Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail MCU16/0081 Geotechnical report, Landscape Plan, SMP, Traffic report - Email 3 of 3.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSC5594 – Walter Hay Dr, Noosaville 11 4.3 Modelling Overview 4.3.1 Methodology The software package XP-STORM V2016, has been used to model the site in its current and post- developed state. The modelling has been undertaken to determine detail design parameters of on-site detention to replicate pre-development peak flow rates. As the development falls within the ‘Urban Residential’ development category (QUDM Table 7.02.1), the minor (10yr ARI) and major (100yr ARI) storm events were primarily sized for underground and overland design flows respectively. All events ranging from 1, 2, 5, 10 20, 50 and up to the 100yr were analysed to compare pre/post development discharges ensuring ‘non-worsening’ discharge. The development modelling and analysis undertaken was based on the information provided by the detailed site survey and preliminary architectural layouts. A rational method check of the pre-development scenario was conducted to calibrate the XP- STORM model. 4.3.2 Catchment Areas The subject site has been modelled in its existing pre-development and proposed post-development states with the catchment areas illustrated in Tables 4.1 & 4.2 and Appendix A. In its pre-development state the subject site was modelled as one hydrologic node to replicate the existing sheet flow situation for the lot. XP-STORM model outputs are included in Appendix C of this report. Node Description % Impervious Area (Ha) ‘PRE’ Landscape 0 0.890 Total Catchment (ha) 0 0.890 Table 4.1 - Pre Development Node Sub-Catchment Areas Node Description % Impervious Area (Ha) Combined Roof 100 0.355 Post-development Carpark/hardstand areas 100 0.197 Catchments Landscape 0 0.441 Total Catchment (ha) 55 0.993 Table 4.2 - Post Development Sub–Catchment Areas
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.