Bushfire Hazard Assessment and Management Plan
Plans and drawings: the text below has words only, no drawings.
natural framework and assessment risk assessment are based avoidance, risk minimisation and risk
hazard area, requirements based on avoiding on the principle of mitigation.
and where it the risk in the first instance and avoidance as the first Total avoidance of the hazard is not
is not where it cannot be avoided, priority, and then mitigation practicable given the application’s
possible to achieving an acceptable or of the risk to an acceptable connection to existing surrounding land
avoid tolerable level of risk for both or tolerable level uses. However, this report has assessed
mitigates the existing and new development. identified potential bushfire prone areas
risk to an and deemed the bushfire risk to proposed
▪ Growth and/or the intensification
acceptable or lots and structures as tolerable with the
of development in mapped
tolerable implementation of mitigation measures
higher risk BPA should be avoided
level. outlined within Section 7 of this BMP.
unless appropriate controls are
implemented.
▪ Key planning responses mitigate Policy 4 –
impact from sources of bushfire Disaster management
attack including subdivision capacity and capabilities are
Policy 4 –
layout with adequate access, maintained to mitigate the
Disaster management capacity and
includes low fuel areas to reduce risks to people and property
capabilities are maintained to mitigate the
radiant heat exposure and to an acceptable and
risks to people and property to an
Policy 5 – landscape design / ongoing tolerable level.
acceptable and tolerable level. In the
Development vegetation management to Policy 5-
context of the proposed subdivision, the
in natural reduce fuel loads and structure. Lot and neighbourhood
reconfiguration depicts a designated access
hazard areas layout and design mitigates
▪ Disaster management capacity is easement which facilitates direct access to
supports and the risks to people and
not compromised as a result of serviced public roads and provide
does not property to an acceptable
inadequate access for emergency adequate space for firefighter in the event
hinder and tolerable level.
services, inadequate water of an emergency, effectively mitigation the
disaster Policy 6-
supply, provides alternative safe bushfire risk to a tolerable level.
management Vulnerable Uses are not
access/egress and provides Policy 5-
capacity and located in BPA unless there
opportunity to establish control Best practice bushfire mitigation urban
capability, is an overwhelming
lines for hazard reduction and design principles have been adopted with
avoids community need for the
back burning operations. As such, what can generally be described providing
increase in development of a new or
provisions in RaL and other codes a minimum separation distance between
exposure or expanded service and there
should consider the above. hazard vegetation and new structures to
severity of is no suitable alternative
ensure radiant heat level don’t exceed
the hazard, ▪ Vulnerable uses are specified and location, and site planning
29kW/m2. As such, it is considered that
avoids risk to policy position regarding can adequately mitigate the
adequate design principles have been
public safety vulnerable uses to be articulated risk.
included to mitigate the risks to people and
and with avoidance in BPA unless Policy 7-
property to an acceptable and tolerable
environment overriding need and lack of ither Revegetation and
level.
from storage suitable location is justified. rehabilitation avoids an
Policy 6 and 7- Not applicable. No
of hazardous Levels of assessment should increase in the exposure or
vulnerable uses have been identified and
materials and reflect the policy position in severity of bushfire hazard
no proposed rehabilitation is inclusive in
their release regard to vulnerable uses. Policy 8-
the design.
and Development does not
▪ Revegetation and rehabilitation Policy 8-
maintains the locate buildings or
for proposed developments do Storage of dangerous goods and / or
protective structures used for the
not result in increased area of hazardous materials in quantities that
function of storage or manufacture of
BPA or an increase in exposure to would represent a risk are not proposed.
landforms materials that are hazardous
bushfire intensity. Policy 9 –
and in the context of a bushfire
The protective function of vegetation
vegetation ▪ Hazardous materials in the within a bushfire prone are
arrangements that can mitigate bushfire
that can context of bushfire exposure are unless there is no suitable
risk are maintained. Detailed design
mitigate risk identified and locating alternative location.
applications are to include
development associated with the Policy 9 –
recommendations to limit the potential of
production or storage of such The protective function of
site landscaping increasing ignition risk.
materials avoids BPA. Such vegetation arrangements
developments should be that can mitigate bushfire
classified as code or impact risk are maintained.
assessable and be linked to
www.thereforgroup.com.au 24-0565E/BF | Sunshine Butterflies | Bushfire Management Plan | 12.03.2026 | Version 1.0 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.