Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Stormwater Management Plan

Attached to the e-mail MCU16/0081 Geotechnical report, Landscape Plan, SMP, Traffic report - Email 3 of 3.

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
SC5594 – Walter Hay Dr, Noosaville                                                            13




A concept drainage layout plan has been included as Appendix A of this report.


4.4      Modelling Results
A node layout plan is included in Appendix C of this report and the resultant peak flow rates are displayed
in Table 4.3 & 4.4.


ARI           Design Storm (min)     Peak Flow (m3/s)
1             90                     0.101
2             60                     0.150
5             60                     0.208
10            60                     0.247
20            60                     0.289
50            60                     0.335
100           60                     0.383
Table 4.3 – Pre-Development Peak Flow Rate Results

                                                   3
ARI           Design Storm (min)     Peak Flow (m /s)
1             60                     0.101
2             60                     0.118
5             60                     0.133
10            60                     0.158
20            60                     0.249
50            60                     0.324
100           60                     0.382
Table 4.4 – Post-Development (mitigated) Peak Flow Rate Results


As can be seen in Tables 4.3 & 4.4 the post-development peak flow rates to the existing drainage system
compare well to that of the existing pre-development site discharges. This is due to the large volumes of
on-site detention proposed to be included as part of the development.
Log in to download the original file

Stormwater Management Plan.pdf · 1.5 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.