Skip to the record
Search everything, all in one place.

Original source · versioned page text

RFI (rec. 5.06.26) 2567 - Appendix C - Waste Management Plan (WMP) (Ver. 2)

of 25

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 13, section 1. The text section number identifies this passage in the reader.

5.0 CONCLUSION

This waste management plan has reviewed the proposed development with respect to waste
generation, storage and disposal on site. It is determined that waste generated on site will not
be of significant quantities and that the generated waste will not be of a hazardous nature.


Based on the estimated waste generation rate, a total of eleven (11) 2 cubic meter bins are to
be stored in the proposed bin storage facility on site. Each tenant is responsible for disposing
of their own waste into the general waste bins, with no kerbside collection provided, as all
recycling and general waste will be collected by a waste collection vehicle entering the site.
The internal driveway and manoeuvring areas have been designed to accommodate a Heavy
Rigid Vehicle (HRV), allowing safe entry, servicing and exit in a forward direction.




2576-WMP-01 v2 (April 2026)                                                      Page 10 of 16
EA/TB

Log in to download the original (RFI (rec. 5.06.26) 2567 - Appendix C - Waste Management Plan (WMP) (Ver. 2).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.