NOOSA COUNCIL 10 YEAR CAPITAL PROGRAM
2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029 Grand Total
Upgrade Hinterland - Road Section Upgrades - Design and Construct $ 632,276 $ 632,276 $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 2,764,552
Pomona, Ambulance Street Sealing of Gravel Section $ 200,000 $ 200,000
Sealed Roads Network Total $ 5,537,000 $ 5,164,276 $ 5,892,716 $ 6,947,625 $ 5,329,032 $ 5,074,691 $ 5,154,185 $ 5,235,268 $ 5,317,974 $ 5,402,333 $ 55,055,100
Sports Ground and Facilities
Upgrade Chris Kenny Oval & Straker Park Upgrade Facilities & Field Resurfacing $ 952,200 $ 952,200
Cooroy Sports Complex Master Plan Implementation (Planning and Design) $ 50,000 $ 50,000
Kin Kin Sportsground Upgrade to Oval Facilities & Amenities $ 307,800 $ 307,800
Kin Kin Tennis Club Upgrade Facilities & Carparking $ 200,000 $ 200,000
Perigian Beach Sportsground Field Development & Upgrade to Facilities & Amenities $ 817,560 $ 817,560
Pomona Sports Park Amenities Development & Embellishment $ 2,577,600 $ 2,577,600
Read Park Upgrade to Facilities & Amenities Oval Resurfacing & Additional Cricket Net $ 461,640 $ 461,640
Sunshine Beach Precinct Plan - Upgrade to Facilities Ovals Entry and Formalise Carparking $ 368,690 $ 368,690
Sports Ground and Facilities Total $ 50,000 $ 952,200 $ 507,800 $ 1,186,250 $ 2,577,600 $ 461,640 $ 5,735,490
Stormwater Drainage
Expansion Noosaville Industrial Area Stormwater Quality Improvement Device $ 250,000 $ 250,000
Renewal Noosaville Gympie Terrace Stormwater Renewals $ 1,200,000 $ 1,200,000
Shire Bioretention Basin Renewals Program $ 80,000 $ 100,000 $ 180,000
Shire Bio-Retention Basin Renewals Program $ 150,000 $ 80,000 $ 230,000
Shire Pipe Re-lining / Rehabilitation Renewal Program $ 250,000 $ 150,000 $ 250,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 1,850,000
Shire Pit Structure Renewal Program $ 150,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 1,050,000
Upgrade Noosa Heads Cooyar St (Elanora Terrace to Safari St) Bio-Retention Basin $ 193,381 $ 193,381
Noosa Heads Cooyar St (Opposite Wyandra) Upgrade Bio-Retention System $ 500,000 $ 500,000
Noosaville Lake Entrance Blvd Flood Mitigation Stage 1 Planning & Design $ 80,000 $ 80,000
Noosaville Project Ave Stormwater Drainage Easement Upgrade $ 250,000 $ 250,000
Shire Stormwater Drainage Trunk Network Upgrade - LGIP $ 515,000 $ 307,000 $ 822,000
Sunrise Beach Ben Lexcen Dr & Grasstree Court Bio-Retention Basin $ 513,593 $ 513,593
Sunrise Beach Dame Patti Dr Stormwater Outlet Upgrade $ 106,149 $ 106,149
Stormwater Drainage Total $ 1,680,000 $ 450,000 $ 1,165,000 $ 737,000 $ 800,000 $ 493,381 $ 893,593 $ 406,149 $ 300,000 $ 300,000 $ 7,225,123
Streetscapes and Road Corridors
Renewal Shire Streetscapes Renewal Program $ 250,000 $ 2,500,000 $ 250,000 $ 500,000 $ 2,900,000 $ 1,000,000 $ 2,500,000 $ 9,900,000
Upgrade Noosa Heads Hastings Street LED Lighting Renewal $ 190,000 $ 190,000
Noosa Heads Noosa Parade Corridor Upgrade Construction $ 2,700,000 $ 2,700,000 $ 5,400,000
Peregian Beach Town Square Upgrade Construction $ 175,000 $ 175,000
Streetscapes and Road Corridors Total $ 175,000 $ 2,890,000 $ 2,950,000 $ 2,500,000 $ 250,000 $ 500,000 $ 2,900,000 $ 1,000,000 $ 2,500,000 $ 15,665,000
Transport and Infrastructure Management
Expansion Transport Strategy Implementation - Infrastructure Provision $ 600,000 $ 600,000 $ 600,000 $ 600,000 $ 2,400,000
Transport Strategy, Walking & Cycling Strategy and CNLG Grant Applications (2 Year Program) $ 650,000 $ 650,000
Renewal Noosa Heads Leslie Drive Koala Pole Renewals $ 14,000 $ 14,000
Noosaville Gympie Terrace Corridor Renewal Stage 2 $ 764,000 $ 764,000
Shire Forward Planning & Design Program Construction Ready Designs $ 350,000 $ 500,000 $ 300,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 4,650,000
Tewantin Hilton Terrace & Ernest St Intersection Upgrade Construction $ 1,800,000 $ 1,800,000
Upgrade Cooroy Hinterland Playground - Car Parking and Raised Pedestrian Crossing $ 400,000 $ 400,000
Noosa Heads Witta Circle Redirection to One Way Traffic $ 70,000 $ 70,000
Noosaville Eumundi Noosa Road / Eenie Creek Road Upgrade (Roundabout Capacity) $ 412,637 $ 412,637
Noosaville Gibson Road / Eumundi Noosa Road Upgrade Roundabout Capacity $ 105,595 $ 105,595
Noosaville Reef St / Mary St Upgrade Roundabout Capacity $ 386,521 $ 386,521
Peregian Beach David Low Way / Lowry St / Peregian Esplanade Upgrade 4 Way Intersection to Roundabout $ 520,210 $ 520,210
Peregian Beach Heron St / David Low Way Upgrade Roundabout Capacity $ 258,216 $ 258,216
Shire Road Directional Signage (incl Noosa Entrance signs & Noosa Country Run) $ 100,000 $ 100,000
Shire Road Directional Signage (Including Noosa Entrance signs & Noosa Country Run) $ 150,000 $ 250,000 $ 400,000
Sunshine Beach Ben Lexcen Dr / Eenie Creek Road Upgrade Signalised Intersection $ 2,590,871 $ 2,590,871
Transport and Infrastructure Management Total $ 3,578,000 $ 1,650,000 $ 1,220,000 $ 1,100,000 $ 1,358,216 $ 1,120,210 $ 3,995,624 $ 500,000 $ 500,000 $ 500,000 $ 15,522,050
Waste Management
New Noosaville Eumundi Road Landfill Cell 2.3 Construction $ 2,800,000 $ 2,800,000
Noosaville Eumundi Road Landfill Design Stormwater Controls for Cell 2.3 $ 220,000 $ 220,000
Renewal Pomona Waste Transfer Station Asphalt Resurfacing $ 125,422 $ 125,422
Waste Management Renewals $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 800,000
Upgrade Noosa Heads "The Woods" Bin Storage Enclosure $ 100,000 $ 100,000
Noosaville Eumundi Rd Landfill Outbound Weighbridge $ 550,000 $ 550,000
Noosaville Eumundi Rd Landfill Sealing of Staff Carpark $ 56,000 $ 56,000
Noosaville Eumundi Rd Transfer Station Sealing of Gravel Road $ 135,000 $ 135,000
Waste Management Total $ 455,000 $ 731,422 $ 2,900,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 4,786,422
Grand Total $ 28,398,905 $ 26,224,071 $ 25,318,430 $ 23,833,862 $ 21,698,513 $ 19,624,273 $ 21,055,135 $ 19,084,995 $ 19,508,030 $ 17,948,026 $ 222,694,240
Page 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.