PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 JUNE 2017
26. Plans shall be submitted to the Council for approval that clearly show the type and extent of
pavements proposed, how they comply with the above conditions and also illustrating any
temporary fencing to protect the trees prior to obtaining a Development Permit for
Operational Works.
Fauna Management
27. Vegetation must only be removed or disturbed in accordance with a Fauna Management
Plan (or part thereof) prepared by a qualified person* and endorsed through an Operational
Works approval. The Fauna Management Plan must include a plan showing all trees in
developable site in relation to the approved development.
*(Refer to Advisory Note)
Bushfire Information Kit
28. A Bushfire Information Kit must be submitted for approval and endorsed through an
operational works approval. The kit must provide clear and practical instructions regarding
the bushfire management requirements of the covenant area. These instructions are to be
in plain English, logical format, provide concise direction for the management of the
covenant area in accordance with the approved Bushfire Management Plan.
Frontage Works
29. Footpath improvements such as topsoiling, grassing, and tree planting are required to the
Serenity Close frontage of the site (if not already provided) in accordance with Planning
Scheme Policy PSP3 Landscaping Plants and Guidelines. Grass shall be couch, free of
weeds.
30. A new 1.5 metre wide concrete path shall be constructed along the Serenity Close frontage
of the site (if not already provided) in accordance with Council’s design standards and to an
alignment that protects any significant vegetation or any underground services.
31. All paths shall be designed and constructed to ensure pedestrian safety using non-slip
materials and to produce an evenly graded surface finish.
Stormwater Drainage
32. All stormwater drainage shall be collected on site and discharged so there is no net
increase in stormwater runoff from the site.
33. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property.
The works must be undertaken in accordance with an Operational Works approval and
must include in particular a drainage system generally in accordance with the approved
Environmental Management Plan for the Settlers Cove development.
34. On site swale drains will be required to capture and direct any overland stormwater runoff
to the Infiltration Pits proposed on site. These swales shall be sized to carry a 3-month
storm event and plans detailing their capacity, location, length, width and grades shall be
submitted to Council for approval.
35. All site stormwater drainage shall be by means of a gravity system.
36. Plans of the entire on-site drainage design must be prepared by a Registered Professional
Civil Engineer and submitted to Council prior to obtaining a Development Permit for
Operational Works.
Electricity and Telecommunication Services
37. Unless otherwise stipulated by telecommunications legislation at the time of construction,
the development must be provided with all necessary conduits, pits and pipes to
accommodate the future connection of optic fibre technology telecommunications.
Page 42 of 73
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.