Stormwater Management Plan
Attached to the e-mail MCU16/0081 Geotechnical report, Landscape Plan, SMP, Traffic report - Email 3 of 3.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSC5594 – Walter Hay Dr, Noosaville 13
A concept drainage layout plan has been included as Appendix A of this report.
4.4 Modelling Results
A node layout plan is included in Appendix C of this report and the resultant peak flow rates are displayed
in Table 4.3 & 4.4.
ARI Design Storm (min) Peak Flow (m3/s)
1 90 0.101
2 60 0.150
5 60 0.208
10 60 0.247
20 60 0.289
50 60 0.335
100 60 0.383
Table 4.3 – Pre-Development Peak Flow Rate Results
3
ARI Design Storm (min) Peak Flow (m /s)
1 60 0.101
2 60 0.118
5 60 0.133
10 60 0.158
20 60 0.249
50 60 0.324
100 60 0.382
Table 4.4 – Post-Development (mitigated) Peak Flow Rate Results
As can be seen in Tables 4.3 & 4.4 the post-development peak flow rates to the existing drainage system
compare well to that of the existing pre-development site discharges. This is due to the large volumes of
on-site detention proposed to be included as part of the development.