Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2014-03-25 Planning & Organisation Committee Agenda Pages 39-80

of 42

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   25 MARCH 2014




                                                   Page 59 of 231

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 25 MARCH 2014

  HYDRAULICS AND WATER QUALITY

         Flood Management
  20.    Access along the entire route between all habitable buildings and the jetty shall be a
         minimum level of 0.9m AHD.

  21.    Install, maintain and monitor an on-site Alert System in accordance with Section 4 of the
         Flood Emergency Plan listed in this Decision Notice.
  22.    The development shall be operated in accordance with the Flood Emergency Plan listed in
         this Decision Notice and any updates of this plan. The plan shall be reviewed on an annual
         frequency to incorporate lessons learned during the previous 12 month period. A
         Registered Professional Engineer Queensland specialising in hydraulics and hydrology
         shall be consulted if significant changes are required.
         Plumbing, Drainage and Waste Water Treatment and Disposal
  23.    The development must be provided and operate in accordance with a Plumbing, Drainage
         and an On-site Waste Water Treatment and Effluent Disposal System having a capacity
         sufficient for the use and a wet weather storage facility with a 10,000 litre or 4 days storage
         capacity at peak design flow as per the Future-Plus Environmental, Assessment of Existing
         Wastewater Infrastructure.

  5.   REFERRAL AGENCIES

  Not Applicable.

  6.   APPROVED PLANS

  The following plans are Approved Plans for the development:
  Approved Plans
PlanNo.          [Rev |PlanNameSSSSC=«dte SC
  VMRRNO A01               Site Plan                                         13/04/2007
  LS01                     Preliminary Landscape Plan Site Setout part 1 | 05-06-07
                           prepared by Landgraphics
  LSO2                     Preliminary Landscape Plan Site Setout part 2 | 05-06-07
                           prepared by Landgraphics
  LSO3                     Preliminary Landscape Plan Site Setout part 3 | 05-06-07
                           prepared by Landgraphics

  7.    _REFERENCED DOCUMENTS

  The following documents are referenced in the assessment manager conditions:
  Referenced Documents
 ‘DecumentNo.     [Rev |DocumentName                           SSSSC« Date
  CIV1063           1.2    Flood Emergency Management Plan — Makepeace | 17/09/2013
                           Island, Noosa Queensland, prepared by Contour
                           Consulting Engineers
  AD07631REHAB             Weed Management and Vegetation Rehabilitation | 15/05/07
                           Plan, prepared by Duke Environmental

  FM1404/9-01/10/2013                                                               Page 12

                                                                                   Page 59 of 231
Log in to download the original file

2014-03-25 Planning & Organisation Committee Agenda Pages 39-80(PDF, 6MB).pdf · 6.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.