Appendix A - Copy of Existing Approval · 132008.1128
Attached to the e-mail 132008.1128.01 Request to change and extend development approval - - Grasstree Court, Sunrise Beach.
132008.1128
64.2.5. Are provided with a free-draining outlet from the sub-soil drainage
system
65. All stormwater quality treatment devices must be maintained in accordance with a
Maintenance Manual prepared for the development by a qualified person and
submitted to Council prior to the issue of any Development Permit for Operational
Works. The Maintenance Manual must include:
65.1. A plan showing the location of the individual components of the system
65.2. Manufacturer's data and product information sheets for any proprietary
products
65.3. Location of inspection and monitoring points shown clearly on the plan
65.4. A schedule or timetable for the proposed regular inspection, maintenance
and monitoring of the devices.
Records of all maintenance activities undertaken must be kept and made available
to Council upon request.
66. Permanent educational signage must be erected to educate the residents of the
development about the function of the bioretention devices. The dimensions,
standard, presentation and location of the educational signage must be in accordance
with an Operational Works approval.
ENVIRONMENTAL HEALTH
Waste Management
67. The development must be provided with waste storage and disposal facilities in
accordance with Planning Scheme Policy No.9 "Waste Management Multi-Dwellings
and Commercial and Industrial Premises", including an external imperviously paved
area(s) correctly sized for the required number of refuse, recycling and commercial
waste containers and suitably screened from public places and neighbouring
properties. A bin wash area(s) is required with a cold-water tap, hose and drain outlet
connected to sewer, via a bucket trap. The drain outlet is to be designed to prevent
storm water entry to the sewerage system and this can be achieved with a nib wall
50mm high and up to 700mm x 700mm wide (max O.5m2), or alternatively the waste
area can be roofed, or any other design approved by Council's Environment &
Landscape Assessment Unit.
68. The layout, design and construction of the development shall be such that the largest
design refuse collection vehicle (RCV) required to service the site, is afforded easy,
safe and unobstructed access and manoeuvring whilst collection occurs. In particular,
the route taken by the RCV must allow for entry and exiting of the site in a forward
direction. Internal trafficable roads shall be designed to accommodate the swept path
of the largest design RCV.
69. On refuse collection day, the site management entity shall be responsible for the
placement of refuse bins at a location which affords easy, safe and unobstructed
access for the cleansing contractor.
PD·DA-F~58/5-02f04/2009 Page 12 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix A - Copy of Existing Approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.