Original source · versioned page text
RFI (rec. 5.06.26) 2567 - Appendix C - Waste Management Plan (WMP) (Ver. 2)
Original PDF page 12, section 1. The text section number identifies this passage in the reader.
There is no expected adverse impact on the amenity associated with the collection of waste from the development. Waste collection can be conducted in line with Noosa Council requirements. 4.3 Servicing Manoeuvres The design vehicle turning paths have been considered for the staged development and ensure that the waste collection vehicle (HRV) can safely manoeuvre at each stage of the development. For Stage 1, the HRV will enter the site via Taylors Court, undertake a three- point turn at the end of Stage 1, and collect the Stage 1 bins in a front-on orientation before exiting the site in a forward direction (See Appendix B). With the construction of Stage 2, the HRV can extend its path into this area, where adequate space is available to safely manoeuvre and service the bins (See Appendix B). Upon completion of Stage 4, the HRV is able to drive through the site in a clockwise direction to the northern portion of the site, with the turning paths confirming that the vehicle can manoeuvre within this stage and return to the site access in a forward direction (See Appendix B). Servicing for an articulated vehicle (AV) has been provided where the AV can safely manoeuvre by reversing in and forward out as shown on turning paths (Appendix B). Temporary AV parking has been provided in Stage1 until Stage 4 has been built. 2576-WMP-01 v2 (April 2026) Page 9 of 16 EA/TB
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.