Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Appendix A - Copy of Existing Approval · 132008.1128

Attached to the e-mail 132008.1128.01 Request to change and extend development approval - - Grasstree Court, Sunrise Beach.

of 31

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                              132008.1128
77.   Stormwater retention systems and gross pollutant traps must maintain a minimum
      clearance of 1.5 metres from Unitywater water supply and sewerage infrastructure.
78.   Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
      Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
      Landscaping plants within these clearances must be low growing when mature and
      suitable Unitywater approved varieties.
79.    Construction works undertaken in the vicinity of Unitywater water supply or sewerage
       infrastructure must not adversely affect the integrity of the infrastructure. All
       costs associated with repair, replacement or alteration of infrastructure must be
       met by the applicant.




PD-OA-FMS8IS-02l0412009                                                  Page 14 of 24

Used in these records

About this file

File size
2.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix A - Copy of Existing Approval.pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.