Original source · versioned page text
Bushfire Hazard Assessment and Management Plan
Plans and drawings: the text below has words only, no drawings.
The proposed development is constrained by the SPP Bushfire Prone Areas Overlay code and NSP2020 overlay code; compliance
against the code assessment tables is required.
8.1 Compliance with SPP State Interest Natural Hazards Risk and Resilience – Bushfire
Policy Positions
Compliance with SPP State Interest Natural Hazards Risk and Resilience – Bushfire Policy Positions
The following table provides compliance assessment against the SPP State Interest Natural Hazards Risk and Resilience –
Bushfire policy statements and also provides compliance pathways to the associated SPP Guidance material (2021) and the
Technical Reference Guideline to the SPP Bushfire Resilient Communities all of which hold specific requirements in the ability for
development of a local government instrument to be representative of the state interest. It is considered that demonstrating the
proposed development’s compliance with the specific requirements of these policy documents a surrogate for demonstrating
that the SPP policy positions can be achieved.
Table L – SPP statements compliance pathway assessment.
Technical Reference
Compliance pathway
SPP 2017 SPP Guidance 2021 Guide
Policy 1 – COMPLIES
Mapping is robust and Bushfire Prone Areas are identified.
locally relevant. Desktop interrogation of current State and
▪ As a minimum the local mapping identified medium and high
▪ In the first instance use State- state-wide mapping potential hazard areas encompassing the
Policy 1 –
wide Mapping product should be applied, and subject site. The potential impact buffer is
Bushfire
local government mapped over majority of the subject site
Prone Areas ▪ Locally verify the mapping where
should refine the state- with the southern extent of the site located
to be resources permit
wide mapping using outside of bushfire prone area. This report
identified
the process outlines in has provided a reliability assessment and
the technical reference identified potential bushfire prone areas on
guide. the site and provides site specific locally
verified mapping.
Policy 2 –
A fit for purpose risk
assessment informs plan
making or amendments to
achieve an acceptable or
tolerable level of risk to
people and property in BPA.
Policy 2 – ▪ A risk assessment COMPLIES
The risk assessment to be consistent
A Fit- For- should be undertaken This Bushfire Hazard Assessment and
with AS/NZS ISO 31000:2018 Risk
Purpose risk when making or Management Plan has provided a Fit-For-
Assessment Principles and Guidelines
assessment amending a planning Purpose risk assessment in alignment with
is undertaken scheme. IS:31000:2018 principles.
▪ A local government
may provide
applicants with the
ability to locally verify
mapping.
Policy 3-
Not relevant
to the NA NA NA
Bushfire
State Interest
Policy 4 – ▪ The outputs of the risk Policy 4 – COMPLIES
Development assessment should inform the The Planning Scheme or Policy 4 compliance can be achieved with
avoids the drafting of the strategic amendments following a the adoption of the principle of risk
www.thereforgroup.com.au 24-0565E/BF | Sunshine Butterflies | Bushfire Management Plan | 12.03.2026 | Version 1.0 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.