bus Stop Pathway DDA Access $ 25,000 $ 25,000
Tewantin Goodchap St Pathway Linkage Planning and Construction $ 25,000 $ 25,000
Tewantin Griffith Ave & Golf Course Drive Pathways $ 270,000 $ 270,000
Renewal Peregian Beach Plover Street Pathway Renewal $ 60,000 $ 60,000
Shire Pathway Renewal Program $ 100,000 $ 180,000 $ 250,000 $ 180,000 $ 180,000 $ 180,000 $ 180,000 $ 180,000 $ 180,000 $ 180,000 $ 1,790,000
Sunshine Beach Belmore Terrace Pathway Renewal $ 100,000 $ 100,000
Upgrade Cooroibah Lake Cooroibah Road Pathway Connection from McKinnon Dr to Lake Cooroibah $ 715,000 $ 715,000
Cooroy Lake Macdonald Dr Pathway Connection to Botanic Gardens to Town Centre $ 877,500 $ 877,500
Cooroy Myall St Pathway Ferrells to Town Widen Replace (1035m) $ 336,375 $ 336,375
Cooroy Swift Dr connection to Town Centre Cooroy Noosa Road Service Road to Olivine St $ 25,000 $ 25,000
Cooroy Swift Dr Pathway Lake Mac Dr to Gumtree Dr $ 292,500 $ 292,500
Noosa Heads Main Beach Boardwalk LED Lighting Renewal $ 120,000 $ 120,000
Noosa Heads Noosa Parade Pathway Upgrade (Munna Point Bridge to Noosa Drive) $ 556,000 $ 556,000
Noosa Heads Precinct West End of Sofitel Boardwalk Design & Construction $ 105,000 $ 105,000
Noosa Heads Sunshine Beach Road Pathway Lighting Upgrade (Transit Centre to Bicentennial Drive) $ 100,000 $ 100,000
Noosaville Hoffman Dr Connection of Missing Link $ 27,245 $ 27,245
Noosaville Off Road Trunk Connect Venture Dr Through Reserve to Lane $ 80,000 $ 80,000
Noosaville Rene St Connection of Missing Link $ 67,600 $ 67,600
Noosaville Sea Eagle Drive & Shire Drive Pathway Upgrades $ 174,000 $ 174,000
Noosaville Seacove Court Walter Hay Dr Connection of Missing Link $ 56,875 $ 56,875
Outlook Off Road Trunk Extend Existing Pathway From Behind Hooper Cres $ 320,000 $ 320,000
Peregian Beach David Low Way Pathway Service Road to Lane Beside No. 245 (275m) $ 89,375 $ 89,375
Peregian Beach Driftwood Dr Pathway David Low Way to Wavecrest Dr $ 22,750 $ 22,750
Pomona Pathways and Pedestrian Construction Stage 1 $ 150,000 $ 150,000
Shire Pathways & Boardwalks Trunk Network Upgrade - LGIP $ 435,000 $ 493,000 $ 909,000 $ 1,837,000
Sunrise Beach Heathland Dr David Low Way & Edward St Missing link and connections $ 543,012 $ 543,012
Sunrise Beach off road trunk Pathway – Burgess Ck Pathway extended to Wallum Lane 2100m $ 477,750 $ 477,750
Sunrise Beach Wollomia Way Pathway Orient Dr to Dame Patie Dr $ 251,875 $ 251,875
Sunshine Beach Henderson Street (Opposite Pat Mullins Park) Pedestrian Refuge $ 30,000 $ 30,000
Sunshine Beach Hill St Pathway Upgrade $ 132,000 $ 132,000
Sunshine Beach Pacific Avenue Pathway Edward St to Hill St $ 221,000 $ 221,000
Tewantin Beckmans Road connection of Missing Link Noosaville State School to Cooroy Noosa Road $ 812,500 $ 812,500
Tewantin Furness Dr Tewantin Blackheath Dr to St Andrews Dr $ 149,500 $ 149,500
Tewantin Hilton Terrace Connection of Missing Link from Hilton Terrace and Ernest St $ 274,000 $ 274,000
Tewantin Moorindil St Pathway Poinciana Ave to Toolar St (77m) $ 25,000 $ 25,000
Tewantin Moorindil St Pathway Toolar St to Bus Turnaround West Side $ 397,150 $ 397,150
Tewantin Poinciana Ave Pathway Upgrade $ 45,000 $ 45,000
Tewantin, Hilton Terrace CNLGGP Shared Pathway $ 180,000 $ 180,000
Pathways & Boardwalks Total $ 274,000 $ 1,750,000 $ 2,111,000 $ 2,553,000 $ 1,437,750 $ 854,500 $ 1,566,525 $ 1,725,470 $ 2,664,387 $ 1,614,375 $ 16,551,007
Planning Scheme
Expansion Shire Project Team Resources for New Planning Scheme $ 450,000 $ 450,000
Upgrade Climate Change Adaptation Plan Develoment and Implementation $ 50,000 $ 50,000
Shire Project Place Based Approach - Placemaking Pilot Program $ 100,000 $ 100,000
Planning Scheme Total $ 600,000 $ 600,000
Public Amenities
Renewal Peregian Beach Public Amenities Renewal Construction $ 577,000 $ 577,000
Shire - Public Amenities Renewal Program $ 500,000 $ 500,000 $ 500,000 $ 303,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 3,803,000
Upgrade Noosa Heads Lions Park Upgrade Public Amenities $ 500,000 $ 500,000
Noosa Woods Park Upgrade Public Amenities $ 207,000 $ 207,000
Stan Topper Park Public Amenties Upgrade $ 197,000 $ 197,000
Public Amenities Total $ 577,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 707,000 $ 500,000 $ 500,000 $ 500,000 $ 5,284,000
Public Transport Infrastructure
Renewal Shire Bus Shelter Disabled Compliant Program: Year 6 $ 500,000 $ 500,000
Upgrade Cooroy Pines Road / Cooroy Belli Creek Road School Bus Safety Improvements $ 52,000 $ 52,000
Public Transport Infrastructure Total $ 500,000 $ 52,000 $ 552,000
Sealed Roads Network
Renewal Black Mountain Road Priority Sections Road Reconstruction (Hinterland Priority) $ 1,290,000 $ 632,276 $ 1,922,276
Noosa Heads Arkana Drive Median Strip Stabilisation $ 60,000 $ 60,000
Shire Kerb & Channel Renewal Program $ 100,000 $ 100,000 $ 130,000 $ 130,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 1,060,000
Shire Reseal & Rehabilitation Renewal Program $ 3,600,000 $ 3,672,000 $ 3,745,440 $ 3,820,349 $ 3,896,756 $ 3,974,691 $ 4,054,185 $ 4,135,268 $ 4,217,974 $ 4,302,333 $ 39,418,996
Shire Sealed Road Network Reconstruction Priority (Design and Construction) $ 700,000 $ 700,000 $ 700,000 $ 700,000 $ 700,000 $ 700,000 $ 700,000 $ 700,000 $ 5,600,000
Upgrade Boreen Point Tewah St Gravel Road Seal $ 250,000 $ 250,000
Boreen Point, Hector Street Road widening and K&C $ 97,000 $ 97,000
Cooroy Mountain, Cooroy Mountain Road - Carriageway widening $ 185,000 $ 1,665,000 $ 1,850,000
Federal Middle Creek Road Reconstruction $ 1,832,276 $ 1,832,276
Page 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.