Attached to the e-mail 132008.1128.01 Request to change and extend development approval - - Grasstree Court, Sunrise Beach.
132008.1128
DEVELOPMENT PERMIT CONDITIONS FOR RECONFIGURING A LOT (1 LOT INTO 2)
General
1. Development undertaken in accordance with this approval must generally comply with
the approved plans of development.
2. The development must be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the neighbourhood by reason of the creation of
excessive noise, lighting nuisance or other emissions.
Relevant Period
3. The relevant period is four (4) years from the day this permit takes effect and ends on
14 December 2015, during which time all conditions must have been complied with,
and the Plan of Survey lodged with Council for endorsement, unless an application to
extend the relevant period is approved by Council.
Nature Refuge Dedication
4. In accordance with former Noosa Shire Council resolution of its Ordinary Meeting of
29 March 2007, the balance undeveloped Open Space conservation portion of Lot 1
SP177650 must be gazetted a Nature Refuge under the Queensland Nature
Conservation Act. Evidence of the initiation of the gazellal process must be provided
to Council within 3 months of sealing of the plan of survey associated with this
approval.
Water & Sewage
5. Reticulated water must be provided to each lot in the development (excluding balance
Lot 1). This must include:
5.1. Works in accordance with the approved findings of the water supply network
analYSis by Worley Parsons, dated 30 July 2008.
5.2. Construction of a new 150mm diameter watermain to Unitywater standards
from the existing 200mm watermain in Ben Lexcen Drive to the existing
1OOmm diameter watermain in the Culdesac of Grasstree Court.
5.3. A water service and approved water meter for each lot in accordance with
Unitywater Standard Drawings SCW 350,355 and 360.
5.4. Water meters located on alternative boundaries to electrical pillars.
6. Reticulated sewerage must be provided to each lot in the development (excluding
balance Lot 1). This must include:
6.1. Creation of a new Lot for the existing Unitywater sewer pump station and
dedication of the lot in favour of Unitywater.
6.2. Layout of the pump station access and parking areas within the pump station
Lot in accordance with Unitywater standard drawing SCW 501 or agreed
alternative configuration to suit existing infrastructure layout.
7. A 3.0 metre wide easement must be provided over all Unitywater sewers located in
private property including the sewer rising main. A 4.0 metre wide easement must be
provided over Unitywater sewers greater than 3.0 metres deep. Easements must be
located centrally over the main.
PD-DA-FM58f5-02/04/2009 Page 15 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix A - Copy of Existing Approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.