DF15035_Bell Allen_Change to Existing Approval Decision Notice_090916
Attached to the e-mail Change to approval and extension to the relevant period (1 of 2)MCU13/0247.02.
Officer: Glen Conforti
Direct Telephone: 07 53296241
Our Reference: GCONFORTI:MCU13/0247.01
Your Reference: 13075/16134ms.ms
2 June 2015
Bell-Allen Holdings Pty Ltd
C/- DFS Group
PO Box 605
MAROOCHYDORE QLD 4558
[email protected]
Dear Sir/Madam
Change to an Existing Approval
Sustainable Planning Act 2009
I refer to your request to make a permissible change to an existing approval. On 1 June 2015,
Council decided your requested changes.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: MCU13/0247.01
Street Address: 56 Seaview Tce SUNSHINE BEACH QLD 4567
Real Property Description: Lot 64 RP 81810
Planning Scheme: The Noosa Plan (16 September 2013)
2. DECISION DETAILS
Council on decided to issue the following type of approval:
• Development Permit for a Material Change of Use (Detached House)
In relation to the request to make a change to the existing approval, Council on 1 June 2015
decided to:
A. Approve a change to Condition 2
B. Include additional Conditions 16, 17, 18, 19 & 20
C. Delete Item 6 (Approved Plans) and renumber Items accordingly
3. RELEVANT PERIOD OF APPROVAL
The relevant period for this development approval is in accordance with that stated in the
Decision Notice dated 20 January 2014, unless an application to extend the period is
approved by Council under s 383 of the Sustainable Planning Act 2009.
PO Box 141 P. (07) 5329 6500 [email protected]
TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au
Document Set ID: 19916238
Version: 1, Version Date: 04/06/2015
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 6 pages
Page 2
MCU13/0247.01
4. CONSOLIDATED ASSESSMENT MANAGER CONDITIONS
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with
prior to the use commencing, and then compliance maintained at all times while the
use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with
the approved plans of development. The approved plans are listed in the following table
unless otherwise amended by these conditions.
Plan No. Rev. Plan Name Date
A-01 18 Proposed Ground Floor, prepared by Harry Poulos 04.05.15
Architects
A-02 14 Proposed 1st Floor Street Entry Level, prepared by Harry 05.05.15
Poulos Architects as annotated by Council
A-03 07 Proposed 1st Floor Plan, prepared by Harry Poulos 22.04.15
Architects
A-04 06 Proposed Roof & Site Plan, prepared by Harry Poulos (Rev. 05)
Architects as annotated by Council 29.03.15
A-05 08 Proposed Front Elevation, prepared by Harry Poulos 18.03.15
Architects
A-06 10 Proposed RHS (South) Elevation, prepared by Harry 05.05.15
Poulos Architects as annotated by Council
A-07 10 Proposed Rear (East) Elevation, prepared by Harry Poulos 05.05.15
Architects
A-08 11 Proposed LHS (North) Elevation, prepared by Harry 05.05.15
Poulos Architects
A-10 12 Section A-A, prepared by Harry Poulos Architects 04.05.15
A-11 14 Section B-B (NGL shown – 4m from LHS Boundary), 27.03.15
prepared by Harry Poulos Architects
Building Height
3. The maximum height of the development must not exceed 8 metres above the finished
ground level and the natural ground surface and 2 storeys.
4. Certification must be submitted to Council from a Licensed Surveyor which certifies
that the building does not exceed the maximum height requirement of this Decision
Notice.
Page 2 of 7
Document Set ID: 19916238
Version: 1, Version Date: 04/06/2015
Page 3
MCU13/0247.01
Performance Bond
5. Security in the form of a cash bond or trading bank guarantee to the sum of $5000
must be submitted to Council, to secure performance of all conditions of this
approval, prior to the issue of a Development Permit for Building Works. The cash
bond or trading bank guarantee will be returned on performance of the conditions of
approval less any costs incurred by Council in respect of enforcing performance of this
permit. Council reserves the right to call upon the bond or guaranteed sum to effect
compliance with conditions.
Landscaping
6. A minimum of 20% of the site must be retained as soft landscaping.
7. Existing trees on the site must be retained, except where required to be removed to
accommodate the approved dwelling. In this regard, the removal of vegetation must not
extend beyond 3 metres of the building footprint.
8. Trees to be retained must be protected from clearing or construction activities by:
(a) clearly marking vegetation to be retained with flagging tape
(b) installing protective fencing around the drip line of the vegetation
(c) restricting stockpiling, storage and vehicle parking to those areas high are
already cleared
(d) using low impact construction techniques around vegetation
Drainage and Earthworks
9. Fill material placed over services must not impose any additional surcharge loading on
the service.
10. Excavation must not be carried out within 600mm of any utility infrastructure (to top,
sides and base of services). A retaining wall must be provided to support the soil
surrounding utility infrastructure where proximate to excavation activities.
11. Compaction with a vibrating roller must not be carried out within 600mm of any utility
infrastructure.
Geotechnical Stability
12. All works must be carried out in accordance with the Geotechnical Investigation
prepared by Golder Associates listed within this Decision Notice.
Coastal Protection
13. Gates must not be installed along the rear property boundary to gain direct access to the
beachfront.
14. Landscaping consisting of native ground covers, shrubs and trees must be planted for a
width of 2m from the rear seaward boundary in accordance with Council’s Planning
Scheme Policy PSP3 Landscaping Plants and Guidelines.
15. External colours and finishes of the building must comprise of muted/environmental
tones that blend with the natural environment.
Page 3 of 7
Document Set ID: 19916238
Version: 1, Version Date: 04/06/2015
Page 4
MCU13/0247.01
ADDITIONAL CONDITIONS 1 JUNE 2015
Roof line
16. The roof must not extend seaward of a line drawn between the closest roof corner of the
adjoining properties to the north and south as annotated by Council on the approved
plan A-02 revision 14.
Privacy Screens
17. The privacy screens located on the 1 first floor seaward deck must not extend beyond
the roof line.
Clothes Drying Deck
18. The clothes-drying deck must be setback a minimum of 1m from the boundary. Design
options for clothes drying purposes such as external stairs, decks or the like exceeding
1m above the NGL must be setback a minimum of 1m.
19. Screening vegetation must be planted for the full length of the revised clothes drying
deck location/design and the boundary in accordance with Council’s Planning Scheme
Policy PSP3 Landscaping Plants and Guidelines. The planted vegetation must have a
minimum pot size of 200mm and consist of native, endemic species with a mature height
of not less than 4 metres. At maturity the landscaping must effectively screen the clothes
drying deck and associated structures from the neighbouring property.
Undercroft
20. The undercroft area must not consist of hard pavement or the like and remain at natural
ground level.
5. REFERRAL AGENCY CONDITIONS
Not Applicable
6. REFERENCED DOCUMENT
Document No. Rev. Document Name Date
137632184-001-R- 0 Geotechnical Investigation, prepared by Golder January 2013
Associates
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:
Equitable Access and Facilities
The plans for the proposed building work have NOT been assessed for compliance with the
requirements of the Building Code of Australia – Part D3 as they relate to people with
disabilities. Your attention is also directed to the fact that in addition to the requirements of the
Building Code of Australia – Part D3 as they relate to people with disabilities, one or both of
the following may impact on the proposed building work:
(a) The Disability Discrimination Act 1992 (Commonwealth)
(b) Anti-Discrimination Act 1991 (Queensland)
Page 4 of 7
Document Set ID: 19916238
Version: 1, Version Date: 04/06/2015
Page 5
MCU13/0247.01
Council recommends that the following matters be considered to address equitable access
and facilities in the building:
(a) The building and environs should be designed to meet the requirements of the Human
Rights and Equal Opportunity Commission “Advisory Notes on Access to Premises”
and AS 1428.2
(b) Applicants should be aware that a “Disability Standard on Access to premises” is
currently being developed and most likely will impose changes on the Building Code of
Australia
(c) Any services and facilities in the building complex should allow independent, dignified
and equitable use of the services and facilities for all people.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
carries out an activity must take all reasonable and practicable measures to ensure the activity
does not harm Aboriginal cultural heritage.” It is an offence to fail to comply with the duty of
care. Substantial monetary penalties may apply to individuals or corporations breaching this
duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the
Minister administering the Act can also issue stop orders for an activity that is harming or is
likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural
heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to discuss any
obligations under the ACH Act.
8. PROPERTY NOTES
Not Applicable
9. PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME
Not Applicable
10. FURTHER DEVELOPMENT PERMITS REQUIRED
• Development Permit for Building Work (All Building Works)
11. SELF ASSESSABLE CODES
The following codes for self-assessable development related to the development approval
issued under this Decision Notice must be complied with.
• Detached House Driveways Code
12. SUBMISSIONS
Not Applicable
13. REASONS / GROUNDS FOR APPOVAL
Not Applicable
Page 5 of 7
Document Set ID: 19916238
Version: 1, Version Date: 04/06/2015
Page 6
MCU13/0247.01
14. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from
the Sustainable Planning Act 2009 is attached.
15. OTHER DETAILS
If you wish to obtain more information about Council’s decision, electronic copies of which are
available on line at www.noosa.qld.gov.au, or at Council offices.
DECISION NOTICE HISTORY
Original Decision Notice (20 January 2014)
Changes to an Existing Approval (1 June 2015),
Yours faithfully
GLEN CONFORTI
DEVELOPMENT PLANNER
Encl. Approved Plans/Documents
Appeal Rights
cc Unitywater
Page 6 of 7
Document Set ID: 19916238
Version: 1, Version Date: 04/06/2015
Page 7
MCU13/0247.01
Appeal Rights
SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING
REGULATION 2009
The following is an extract from the Sustainable
Planning Act 2009 (Chapter 7)
466 Appeals about decisions relating to
permissible changes
(1) For a development approval given for a
development application, the following persons
may appeal to the court against a decision on a
request to make a permissible change to the
approval—
(a) if the responsible entity for making the
change is the assessment manager for
the application—
(i) the person who made the
request; or
(ii) an entity that gave a notice
under section 373 or a pre-
request response notice about
the request;
(b) if the responsible entity for making the
change is a concurrence agency for the
application—the person who made the
request.
(2) The appeal must be started within 20 business
days after the day the person is given notice of
the decision on the request under section 376.
(3) Also, a person who has made a request under
section 369 may appeal to the court against a
deemed refusal of the request.
(4) An appeal under subsection (3) may be started at
any time after the last day the decision on the
matter should have been made.
Page 7 of 7