SUPERSEDED - Decision Notice MCU22/0082 OPW22/0134 [As Published]

of 14

Page text shows just the words. Original shows the document exactly as it was published.

               62.    The developer must ensure non-essential exposure of soil is prevented by restricting the
                      extent of disturbance and minimising the duration of soil exposure to adverse weather
                      conditions and effectively turf, cover or stabilise any disturbed area without delay and prior
                      to rainfall occurring.
               63.    The developer must ensure sediment does not leave the site or enter onto adjoining
                      properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or
                      machinery. It is essential to implement appropriate approved erosion and sediment control
                      measures throughout the site during all phases of construction including vehicle shakedown
                      pad/grid (or similar) at the access to the construction site. Where sediments or other
                      contaminants are deposited on a road, they must be removed so as not to enter Council’s
                      drainage system or waterways.
               Damage to Services and Assets
               64.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
               where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
               FOLLOWING CONSTRUCTION
                      Certification
               65.    Upon completion of the work a certificate must be issued by an RPEQ certifying that the
                      works have been constructed in accordance with the Operational Works permit.
               66.    A final inspection and approval of the new driveway and completed reinstatement works by
                      Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
                      inspection.
               67.    Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                           Plan No.           Rev.   Plan/Document Name                            Date

                           LA-SF-2204-01-     D      Landscape Cover Page                          27 Oct 2022
                           001

                           LA-SF-2204-01-     D      Landscape Surface Finishes Plan               27 Oct 2022
                           101

                           LA-PP-2204-01-     D      Landscape Planting Plan                       27 Oct 2022
                           201

                           LA-DT-2204-01-     D      Landscape Details                             27 Oct 2022
                           300

                           LA-DT-2204-01-     D      Landscape Details                             27 Oct 2022
                           301

                           LA-DT-2204—01- D          Landscape Elevation                           27 Oct 2022
                           400




                                                                                                      Page 9 of 14
Document Set ID: 22208842
Version: 4, Version Date: 14/12/2022
Log in to download the original file

SUPERSEDED - Decision Notice MCU22_0082 OPW22_0134 [As Published].pdf · 223 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.