Flood Management
20. Access along the entire route between all habitable buildings and the jetty shall be a
minimum level of 0.9m AHD.
21. Install, maintain and monitor an on-site Alert System in accordance with Section 4 of the
Flood Emergency Plan listed in this Decision Notice.
22. The development shall be operated in accordance with the Flood Emergency Plan listed in
this Decision Notice and any updates of this plan. The plan shall be reviewed on an annual
frequency to incorporate lessons learned during the previous 12 month period. A
Registered Professional Engineer Queensland specialising in hydraulics and hydrology
shall be consulted if significant changes are required.
Plumbing, Drainage and Waste Water Treatment and Disposal
23. The development must be provided and operate in accordance with a Plumbing, Drainage
and an On-site Waste Water Treatment and Effluent Disposal System having a capacity
sufficient for the use and a wet weather storage facility with a 10,000 litre or 4 days storage
capacity at peak design flow as per the Future-Plus Environmental, Assessment of Existing
Wastewater Infrastructure.
5. REFERRAL AGENCIES
Not Applicable.
6. APPROVED PLANS
The following plans are Approved Plans for the development:
Approved Plans
PlanNo. [Rev |PlanNameSSSSC=«dte SC
VMRRNO A01 Site Plan 13/04/2007
LS01 Preliminary Landscape Plan Site Setout part 1 | 05-06-07
prepared by Landgraphics
LSO2 Preliminary Landscape Plan Site Setout part 2 | 05-06-07
prepared by Landgraphics
LSO3 Preliminary Landscape Plan Site Setout part 3 | 05-06-07
prepared by Landgraphics
7. _REFERENCED DOCUMENTS
The following documents are referenced in the assessment manager conditions:
Referenced Documents
‘DecumentNo. [Rev |DocumentName SSSSC« Date
CIV1063 1.2 Flood Emergency Management Plan — Makepeace | 17/09/2013
Island, Noosa Queensland, prepared by Contour
Consulting Engineers
AD07631REHAB Weed Management and Vegetation Rehabilitation | 15/05/07
Plan, prepared by Duke Environmental
FM1404/9-01/10/2013 Page 12
Page 59 of 231See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.