Council archive · source document
Appendix A - Copy of Existing Approval · 132008.1128
Attached to the e-mail 132008.1128.01 Request to change and extend development approval - - Grasstree Court, Sunrise Beach.
132008.1128
77. Stormwater retention systems and gross pollutant traps must maintain a minimum
clearance of 1.5 metres from Unitywater water supply and sewerage infrastructure.
78. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
Landscaping plants within these clearances must be low growing when mature and
suitable Unitywater approved varieties.
79. Construction works undertaken in the vicinity of Unitywater water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All
costs associated with repair, replacement or alteration of infrastructure must be
met by the applicant.
PD-OA-FMS8IS-02l0412009 Page 14 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix A - Copy of Existing Approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.